Coordinated control strategy for microgrid stability maintenance under isolated island operation
Autorzy:
Wu, Pan
Xu, Xiaowei
Powiązania:
https://bibliotekanauki.pl/articles/1841281.pdf
Data publikacji:
2021
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
coordinated control
isolated island operation
microgrid
particle swarm optimization
Opis:
In this study, the inverter in a microgrid was adjusted by the particle swarm optimization (PSO) based coordinated control strategy to ensure the stability of the isolated island operation. The simulation results showed that the voltage at the inverter port reduced instantaneously, and the voltage unbalance degree of its port and the port of point of common coupling (PCC) exceeded the normal standard when the microgrid entered the isolated island mode. After using the coordinated control strategy, the voltage rapidly recovered, and the voltage unbalance degree rapidly reduced to the normal level. The coordinated control strategy is better than the normal control strategy.
Źródło:
Archives of Electrical Engineering; 2021, 70, 2; 285-295
1427-4221
2300-2506
Pojawia się w:
Archives of Electrical Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Island Operation of Renewable Energy Sources
Praca wyspowa odnawialnych źródeł energii
Autorzy:
Głowacki, F.
Koseda, H.
Powiązania:
https://bibliotekanauki.pl/articles/952955.pdf
Data publikacji:
2018
Wydawca:
ENERGA
Tematy:
island operation
micro installation
distributed generation
praca wyspowa
mikroinstalacja
generacja rozproszona
Opis:
Improvement in the efficiency of use of energy resources and the environment condition as a result of reduced atmosphere and water pollution is directly related to the intensive development of renewable energy sources. The growing share of renewable sources in the energy mix makes it possible to reorganize the power system operations, e.g. by creating local energy balancing areas (LOB). The paper presents selected results of model tests, aimed at determining the necessary conditions to enable a separated island area’s resynchronization with the power system.
Poprawa efektywności wykorzystania zasobów surowców energetycznych oraz stanu środowiska w wyniku redukcji zanieczyszczeń do atmosfery i wód jest bezpośrednio związana z intensywnym rozwojem odnawialnych źródeł energii. Coraz większy udział źródeł odnawialnych w bilansie energetycznym umożliwia przeorganizowanie sposobu funkcjonowania systemu elektroenergetycznego, np. poprzez tworzenie lokalnych obszarów bilansowania (LOB) samowystarczalnych energetycznie. W artykule zamieszczono wybrane wyniki badań modelowych, mających na celu wyznaczenie warunków niezbędnych do spełnienia, aby umożliwić resynchronizację wydzielonego obszaru wyspowego z systemem energetycznym.
Źródło:
Acta Energetica; 2018, 4; 53-60
2300-3022
Pojawia się w:
Acta Energetica
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Warunki pracy autonomicznych elektrowni wiatrowych
Autonomous working conditions for wind power plants
Autorzy:
Białas, Hubert
Pawełek, Ryszard
Wasiak, Irena
Powiązania:
https://bibliotekanauki.pl/articles/268427.pdf
Data publikacji:
2019
Wydawca:
Politechnika Gdańska. Wydział Elektrotechniki i Automatyki
Tematy:
turbozespół wiatrowy
zasobnik energii
praca wyspowa
wind turbine
energy storage
island operation
Opis:
W artykule dokonano analizy możliwości pracy wyspowej turbozespołów wiatrowych w różnych układach sieciowych. Do realizacji badań wykorzystano model sieci składający się z turbozespołu wiatrowego, obciążenia oraz elektrochemicznego zasobnika energii. Rozważono dwa przypadki pracy sieci wyspowej: bez zasobnika i zasobnikiem energii. W pierwszym przypadku turbozespół wiatrowy jest źródłem napięciowym zasilającym lokalne odbiory. W drugim przypadku funkcję źródła napięciowego pełni zasobnik energii natomiast turbozespół wiatrowy jest źródłem prądowym wytwarzającym moc czynną zależną od warunków atmosferycznych (prędkości wiatru). Zaimplementowane algorytmy sterowania pracą turbozespołu i zasobnika pozwalają na stabilizację napięcia zasilającego odbiory. Wyniki badań symulacyjnych przedstawiono w postaci wykresów ilustrujących bilanse mocy czynnej i biernej w układzie, zmiany napięcia zasilającego oraz zmiany wielkości elektromechanicznych charakteryzujących pracę turbozespołu.
The European Commission Regulation No. 2016/631, that is currently introduced by Polish network operators, divides all connected sources into four types, depending on rated power. For sources of type C and D with rated power greater than 50 and 75 MW respectively in the regulation defines island work requirements. However, it should be expected that these requirements will be extended to B sources with rater power from 1 MW in the future. Wind farms with high rated power (classifies as types C or D), most often connected to a 110 kV network, contain many generating units (wind generators) with rated power of about several megawatts, which are treated separately as type B sources. Smaller Wind Farms, consisting several wind generators are connected to the medium voltage network (MV). The paper considered the possibility of autonomous operation of a single MV wind turbine supplying local customers. Two variants of separate power network operation were taken into account. In the first variant, power balancing is carried out in the system: wind turbine – variable load. In the second variant, power balancing element is the energy storage. The article present the tested power network model developed in the PSCAD program environment and the results of simulation tests performed at random changes in wind speed and load for both analyzed network.
Źródło:
Zeszyty Naukowe Wydziału Elektrotechniki i Automatyki Politechniki Gdańskiej; 2019, 67; 29-32
1425-5766
2353-1290
Pojawia się w:
Zeszyty Naukowe Wydziału Elektrotechniki i Automatyki Politechniki Gdańskiej
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The performance of passive methods of detecting island operation implemented in PV inverters during selected disturbances in distribution power grids
Autorzy:
Parol, M.
Połecki, M.
Powiązania:
https://bibliotekanauki.pl/articles/201420.pdf
Data publikacji:
2020
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
distribution power grids
distributed generation
island operation detecting
passive methods
PV inverters
functional reliability
Opis:
Distributed generation is an issue intensively studied in recent years. It concerns, among others protection systems of distributed generation units connected to electric power grids. The main goal of this paper is to present the issue of functional reliability of selected passive loss of mains (LoM) protection systems, i.e. methods of detecting island operation in distribution power grids, which are implemented in PV inverters installed in sample MV and LV grids, typical for Polish conditions. First, different methods of detecting island operation have been distinguished and shortly characterized. Some problems concerning their action have also been presented. Then commonly used passive methods of island grid operation detection have been described. Next sample distribution grid has been presented and chosen disturbances modelled in the grid to test mentioned passive methods have been defined. For each of the determined type of disturbance the dynamic simulation has been carried out, as well as voltage and frequency plots for two selected RES nodes have been recorded and observed. All considered passive methods of island grid operation detection have been implemented in a Matlab/Simulink environment. Models of RoCoF, U/OVP and U/ OFP algorithms have been presented in diagrams. Then, results of carried out extensive studies have been shown in tables and discussed. The results are a consequence of a realized research project concerning electric grids in rural areas. Summary, final conclusions, and future research possibilities constitute the last part of the paper. The conclusions are mainly concentrated on evaluation of action of passive methods of island operation detection as well as possibility of using the methods in Polish conditions, particularly in rural distribution grids.
Źródło:
Bulletin of the Polish Academy of Sciences. Technical Sciences; 2020, 68, 5; 1087-1098
0239-7528
Pojawia się w:
Bulletin of the Polish Academy of Sciences. Technical Sciences
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Możliwość lokalnej odbudowy zasilania w oparciu o zasobniki energii i rozproszone źródła OZE
Possibility of local system restoration based on energy storage and distributed renewable energy sources
Autorzy:
Bronk, Leszek
Matusewicz, Mirosław
Powiązania:
https://bibliotekanauki.pl/articles/268829.pdf
Data publikacji:
2019
Wydawca:
Politechnika Gdańska. Wydział Elektrotechniki i Automatyki
Tematy:
magazyn energii
lokalny obszar bilansowania
OZE
praca wyspowa
energy storage
renewable sources
wind generation
local balancing area
island operation
Opis:
W artykule przedstawiono wyniki testów odbudowy zasilania obszaru sieci dystrybucyjnej z wykorzystaniem magazynu energii (ME) i rozproszonych źródeł odnawialnych. Próba pracy wyspowej z odnawialnymi źródłami energii (OZE) została wykonana na ograniczonym obszarze sieci elektroenergetycznej (SEE). Na testowany obszar składają się cztery podobszary, które można załączyć/odłączyć za pomocą zdalnie sterowanych rozłączników. Celem próby było zdalne wydzielenie i zasilanie obszaru z wykorzystaniem ME, a następnie farmy wiatrowej (FW). Artykuł oparto na wynikach projektu „Budowa lokalnego obszaru bilansowania (LOB) jako elementu zwiększenia bezpieczeństwa i efektywności energetycznej pracy systemu dystrybucyjnego”, realizowanego przy współudziale Energa Operator SA, Uniwersytetu Zielonogórskiego i Instytutu Energetyki Oddział Gdańsk.
The implementation of the "winter package" will contribute to changes in the rules for contracting ancillary services. After 2020, part of the responsibility for the functioning of the power system will be transferred to the level of DSO, for example: regulation of voltage, Fast Reactive Current Injection (FRCI) or services in artificial inertia and system restoration. The article presents the results of tests of power supply system restoration based on energy storage (ES) and distributed renewable sources (wind farms). The attempt of island operation with RES (renewable energy sources) was carried out in a limited area of the power grid. The tested area contained four sub-areas that can be switched on / off using remotely controlled load break switch. The purpose of the test was to remotely isolate the area and feed it using the Energy Storage and then the wind farm (WF). The paper is based on the results of the project The Building of a Local Balancing Area (LBA) as an Element of Increasing Safety and Energy Efficiency of the Distribution System Operation implemented with the participation of Energa Operator SA, the University of Zielona Gora and the Institute of Power Engineering Gdansk Division.
Źródło:
Zeszyty Naukowe Wydziału Elektrotechniki i Automatyki Politechniki Gdańskiej; 2019, 62; 81-84
1425-5766
2353-1290
Pojawia się w:
Zeszyty Naukowe Wydziału Elektrotechniki i Automatyki Politechniki Gdańskiej
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Analiza poprawności działania zabezpieczeń od skutków zwarć wielkoprądowych w warunkach pracy wyspowej fragmentu sieci elektroenergetycznej zakładu górniczego
Analysis of power system protection against hight-current fault operation in working island of the power grid mining plant
Autorzy:
Rzepka, Piotr
Szablicki, Mateusz
Jurczyk, Dawid
Halinka, Adrian
Powiązania:
https://bibliotekanauki.pl/articles/267560.pdf
Data publikacji:
2019
Wydawca:
Politechnika Gdańska. Wydział Elektrotechniki i Automatyki
Tematy:
praca wyspowa
elektroenergetyczna automatyka zabezpieczeniowa
poziom prądu zwarciowego
zakład górniczy
island operation
electric power system
power system protection
mining plant
Opis:
W artykule przedstawiono wyniki badań analitycznych weryfikujących poprawność działania zabezpieczeń od skutków zwarć wielkoprądowych we fragmencie sieci elektroenergetycznej zakładu górniczego pracującym jako wyspa sieciowa. Warunki prądowe towarzyszące zwarciom wielkoprądowym w układach pracy wyspowej silnie zależą od zdolności lokalnej jednostki wytwórczej energii elektrycznej do generacji prądu zwarciowego. Zwykle w przypadku przejścia fragmentu sieci do pracy wyspowej występuje znaczne zmniejszenie poziomu mocy zwarciowej, co w efekcie doprowadzi do ograniczenia poziomu prądów zwarć wielkoprądowch.
The safe operation of a mining plant requires continuous supply of the most important loads. In catastrophic situations, power supply from the power system side may be interrupted, eg. due to break of overhead power lines supplying the plant. Therefore, the supply of selected critical devices of a mining plant from a local generating unit (operating within this plant) can significantly improve the safety of the mining plant operations. However, the implementation of this task requires separating a fragment of the mining plant network and its transition to island operation. The implementation of such a state requires, among others, carrying out verification of the correct operation of electrical power protection systems. The paper presents analysis of power system protection against hight–current fault operation of the power grid mine working island. Current conditions accompanying high-currents faults in island systems are strongly dependent on the ability of the local electricity generation unit to generate short-circuit current. Usually in case of electricity power network transition to island operation, there is a significant reduction in the level of high–current fault, what may cause a bad operation of power system protection.
Źródło:
Zeszyty Naukowe Wydziału Elektrotechniki i Automatyki Politechniki Gdańskiej; 2019, 62; 135-138
1425-5766
2353-1290
Pojawia się w:
Zeszyty Naukowe Wydziału Elektrotechniki i Automatyki Politechniki Gdańskiej
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Evaluation of The Operation and Improvement of the Stability of the Factory Power Network, Taking into Account the Uncertainty of the Network Model Parameters
Ocena pracy i poprawa stabilności zakładowej sieci elektroenergetycznej z uwzględnieniem niepewności parametrów modelu sieci
Autorzy:
Nocoń, A.
Paszek, S.
Walczak, J.
Powiązania:
https://bibliotekanauki.pl/articles/396948.pdf
Data publikacji:
2017
Wydawca:
ENERGA
Tematy:
factory power network
island mode network operation
transient states
uncertainty of model parameters
improvement of angular stability
zakładowa sieć energetyczna
praca autonomiczna
stany przejściowe
niepewność parametrów modelu
poprawa stabilności kątowej
Opis:
There was analysed the operation of a factory power network working in island mode and cooperating with the Polish National Power System (PNPS) in selected transient states. It was assumed that two generating units: one with an asynchronous generator, and the second with a synchronous generator, were installed in the network. The behaviour of the generating units was analysed in the following transients: transition of the factory network from cooperation with the PNPS to island mode operation and shutdown of the asynchronous unit. The analysis took into account the uncertainty of the parameters of selected models of network elements. In the paper, there is described the problem of modelling the scatter of parameters of the models of electrical systems. It consists in determining the envelopes (limit bands) for a family of waveforms of the analysed signals. These envelopes were determined using multiple simulations when changing the network model parameters in an appropriate manner. There is shown the possibility of improving the angular stability of the analysed network by the use of stabilising systems with an appropriate structure and optimised parameters. It is proposed to introduce these stabilising systems to the turbine governor and the synchronous generator excitation system. Parameters of the stabilising systems were optimised by minimising the defined quality factor of electromechanical control waveforms in the selected transient state. A genetic algorithm was used to minimise this quality factor.
Przeanalizowano pracę w wybranych stanach nieustalonych zakładowej sieci elektroenergetycznej pracującej autonomicznie i we współpracy z Krajowym Systemem Elektroenergetycznym (KSE). Założono, że w sieci zainstalowane są dwa zespoły wytwórcze: jeden z generatorem asynchronicznym, a drugi z generatorem synchronicznym. Badano zachowanie się zespołów wytwórczych m.in. w następujących stanach nieustalonych: przejście sieci zakładowej od współpracy z KSE do pracy autonomicznej oraz wyłączenie zespołu asynchronicznego. W analizie uwzględniono niepewność parametrów wybranych modeli elementów sieci. Opisano zagadnienie modelowania rozrzutu parametrów modeli układów elektrycznych. Polega ono na wyznaczeniu obwiedni (pasm granicznych) rodziny przebiegów czasowych analizowanych sygnałów. Obwiednie te wyznaczano przez wielokrotne symulacje przy zmienianych w odpowiedni sposób parametrach modelu sieci. Pokazano możliwości poprawy stabilności kątowej analizowanej sieci przy zastosowaniu układów stabilizujących o odpowiedniej strukturze i optymalizowanych parametrach. Zaproponowano wprowadzenie tych układów stabilizujących do układu regulacji mocy turbiny oraz do układu wzbudzenia generatora synchronicznego. Optymalizację parametrów układów stabilizujących przeprowadzono poprzez minimalizację zdefiniowanego wskaźnika jakości elektromechanicznych przebiegów regulacyjnych w wybranym stanie nieustalonym. Do minimalizacji tego wskaźnika jakości zastosowano algorytm genetyczny.
Źródło:
Acta Energetica; 2017, 1; 76-82
2300-3022
Pojawia się w:
Acta Energetica
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Parallel operation of a steam turbo-generator set and hydroelectric sets in an island system formed for the National Power System recovery after catastrophic failure
Praca równoległa turbozespołu parowego i hydrozespołów w układzie wyspowym tworzonym w warunkach odbudowy Krajowego Systemu Elektroenergetycznego po awarii katastrofalnej
Autorzy:
Grządzielski, I. A.
Sroka, K.
Kurzyński, A.
Kaczmarek, M.
Radsak, D.
Powiązania:
https://bibliotekanauki.pl/articles/397172.pdf
Data publikacji:
2017
Wydawca:
ENERGA
Tematy:
catastrophic failure
power system recovery
island formation
parallel operation
awaria katastrofalna
odbudowa systemu elektroenergetycznego
tworzenie układu wyspowego
praca równoległa
Opis:
The basic scenario of the power system recovery after catastrophic failure is to start the thermal power units that have been shut-down in an emergency by supplying voltage and starting power from self-starting hydroelectric power plants. The consequence of implementing such a plan is the formation of a local island system powered by the hydro plant units in parallel with a turboset of the started thermal power plant. The paper presents the results of measurements recorded in a system test of starting a 264 MW unit at the Turów Power Plant with input from Dychów hydro electric Plant. In particular, the ability to synchronize the unit started at Turów with the hydro sets at Dychów loaded with auxiliaries and pumps was assessed.
Podczas odbudowy systemu elektroenergetycznego, po wystąpieniu awarii katastrofalnej podstawowym scenariuszem jest uruchomienie bloków elektrowni cieplnych, które zostały odstawione awaryjnie, przez podanie napięcia i mocy rozruchowej z samostartujących elektrowni wodnych. Konsekwencją realizacji takiego planu jest tworzenie lokalnego układu wyspowego, w którym źródłem mocy elektrycznej będą równolegle pracujące hydrozespoły elektrowni wodnej i turbozespół uruchomionej elektrowni cieplnej. W referacie przedstawione zostaną wyniki pomiarów zarejestrowane w trakcie próby systemowej uruchomienia bloku energetycznego o mocy 264 MW w Elektrowni Turów z Elektrowni Wodnej Dychów. W szczególności ocenie poddane zostaną możliwości synchronizacji uruchomionego bloku w Elektrowni Turów z hydrogeneratorami EW Dychów, obciążonymi potrzebami własnymi jednostek wytwórczych i pompami w EW Dychów.
Źródło:
Acta Energetica; 2017, 3; 69-76
2300-3022
Pojawia się w:
Acta Energetica
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-8 z 8

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies