Tytuł:
Predicting buildings construction cost overruns on the basis of cost overruns structure
Autorzy:
Car-Pušić, Diana
Tijanić, Ksenija
Marović, Ivan
Mlađen, Marko
Powiązania:
https://bibliotekanauki.pl/articles/118675.pdf
Data publikacji:
2020
Wydawca:
Szkoła Główna Gospodarstwa Wiejskiego w Warszawie. Wydawnictwo Szkoły Głównej Gospodarstwa Wiejskiego w Warszawie
Tematy:
cost overrun
quantities of works
unforeseen works
additional works
linear regression analysis
soft computing methods
Opis:
In construction practice, contractually agreed costs are often exceeded, which interferes with the sustainable realization of construction projects. The research described in this paper covers 24 new construction, renovation and reconstruction projects in the Republic of Croatia realized in the years 2006 to 2017, in order to analyse the occurrence of cost overruns more precisely with regard to the source of the overruns. It was found that additional work is the main source of cost overruns: firstly, additional work as a result of the client’s change orders and then unforeseen construction work as a result of unforeseen circumstances. As for the additional works, they are carried out at the client’s request and are not necessary for the safety and stability of the building. Using linear regression and “soft computing” methods, the possibility of modelling the relationship between contractually agreed and realized construction costs with satisfactory accuracy was tested. The model with the values of the natural logarithms of the variables, modelled according to the time–cost model of Bromilow, proved to be of the highest accuracy.
Źródło:
Scientific Review Engineering and Environmental Sciences; 2020, 29, 3; 366-376
1732-9353
Pojawia się w:
Scientific Review Engineering and Environmental Sciences
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Effective control measures to minimize cost overrun during construction phase of high-rise residential building projects in Chongqing, China
Autorzy:
Wang, Yue
Ghazali, Farid Ezanee Mohamed
Powiązania:
https://bibliotekanauki.pl/articles/27312165.pdf
Data publikacji:
2023
Wydawca:
Polska Akademia Nauk. Czasopisma i Monografie PAN
Tematy:
budynek wysoki
budynek mieszkalny
projekt budowlany
faza budowy
proces hierarchii analitycznej
analiza krytyczna
przekroczenie kosztów
czynnik ryzyka
pomiar kontrolny
high-rise building
residential building
building project
construction phase
analytic hierarchy process
critical analysis
cost overrun
risk factor
control measure
Opis:
Cost overrun during construction is one of the most common problems occur in construction projects around the world, which also includes the area of Chongqing in China. At present, there are few studies related to cost overruns at the construction stage of high-rise residential building projects (HRBPs) in Chongqing. The purpose of this study is to develop effective control measures from the contractor’s perspective to help projects to minimize cost overruns during the construction phase of HRBPs in Chongqing. Firstly, through the literature review and semi-structured interviews, 65 cost overrun-related risk factors in construction projects were identified. All the risk factors have been prioritized through the analytic hierarchy process (AHP) based on their importance to project success. Out of the 65 factors identified, 12 were classified as the critical ones that have a great potential to instigate a cost overrun during construction to take place in the real project. There were four risk factors that have the greatest impact on cost overruns, and their weights were 0.04 or above, including low bid, force majeure, undetailed/inaccurate geological survey data, and increased loan interest rates. Finally, control measures were developed for these four critical cost overrun risk factors (CCORFs). The measures developed provided a guideline to control the risk of cost overruns and clear control key points to help contractors minimize cost overruns on construction projects.
Źródło:
Archives of Civil Engineering; 2023, 69, 3; 79--94
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-2 z 2

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies