Tytuł:
Statystyka uszkodzeń w elektrowniach zawodowych
Statistics of failures in electric power station
Autorzy:
Szymaniec, S.
Powiązania:
https://bibliotekanauki.pl/articles/1201825.pdf
Data publikacji:
2016
Wydawca:
Sieć Badawcza Łukasiewicz - Instytut Napędów i Maszyn Elektrycznych Komel
Tematy:
eksploatacja
zespół maszynowy
stan techniczny
diagnostyka
monitorowanie
niezawodność
bloki energetyczne
wskaźniki niezawodności
exploitation
machine units
technical condition
diagnostic
monitoring
reliability
power units
reliability indices
Opis:
The reliability of large power units has always had and continues to have a significant meaning to the operation of the Polish Power System. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. First, numbers and the duration of specific states are calculated: (Tp, Tr, Tkp, Ts, Tb, Ta, Tk, Lr, Lkp, Ls, Lb, La, Lw) where: Tp – run (service) time of the power unit or a group of power units within the analysed period of time, Tr – outage on stand-by time of the power unit or a group of power units within the analysed period of time, Tkp – outage during a general overhaul time of the power unit or a group of power units, Ts – outage during a medium-scale overhaul time of the power unit or a group of power units, Tb – outage during routine maintenance time of the power unit or a group of Power units, Ta – outage during emergency repairs time of the power unit or a group of power units, Tk – time to which the calculations apply (this value is calculated by the system but is only used to calculate indices and is not printed anywhere), Lr – number of outages on stand-by, Lkp – number of outages during a general overhaul, Ls – number of outages during a medium-scale overhaul, Lb – number of outages during routine maintenance, La – number of outages during emergency repairs, and Lw – number of all outages. Based on the above-mentioned values, the following indices are calculated: availability index AF, share of the outage time in the calendar time FOF, failure index FOR, utilisation index of the capacity installed GCF, utilisation index of the achievable capacity GOF, index of scheduled overhauls SOF, utilisation factor of the calendar time SF, average run time ART.
Niezawodność dużych bloków energetycznych zawsze miała i nadal ma duże znaczenie dla pracy Krajowego Systemu Elektroenergetycznego. W artykule przedstawiono definicje podstawowych wskaźników niezawodności bloków energetycznych, stosowanych w Polsce i na świecie. W pierwszej kolejności są obliczane liczby i czasy trwania wyróżnionych stanów: (Tp, Tr, Tkp, Ts, Tb, Ta, Tk, Lr, Lkp, Ls, Lb, La, Lw) gdzie: Tp – czas pracy bloku lub grupy bloków w rozpatrywanym okresie, Tr – czas postojów bloku lub grupy bloków w rezerwie w rozpatrywanym okresie, Tkp – czas postojów bloku lub grupy bloków w remoncie kapitalnym, Ts – czas postojów bloku lub grupy bloków w remoncie średnim, Tb – czas postojów bloku lub grupy bloków w remoncie bieżącym, Ta – czas postojów bloku lub grupy bloków w remoncie awaryjnym, Tk – czas okresu, za który wykonywane są obliczenia (wartość ta jest w systemie obliczana, ale służy tylko do obliczenia wskaźników, nie jest więc nigdzie drukowana), Lr – liczba postojów w rezerwie, Lkp – liczba postojów w remoncie kapitalnym, Ls – liczba postojów w remoncie średnim, Lb – liczba postojów w remoncie bieżącym, La – liczba postojów w remoncie awaryjnym, Lw – liczba wszystkich postojów. Na podstawie wyżej wymienionych wielkości są obliczane następujące wskaźniki: wskaźnik dyspozycyjności AF, udział czasu awarii w czasie kalendarzowym FOF, wskaźnik awaryjności FOR, wskaźnik wykorzystania mocy zainstalowanej GCF, wskaźnik użytkowania mocy osiągalnej GOF, wskaźnik remontów planowych SOF, wskaźnik wykorzystania czasu kalendarzowego SF, średni czas ruchu ART.
Źródło:
Maszyny Elektryczne: zeszyty problemowe; 2016, 1, 109; 185-190
0239-3646
2084-5618
Pojawia się w:
Maszyny Elektryczne: zeszyty problemowe
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Statystyka uszkodzeń w elektrowniach zawodowych
Autorzy:
Szymaniec, S.
Powiązania:
https://bibliotekanauki.pl/articles/304028.pdf
Data publikacji:
2017
Wydawca:
Wydawnictwo Druk-Art
Tematy:
eksploatacja
zespół maszynowy
stan techniczny
diagnostyka
monitorowanie
niezawodność
bloki energetyczne
wskaźniki niezawodności
exploitation
machine units
technical condition
diagnostic
monitoring
reliability
power units
reliability indices
Opis:
Niezawodność dużych bloków energetycznych zawsze miała i nadal ma duże znaczenie dla pracy Krajowego Systemu Elektroenergetycznego. W artykule przedstawiono definicje podstawowych wskaźników niezawodności bloków energetycznych, stosowanych w Polsce i na świecie. W pierwszej kolejności są obliczane liczby i czasy trwania wyróżnionych stanów: (Tp, Tr, Tkp, Ts, Tb, Ta, Tk, Lr, Lkp, Ls, Lb, La, Lw) gdzie: Tp – czas pracy bloku lub grupy bloków w rozpatrywanym okresie; Tr – czas postojów bloku lub grupy bloków w rezerwie w rozpatrywanym okresie; Tkp – czas postojów bloku lub grupy bloków w remoncie kapitalnym; Ts – czas postojów bloku lub grupy bloków w remoncie średnim; Tb – czas postojów bloku lub grupy bloków w remoncie bieżącym; Ta – czas postojów bloku lub grupy bloków w remoncie awaryjnym; Tk – czas okresu, za który wykonywane są obliczenia (wartość ta jest w systemie obliczana, ale służy tylko do obliczenia wskaźników, nie jest więc nigdzie drukowana); Lr – liczba postojów w rezerwie; Lkp – liczba postojów w remoncie kapitalnym; Ls – liczba postojów w remoncie średnim; Lb – liczba postojów w remoncie bieżącym; La – liczba postojów w remoncie awaryjnym; Lw – liczba wszystkich postojów. Na podstawie wyżej wymienionych wielkości są obliczane następujące wskaźniki: wskaźnik dyspozycyjności AF, udział czasu awarii w czasie kalendarzowym FOF, wskaźnik awaryjności FOR, wskaźnik wykorzystania mocy zainstalowanej GCF, wskaźnik użytkowania mocy osiągalnej GOF, wskaźnik remontów planowych SOF, wskaźnik wykorzystania czasu kalendarzowego SF, średni czas ruchu ART.
The reliability of large power units has always had and continues to have a significant meaning to the operation of the Polish Power System. This paper presents definitions of the basic indices of power unit reliability used in Poland and in the world. First, numbers and the duration of specific states are calculated: (Tp, Tr, Tkp, Ts, Tb, Ta, Tk, Lr, Lkp, Ls, Lb, La, Lw) where: Tp – run (service) time of the power unit or a group of power units within the analysed period of time; Tr – outage on stand-by time of the power unit or a group of power units within the analysed period of time; Tkp – outage during a general overhaul time of the power unit or a group of power units; Ts – outage during a medium-scale overhaul time of the power unit or a group of power units; Tb – outage during routine maintenance time of the power unit or a group of power units; Ta – outage during emergency repairs time of the power unit or a group of power units; Tk – time to which the calculations apply (this value is calculated by the system but is only used to calculate indices and is not printed anywhere); Lr – number of outages on stand-by; Lkp – number of outages during a general overhaul; Ls – number of outages during a medium-scale overhaul; Lb – number of outages during routine maintenance; La – number of outages during emergency repairs, and Lw – number of all outages. Based on the above-mentioned values, the following indices are calculated: availability index AF, share of the outage time in the calendar time FOF, failure index FOR, utilisation index of the capacity installed GCF, utilisation index of the achievable capacity GOF, index of scheduled overhauls SOF, utilisation factor of the calendar time SF, average run time ART.
Źródło:
Napędy i Sterowanie; 2017, 19, 4; 100-105
1507-7764
Pojawia się w:
Napędy i Sterowanie
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Pozyskanie innowacyjnych metod modernizacji bloków energetycznych przy wykorzystaniu modelu zamówień przedkomercyjnych : Program „Bloki 200+” realizowany przez Narodowe Centrum Badań i Rozwoju
The acquisition of innovative methods of modernization for power units using prec-commercial procurement : the “Bloki 200+” program implemented by the National Center for Research and Development
Autorzy:
Matan, K.
Ziółkowska, K.
Powiązania:
https://bibliotekanauki.pl/articles/394131.pdf
Data publikacji:
2018
Wydawca:
Polska Akademia Nauk. Instytut Gospodarki Surowcami Mineralnymi i Energią PAN
Tematy:
bloki
energetyka
emisje
B+R
zamówienia przedkomercyjne
innowacje
Narodowe Centrum Badań i Rozwoju
power units
energy
emission
R+D
pre-commercial procurement
innovations
National Centre for Research and Development
Opis:
W polskich elektrowniach pracuje ponad 50 bloków klasy 200 MW, głównie ponad czterdziestoletnich, których eksploatacja staje się coraz bardziej kosztowna z powodów funkcjonalnych i środowiskowych. Jednostki te albo przeszły już kosztowną modernizację, dostosowującą je do wymagań obowiązującej od 2016 r. dyrektywy IED (o emisjach przemysłowych), albo uzyskały w tym zakresie derogacje. Jednak najpóźniej od 2021 r. będą musiały spełniać one jeszcze bardziej restrykcyjne normy, tzw. konkluzje BAT dotyczące emisji zanieczyszczeń. Wymagają więc kolejnej modernizacji. Problematyczna jest także znaczna ilość dwutlenku węgla, który emitują. Narodowe Centrum Badań i Rozwoju, dostrzegając ten problem, podjęło decyzję o wdrożeniu programu „Bloki 200+. Innowacyjna technologia zmiany reżimu pracy bloków energetycznych klasy 200 MWe z uwzględnieniem trybu zamówienia przedkomercyjnego”. NCBR, przy czynnym zaangażowaniu uczestników sektora, planuje pozyskać niskonakładową metodę modernizacji bloków energetycznych. Ma ona nie tylko przedłużyć ich żywotność, ale także umożliwić eksploatację przy częstszych zmianach obciążenia, wymuszonych coraz większym udziałem OZE w Krajowym Systemie Elektroenergetycznym. Program ma na celu także wdrożenie w wymiarze krajowym rozwiązań zaczerpniętych z modelowego trybu finansowania badań amerykańskiej agencji DARPA. Planowane jest również przetestowanie nowatorskiego trybu zamówień przedkomercyjnych w dziedzinie nowych technologii. Artykuł wyjaśnia przede wszystkim, na czym polega nowe podejście NCBR do finansowania badań rozwojowych w dziedzinie elektroenergetyki (idea „państwo jako inteligentny zamawiający”). Analiza przedstawionego modelu programu odpowiada także na pytanie, czy pozyskanie innowacyjnej metody modernizacji bloków energetycznych ma szansę przyczynić się w znacznym stopniu do zapewnienia bezpieczeństwa energetycznego w Polsce w perspektywie krótko- i średnioterminowej.
At present, Polish power plants operate over fifty 200 MW power units, most of which are more than 40 years old. Their operation is becoming more and more expensive for functional and environmental reasons. These units have either already undergone a costly modernization, adapting them to the requirements of the so-called, Industrial Emissions Directive (in force since 2016), or have obtained derogations in this respect. Nevertheless, starting from 2021, they will have to meet even stricter standards (so-called BAT conclusions) regarding the emissions of chemical pollution. Therefore, they may require another modernization. The amount of carbon dioxide that they emit is also problematic. The National Center for Research and Development, in recognizing this problem, decided to implement the: „Bloki (Power units) 200+ program. Innovative technology of changing the operating regime of 200 MW power units using pre-commercial procurement.” The NCRD, with the active involvement of energy sector participants, plans to obtain a low-cost method of power units’ modernization. The objective is not only to extend their lifetime, but also to enable operation with more frequent load changes, forced by the increasing share of renewable energy in the National Power System. The program also aims to implement standards of financing research developed by the US agency - DARPA in Poland. The Program should also test the innovative mode of pre-commercial procurement in the field of new technologies. The article explains the new approach of the NCRD to financing development research in the field of power engineering (the idea of „the state as an intelligent client”). The analysis of the presented model of the program also responds to the question whether acquiring an innovative modernization method for power units has a chance to contribute to energy security in Poland in the short and medium term.
Źródło:
Zeszyty Naukowe Instytutu Gospodarki Surowcami Mineralnymi i Energią PAN; 2018, 102; 261-275
2080-0819
Pojawia się w:
Zeszyty Naukowe Instytutu Gospodarki Surowcami Mineralnymi i Energią PAN
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-3 z 3

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies