Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Wyszukujesz frazę "Kutnik, Andrzej" wg kryterium: Autor


Wyświetlanie 1-1 z 1
Tytuł:
Operational Tests of a Modular Installation and Transport Assembly of Steel Arch Support in Underground Excavations
Autorzy:
Krauze, Krzysztof
Mucha, Kamil
Wydro, Tomasz
Kutnik, Andrzej
Hałas, Waldemar
Ruda, Piotr
Osowski, Dawid
Powiązania:
https://bibliotekanauki.pl/articles/2064564.pdf
Data publikacji:
2021
Wydawca:
STE GROUP
Tematy:
underground mining
steel arch support
modular installation and transport assembly
safety
Opis:
The roof support, especially the ŁP yielding steel arch support, is transported and assembled in the face with the use of auxiliary machines. This activity in Polish underground mines causes numerous problems, which until present have not been solved. Currently, transport and assembly are carried out manually, while the roadheader and suspended rail are used only to a small extent. Therefore, the modular installation and transport assembly was developed jointly by FAMA Sp. z o. o. and AGH University of Science and Technology. The solution in question enables performing a number of functions (including transport and assembly of all kinds of support arches), which are not available in currently manufactured equipment. The proposed manipulator solves numerous problems occurring during the installation of the steel arch support in an underground mining excavation and significantly improves the process of drilling galleries. This innovative solution considerably differs from the existing ones, and its greatest advantage is versatility with regard to the cross-section and equipment of the roadway, as well as a wide range of functions. In addition, it can also be used for reloading works. The modular installation and transport assembly together with a platform, a temporary mechanized roof support and a mining machine, make up a mechanizes roadheader complex, which enables continuous mining, loading and installing the permanent support in underground workings.
Źródło:
Multidisciplinary Aspects of Production Engineering; 2021, 4, 1; 343--354
2545-2827
Pojawia się w:
Multidisciplinary Aspects of Production Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-1 z 1

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies