Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Wyszukujesz frazę "eksploatacja ciągła" wg kryterium: Temat


Wyświetlanie 1-1 z 1
Tytuł:
One-Day Prognoses of Methane Concentrations for the 102 Longwall in the 325/1 Seam in the “W” Coal Mine Operating in a Continuous System
Autorzy:
Grodzicka, Aneta
Badura, Henryk
Shaidurova, Natalia
Sentyakov, Kirill
Sviatskii, Vladislav
Powiązania:
https://bibliotekanauki.pl/articles/2064336.pdf
Data publikacji:
2020
Wydawca:
STE GROUP
Tematy:
continuous exploitation
methane content
mean methane concentration
methane concentration prognosis
eksploatacja ciągła
średnie stężenie metanu
prognozy stężenia metanu
Opis:
The first part of the paper concerns the natural deposition conditions of the 325/1 seam in the “W” coal mine, in the 102 longwall mining panel. It also presents the most important technical conditions regarding the exploitation at this longwall. To characterize the methane hazard in the longwall area, the parameters of ventilation and total methane concentrations as well as the volumetric flowrate of methane captured by the methane removal system, have been presented graphically. A significant part of the methane flow in the longwall area was released to the air flowing to the longwall. The most significant part of the article is the presentation and analysis of the results of prognoses of mean methane concentrations at the exhaust of the longwall area. The accuracy of the prognoses of methane concentration was verified using two methods: while not considering the release of methane to the air flowing to the longwall and while considering the total flowrate of methane to the ventilation air in the area of the 102 longwall. The method of forecast presented in the article has so far been checked for a 5-day and 6-day work day, as well as for walls operating in a non-regular mode. The article refers to the wall operating in a continuous mode, which required adaptation of the proposed method to this mode. The application of the one-day forecast proposed in the article allows for undertaking temporary methane prevention measures enabling safe use of the wall.
Źródło:
New Trends in Production Engineering; 2020, 3, 1; 169--185
2545-2843
Pojawia się w:
New Trends in Production Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-1 z 1

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies