Tytuł:
Overview of the organisation and technology of portable panel bridges
Autorzy:
Ostrowska, Alicja
Chmielewski, Ryszard
Powiązania:
https://bibliotekanauki.pl/articles/2201994.pdf
Data publikacji:
2023
Wydawca:
Centrum Rzeczoznawstwa Budowlanego Sp. z o.o.
Tematy:
folding bridges
construction technology
construction organization
most składany
technologia budowy
organizacja budowy
Opis:
The article presents examples of the use of portable bridge structures in civil engineering. Due to the possibility of combining elements of these structures into a variety of complex spatial arrangements, they could be widely used. Various technologies and principles of organisation of the construction of engineering structures of pre-fabricated bridges are presented. The presented solutions are both technologies known and used since the beginning of the history of panel bridges, as well as new technologies, developed on the basis of practical experience of engineers. The article presents selected scientific principles of work organisation, influencing the maintenance of a high rate of implementation of the construction project. The article also analyses the influence of location conditions, different from typical standard assembly stations, on the technology and organization of construction.
Źródło:
Inżynieria Bezpieczeństwa Obiektów Antropogenicznych; 2023, 1; 46--52
2450-1859
2450-8721
Pojawia się w:
Inżynieria Bezpieczeństwa Obiektów Antropogenicznych
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Kontynuacja projektowania i wykonania robót budowlanych w zakresie autostrady A-2 od Strykowa do Konotopy – odcinek A
Continuation of designing and carrying out construction works regarding the A-2 motorway from Stryków to Konotopa – section A
Autorzy:
Horst, P.
Powiązania:
https://bibliotekanauki.pl/articles/163400.pdf
Data publikacji:
2018
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
A2
autostrada
projektowanie
organizacja budowy
przebieg budowy
motorway
designing
construction organization
construction course
Opis:
W artykule autor przybliżył historię pozyskania oraz realizacji kontraktu na dokończenie fragmentu autostrady A2 przed UEFA Euro 2012. Opisał wyzwania, jakim musiał podołać wykonawca, aby prace zostały zrealizowane w terminie, który przez wielu postrzegany był jako nierealny.
In the article the author presents how a contract for completion of a section of A2 motorway prior to UEFA Euro 2012 was obtained and performed. The article describes what challenges the contractor was facing to complete works before a deadline many considered unrealistic.
Źródło:
Przegląd Budowlany; 2018, 89, 4; 30-32
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Humanizacja i prefabrykacja - Ursynów Północny. Cz.2
Autorzy:
Ilmurzyńska, K.
Powiązania:
https://bibliotekanauki.pl/articles/129261.pdf
Data publikacji:
2017
Wydawca:
PWB MEDIA Zdziebłowski
Tematy:
osiedle mieszkaniowe
budynek prefabrykowany
układ urbanistyczny
struktura miejska
organizacja budowy
housing estate
prefabricated building
urban layout
urban structure
construction organization
Opis:
Dostosowanie architektury mieszkaniowej do produkcji masowej było jednym z głównych postulatów Le Corbusiera, a potem grupy Bauhaus, realizowanym przez cały okres rozwoju modernizmu. Punktem kulminacyjnym tego procesu było europejskie powojenne uprzemysłowione budownictwo mieszkaniowe, dominujące w różnych krajach od lat 60. do lat 80. XX wieku. W tym czasie prefabrykację uznawano za najbardziej innowacyjną technologię budowlaną. W latach 90. powszechnie uważano ten okres za nieudany epizod i ślepą uliczkę w rozwoju budownictwa, obecnie jednak wydaje się on raczej jednym z etapów jego ewolucji, a prefabrykację ponownie zalicza się do obiecujących innowacji technologicznych. Mimo oczywistego postępu zaawansowania technologicznego cele i warunki prefabrykacji wymieniane przez jej zwolenników są takie same jak 50 lat temu. Wysoki poziom organizacji i technologii, a także zdecentralizowany i sieciowy model produkcji nie likwidują podstawowych sprzeczności między specyfiką przemysłu a środowiska zbudowanego. Rozważając zwiększenie skali prefabrykacji we współczesnym budownictwie, należy więc przeanalizować lekcje płynące z doświadczeń ubiegłego wieku. Okres monopolu prefabrykowanego budownictwa w latach 70 w państwach tzw. bloku wschodniego zasługuje na uwagę tym bardziej, że wyróżnia się na tle doświadczeń państw zachodnich skalą i intensywnością, przez co jaskrawo uwidacznia zalety i wady uprzemysłowienia. Praca nakreśla charakterystykę systemów użytych przy budowie zespołu osiedli Ursynowa Północnego w latach 1974-1978, sposób ich zastosowania i modyfikacji w projekcie oraz stopień rzeczywistej realizacji założeń systemowych i projektowych.
Źródło:
Builder; 2017, 21, 2; 36-39
1896-0642
Pojawia się w:
Builder
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Construction-fitting process organization and management in a small business
Autorzy:
Respondek, Z.
Powiązania:
https://bibliotekanauki.pl/articles/111976.pdf
Data publikacji:
2017
Wydawca:
Stowarzyszenie Menedżerów Jakości i Produkcji
Tematy:
construction process organization
management in construction
small construction company
organizacja procesu budowlanego
zarządzanie w budownictwie
mała firma budowlana
Opis:
The article presents results of research concerning identification of organization schemes and management processes that make a small construction company function efficiently and hold against other entities in local markets. It was estimated to what extent the classic principles for organization and management are realized in a small construction company. Basic for that evaluation were the Toyota management principles and the HR organization principles as gathered and quoted by Rowiński. The research was conducted with the guided interview method, supplemented by CAWI (Computer-Assisted Web Interview) survey. Based on the information gathered the characteristics of organization and management of small construction companies active in the business of finishing works were described. The most important elements presented were the owner-employee relations, scope of activities performed personally by the owner, quality assurance methods for works, scope of cooperation with other entities, mode of customer acquisition and ways in which new technologies are adopted. It was found that there is large coincidence between organizational and management principles applied in researched companies, and the rules for the Toyota manufacturing processes, slightly lower coincidence was found in case of analysis of the rules quoted by Rowiński. The research has shown the large universality of the rules found in literature – these are largely accomplished, even without owners and employees having the knowledge about their exact reading.
Źródło:
Production Engineering Archives; 2017, 14; 40-44
2353-5156
2353-7779
Pojawia się w:
Production Engineering Archives
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Etos współczesnego inżyniera budownictwa
The ethos of a modern civil engineer
Autorzy:
Obolewicz, Jerzy
Baryłka, Adam
Powiązania:
https://bibliotekanauki.pl/articles/2081888.pdf
Data publikacji:
2022
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
budownictwo
inżynieria lądowa
inżynier budowlany
etyka zawodowa
kodeks etyczny
plac budowy
organizacja budowy
construction
civil engineering
civil engineer
professional ethics
code of ethics
construction site
construction organization
Opis:
Etos to zespół norm, wartości, kryteriów charakteryzujących określone środowisko. W artykule poruszono problematykę etyki zawodowej w obszarze inżynierii lądowej. W Polsce coraz częściej dyskutowane są kwestie potrzeby tworzenia etyki dla poszczególnych grup zawodowych. Wynika to z faktu, że etyka zawodowa ułatwia wykonywanie określonego zawodu, wpływa na jego prestiż, pomaga w rozwiązywaniu konfliktów, przyśpiesza podejmowanie decyzji, daje wskazówki obyczajowe i dotyczące perfekcjonizmu zawodowego, zakreśla i uzasadnia granice odstępstwa od norm powszechnych oraz nakazuje w pewnych wypadkach traktować obowiązki ogólnie uznane za nadzwyczajne jako podstawowe.
Ethos is a set of norms, values and criteria that characterize a specific environment. The article deals with the issues of professional ethics in the field of civil engineering. In Poland, the issues of the need to create ethics for individual professional groups are being discussed more and more often. This is due to the fact that professional ethics facilitates the performance of a specific profession, influences its prestige, helps in resolving conflicts, accelerates decision-making, gives moral and professional guidelines for professional perfectionism, outlines and justifies the limits of deviation from common norms, and in some cases requires the treatment of obligations generally recognized as extraordinary as basic.
Źródło:
Przegląd Budowlany; 2022, 93, 3-4; 79--84
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Technical note. Outlays on construction of airport runways with prestressed and dowelled pavements
Autorzy:
Więckowski, A.
Sznurawa, A.
Powiązania:
https://bibliotekanauki.pl/articles/178915.pdf
Data publikacji:
2015
Wydawca:
Politechnika Wrocławska. Oficyna Wydawnicza Politechniki Wrocławskiej
Tematy:
dowelled runway
prestressed concrete
technology and organization of construction
Opis:
For two variants of runways with abrasive concrete pavements in the prestressed and dowelled technologies, analyses have been presented regarding labour, materials, use of machinery, and financial outlays, together with the necessary technological-organisational analyses and assessment of work execution cycles, by the example of construction of a runway at the Katowice Airport.
Źródło:
Studia Geotechnica et Mechanica; 2015, 37, 3; 101-111
0137-6365
2083-831X
Pojawia się w:
Studia Geotechnica et Mechanica
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Wpływ innowacji IT na technologie ziemnych budowli dróg lądowych
Impact of IT innovations on road earthworks technology
Autorzy:
Gradkowski, K.
Powiązania:
https://bibliotekanauki.pl/articles/144668.pdf
Data publikacji:
2016
Wydawca:
Stowarzyszenie Inżynierów i Techników Komunikacji Rzeczpospolitej Polskiej
Tematy:
budowle ziemne
innowacje IT
organizacja budowy
earthworks
IT innovations
organization of construction
Opis:
W artykule omówiono usprawnienia i korzystne zmiany w technologii wykonania budowli ziemnych dróg wywołane wdrożeniem innowacji technik informatycznych IT. Przedstawiono też możliwości zmian w organizacji i zarządzaniu przedsiębiorstw budowlanych realizujących duże i średnie przedsięwzięcia w zakresie budownictwa transportowego, jak również możliwości zmian w organizacji budów.
Improvement and positive development of road earthwork technology induced by implementation of the computer IT technology innovations are the subject of description in this paper. There are also discussed visions of changes in organization and management of contractors having large and medium size contracts in transport infrastructure engineering and changes in organization of individual projects.
Źródło:
Drogownictwo; 2016, 9; 288-291
0012-6357
Pojawia się w:
Drogownictwo
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Zagadnienia realizacji centrów handlowo-rozrywkowych na przykładzie budowy Galerii Malta w Poznaniu
Issues of the shopping and entertainment centre realisation on the example of the Galeria Malta in Poznan
Autorzy:
Rutkowski, M.
Skarzyński, A.
Powiązania:
https://bibliotekanauki.pl/articles/403195.pdf
Data publikacji:
2011
Wydawca:
Politechnika Białostocka. Oficyna Wydawnicza Politechniki Białostockiej
Tematy:
centra handlowe
technologia i organizacja realizacji budowy
shopping centers
technology and organization in the construction
Opis:
W artykule przedstawiono ogólną charakterystykę centrów handlowo-rozrywkowych. Następnie na jej podstawie wyszczególniono specyficzne cechy realizacji obiektów tego rodzaju. Wyróżniono fazę przedrealizacyjną ze szczególnym uwzględnieniem kwestii lokalizacji, a także fazę realizacji obiektu, w której co jest oczywiste, występuje najwięcej problemów. Najdłuższa część artykułu poświęcona jednak została na omówienie zagadnień budowy przykładowej inwestycji. Jest nią centrum handlowe Galeria Malta w Poznaniu.
The general characteristics of shopping and entertainment centres was presented. Then based on the specific features of implementation of this kind of objects were done. Phase before implementation with particular emphasis on location, as well as the implementation phase of the object containing the most problems what is obvious were distinguish. However, most space of the paper is devoted to the discussion of issues of the construction of the exemplary investment. It is the Galeria Malta in Poznan.
Źródło:
Budownictwo i Inżynieria Środowiska; 2011, 2, 4; 645-649
2081-3279
Pojawia się w:
Budownictwo i Inżynieria Środowiska
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Wytwarzanie slepoty i jej organizacyjne konstruowanie w szkole podstawowej.
CRAFTING BLINDNESS: ITS ORGANIZATIONAL CONSTRUCTION IN A FIRST GRADE SCHOOL.
Autorzy:
Gobo, Giampietro
Powiązania:
https://bibliotekanauki.pl/articles/1373931.pdf
Data publikacji:
2009
Wydawca:
Uniwersytet Łódzki. Wydawnictwo Uniwersytetu Łódzkiego
Tematy:
BLINDNESS
DISABILITY STUDIES
ERGONOMICS
ETHNOGRAPHY
ETHNOMETHODOLOGY
GROUNDED THEORY
ORGANIZATION
SOCIAL CONSTRUCTION
Opis:
This article is based on a case study conducted in an Italian primary school where the interactions between a sightless girl (named Jasmine, aged 8) and her classmates were extensively observed. The initial aim was to understand and describe the problems encountered by the sightless pupil, who acted in a social, organizational and physical environment which was not designed for handicapped people. However, other theoretical issues emerged during the research. The main finding was that sightlessness seems socially and organizationally constructed before it becomes a biological/physical handicap. The organizational processes through which the blindness is slowly and routinely constructed were extensively described.
Źródło:
Przegląd Socjologii Jakościowej; 2009, 5, 2; 118-134
1733-8069
Pojawia się w:
Przegląd Socjologii Jakościowej
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Crafting Blindness: Its Organizational Construction in a First Grade School
Autorzy:
Gobo, Giampietro
Powiązania:
https://bibliotekanauki.pl/articles/2138547.pdf
Data publikacji:
2008-04-30
Wydawca:
Uniwersytet Łódzki. Wydawnictwo Uniwersytetu Łódzkiego
Tematy:
Blindness
Social construction
Disability studies
Organization
Grounded theory
Ethnomethodology
Ethnography
Ergonomics
Opis:
This article is based on a case study conducted in an Italian primary school where the interactions between a sightless girl (named Jasmine, aged 8) and her classmates were extensively observed. The initial aim was to understand and describe the problems encountered by the sightless pupil, who acted in a social, organizational and physical environment which was not designed for handicapped people. However, other theoretical issues emerged during the research. The main finding was that sightlessness seems socially and organizationally constructed before it becomes a biological/physical handicap. The organizational processes through which the blindness is slowly and routinely constructed were extensively described.
Źródło:
Qualitative Sociology Review; 2008, 4, 1; 92-108
1733-8077
Pojawia się w:
Qualitative Sociology Review
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Zarządzanie zadaniami pracowników w branży budowlanej
Managing the tasks of employees in the construction industry
Autorzy:
Krynke, Marek
Powiązania:
https://bibliotekanauki.pl/articles/2065545.pdf
Data publikacji:
2019
Wydawca:
Politechnika Częstochowska
Tematy:
organizacja pracy
roboty budowlane
programowanie liniowe
work organization
construction works
linear programming
Opis:
Właściwa organizacja pracy polega na takim ustawieniu przebiegu pracy, aby przy najmniejszym nakładzie pracy człowieka lub urządzeń uzyskiwać maksymalne rezultaty działania. Artykuł prezentuje problem przydziału personelu, który występuje w rzeczywistej firmie świadczącej usługi budowlane. Sformułowano model matematyczny dla tego zagadnienia. Przedstawiono algorytm rozwiązujący problem alokacji personelu. Zaproponowana analiza stanowi punkt wyjścia do określenia możliwości usługowych oraz obciążenia każdego pracownika, co jest szczególnie istotne w przypadku stosowania pracy wielostanowiskowej.
The proper organization of work is to set the workflow to the slightest effort of man and machine operation to obtain maximum results. The article presents the problem of the allocation personnel, that occurs in a real company that provides construction services. The mathematical model for this issue was formulated. An algorithm solving the problem of personnel allocation is presented. The proposed analysis is a starting point for determining the production capacity and load of each workstation, which is particularly important when using multi-station work.
Źródło:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym; 2019, 8, 1; 137--145
2299-8535
2544-963X
Pojawia się w:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Drogi Królestwa Polskiego „Kongresowego”
Roads in Polish “Conress” Kingdom
Autorzy:
Suwara, Tadeusz
Powiązania:
https://bibliotekanauki.pl/articles/144624.pdf
Data publikacji:
2019
Wydawca:
Stowarzyszenie Inżynierów i Techników Komunikacji Rzeczpospolitej Polskiej
Tematy:
Królestwo Polskie
drogi twarde
organizacja
budowa
Polish Kingdom
hard roads
organization
construction
Opis:
W tym roku przypada 200 rocznica utworzenia administracji drogowej w Polsce. Na początku XIX roku były tylko drogi gruntowe. Aby zbudować sieć dróg twardych w Królestwie Polskim zależnym od Rosji powołano w 1819 roku Dyrekcję Jeneralną Dróg i Mostów. Prace przy organizacji i budowie dróg nabrały tempa. Zaczęto budować trakty z nawierzchnią z rozdrobnionego kamienia w dwóch lub trzech warstwach, a także z kamienia polnego. Do 1849 roku wybudowano podstawową sieć dróg twardych w całym Królestwie.
This year marks the 200th anniversary of the establishment of road administration in Poland. At the beginning of 19th century there were only dirt roads. In order to build hard road network in the Kingdom, which was dependent on Russia, the General Directorate of Roads and Bridges was established in 1819. Work on road organization and construction has accelerated. The construction of roads with a pavement of crushed stone in two or three layers as well as of field stone was started. By 1849 a basic network of hard roads was built throughout the Kingdom.
Źródło:
Drogownictwo; 2019, 7-8; 227-234
0012-6357
Pojawia się w:
Drogownictwo
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Selected Aspects of the Train Timetable Construction of Passenger Trains with the Consideration of Platform Edges and Stabling Tracks Allocation Problem
Autorzy:
Gołębiowski, Piotr
Powiązania:
https://bibliotekanauki.pl/articles/503760.pdf
Data publikacji:
2019
Wydawca:
Międzynarodowa Wyższa Szkoła Logistyki i Transportu
Tematy:
organization of railway traffic
construction of graphic train timetable
allocation of platform edges
Opis:
The aim of the article is to present a method concerning the problem of the construction of timetable from the point of view of the assignment of platform edges and stabling tracks. Taking into account these two issues in the method is extremely important from the point of view of the fluency of railway traffic, as well as minimizing railway undertaking costs related to access to the infrastructure offered by the manager in terms of occupying the platform edge above the set time. The paper describes the issues of allocating platform edges and stabling tracks in operating offices, with particular consideration of the costs related to this. The formulation of the problem of the train timetable construction was presented, including the allocation of edges and stabling tracks in a mathematical manner. In the model those parts were specified that are relevant to the research problem considered in the article. In addition, the algorithm of the construction method with the use of a block diagram was discussed.
Źródło:
Logistics and Transport; 2019, 41, 1; 91-100
1734-2015
Pojawia się w:
Logistics and Transport
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Selected aspects of construction production engineering in the design of technology and organization of the execution of complex monolithic building structures
Autorzy:
Obolewicz, Jerzy
Wójcicki, Wojciech
Powiązania:
https://bibliotekanauki.pl/articles/1537461.pdf
Data publikacji:
2020
Wydawca:
Centrum Rzeczoznawstwa Budowlanego Sp. z o.o.
Tematy:
construction production engineering
organization technology
monolithic works
inżynieria produkcji budowlanej
technologia organizacji
prace monolityczne
Opis:
Construction objects are anthropogenic objects that meet human needs in the area of housing. They should be designed, made and used in a way ensuring the safety of people and property at every stage of its life cycle. To achieve this effect, the cooperation of designers, contractors and users of the facility is required. It is especially important for building contracting. Safe construction implementation requires the design of technology and organization of works. The article characterizes selected aspects of construction production engineering that should be taken into account when designing the technology and organization of monolithic works.
Źródło:
Inżynieria Bezpieczeństwa Obiektów Antropogenicznych; 2020, 4; 1-13
2450-1859
2450-8721
Pojawia się w:
Inżynieria Bezpieczeństwa Obiektów Antropogenicznych
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Jak Krzysztof Radziwiłł (1585–1640) dwory i zbory budował. Uwagi do organizacji prac budowlanych w dobrach magnackich na Litwie w pierwszej połowie XVII wieku. Część II
How Krzysztof Radziwiłł (1585–1640) built mansions and churches. Notes on the organization of construction works in magnate estates in Lithuania in the first half of the 17th century. Part II
Autorzy:
Zawadzki, Jarosław
Powiązania:
https://bibliotekanauki.pl/articles/29519232.pdf
Data publikacji:
2022
Wydawca:
Uniwersytet Łódzki. Wydawnictwo Uniwersytetu Łódzkiego
Tematy:
Krzysztof Radziwiłł
wojewoda wileński
hetman wielki litewski
Wielkie Księstwo Litewskie
majątek magnacki
rezydencje
budownictwo
organizacja prac budowlanych
czas trwania inwestycji budowlanych
Krzysztof Radziwill
voivode of Vilnius
Grand Hetman of Lithuania
Grand Duchy of Lithuania
magnate estate
residences
construction
organization of construction works
duration of construction investments
Opis:
Tekst stanowi drugą część opracowania dotyczącego prowadzenia prac budowlanych w majątku jednego z najważniejszych litewskich magnatów pierwszej połowy XVII w., Krzysztofa Radziwiłła (1585–1640), wojewody wileńskiego i hetmana wielkiego litewskiego. Przedstawiono w nim pracowników zatrudnionych przy wznoszeniu budowli, od najmniej wykwalifikowanych po architektów i rzeźbiarzy. Uwagę poświęcono także produkcji lub nabywaniu materiałów budowlanych, ich transportowi i gromadzeniu. Następnie przedstawiono sam proces budowania lub remontowania budynków, jego przebieg i czas trwania. W podsumowaniu autor starał się uzasadnić, że na przebieg procesu inwestycyjnego w dobrach Krzysztofa Radziwiłła wpływały jego cechy osobowe i systemu pracy jaki przyjął (ścisła kontrola, monopol podejmowania decyzji, nawet w drobnych sprawach przez księcia, oszczędność). Decydujące jednak znaczenie, według autora, miał system społeczny i gospodarczy panujący w tym czasie w Wielkim Księstwie Litewskim. Duży udział gospodarki naturalnej oraz wąski rynek usług i handlu towarami budowlanymi, powodował nieustanne problemy z utrzymaniem ciągłości i efektywności prac. Skutkowało to nieustannie ponawianymi próbami organizowania prac możliwie w największym stopniu rękami własnych poddanych pańszczyźnianych i za pomocą wytwarzanych we własnych majątkach produktów. Efektem tych zabiegów była zarówno niska jakość produktów, jak i wykonywanej pracy. Mniejsze, lecz ważne, znaczenie miały negatywne zjawiska naturalne, przede wszystkim liczne w latach 20. XVII wieku epidemie, lecz także pożary, wichury i powodzie. Negatywne znaczenie miały też procesy ogólnoeuropejskie, skutkujące, w wyniku zmiany struktury cen, spadkiem dochodowości majątków magnackich. W przypadku Krzysztofa Radziwiłła zjawisko to zostało znacznie osłabione w wyniku przypadających na ostatnie lata jego życia nadań bogatych królewszczyzn, przede wszystkim ekonomii mohylewskiej, w efekcie w latach 30. XVII wieku osiągał on najwyższe dochody.
The text is the second part of the study on the construction works in the estate of one of the most important Lithuanian magnates of the first half of the 17th century, Krzysztof Radziwiłł (1585–1640), Vilnius Voivode and Grand Hetman of Lithuania. It presents the workers employed in the construction of the building, from the least qualified to architects and sculptors. Attention was also paid to the production or purchase of building materials, their transport and collection. Then, the process of building or renovating buildings, its course and duration were presented. In conclusion, the author tried to justify that the course of the investment process in Krzysztof Radziwiłł’s estate was influenced by his personal characteristics and the work system he adopted (strict control, monopoly of decision-making, even in minor matters by the prince, thrift). However, according to the author, the social and economic system prevailing in the Grand Duchy of Lithuania at that time was of decisive importance. A large share of natural economy and a narrow market of services and trade in construction goods caused constant problems with maintaining the continuity and efficiency of works. This resulted in repeated attempts to organize work as much as possible with the hands of the serfs’ (prince’s own subjects) and with the help of products manufactured on their own estates. The effect of these treatments was both the low quality of the materials and the work performed. Lesser, but important, were the negative natural phenomena, especially numerous epidemics in the 1720s, but also fires, storms and floods. Pan-European processes also had a negative impact, resulting in a decrease in the profitability of aristocratic estates as a result of a change in the price structure. In the case of Krzysztof Radziwiłł, this phenomenon was significantly weakened as a result of the endowments of rich royal estates, mainly the economy of Mogilev, in the last years of his life. As a result, in the 1730s he achieved the highest income.
Źródło:
TECHNE. Seria Nowa; 2022, 10; 11-68
2084-851X
Pojawia się w:
TECHNE. Seria Nowa
Dostawca treści:
Biblioteka Nauki
Artykuł

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies