Wyszukujesz frazę "construction risk" wg kryterium: Wszystkie pola


Wyświetlanie 1-12 z 12
Tytuł:
Quantitative identification of construction risk
Kwantytatywna identyfikacja ryzyka budowy
Autorzy:
Kasprowicz, T.
Powiązania:
https://bibliotekanauki.pl/articles/230527.pdf
Data publikacji:
2017
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
konstrukcja
budowa
model
identyfikacja ryzyka
ryzyko budowy
analiza ryzyka
analiza ilościowa
structure
construction
risk identification
construction risk
risk analysis
quantitative analysis
Opis:
Risks pertaining to construction work relate to situations in which various events may randomly change the duration and cost of the project or worsen its quality. Because of possible significant changes of random events, favorable, moderate, and difficult conditions of construction work are considered. It is the first stage of the construction risk analysis. The probabilistic parameters of construction are identified and described by using the design characteristics model of the structure and the construction technology model. The first describes the probabilistic properties of the structure execution's technology. The second describes the probabilistic properties of the works execution. Both models contain basic probabilistic data for scheduling, cost estimating, and risk assessment of the construction.
Kwantytatywna metoda identyfikacji ryzyka budowy, którą opisano w artykule, pozwala identyfikować probabilistyczne parametry i charakterystyki ryzyka robót budowlanych na placu budowy. Identyfikowany jest wpływ losowych czynników zakłócających przebieg i wyniki robót. Identyfikowane dane dotyczą ryzyka budowy i stanowią podstawę oceny ryzyka opóźnienia ostatecznego terminu i ryzyka wzrostu całkowitych kosztów zakończenia budowy. Zakłada się, że budowa może być realizowana tylko wtedy, gdy zakłócenia losowe nie uniemożliwiają realizacji budowy zgodnie z dokumentacją projektową i specyfikacją techniczną wykonania i odbioru robót. W tym sensie zakłócające czynniki losowe mogą jedynie opóźniać ostateczny termin i zwiększać całkowite koszty zakończenia budowy. W silnie niestabilnej sytuacji realizacyjnej powinny być identyfikowane pomyślne, przeciętne i niekorzystne warunki budowy.
Źródło:
Archives of Civil Engineering; 2017, 63, 1; 63-75
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Comparison of selected methods of assessment of effectiveness and risk of the construction investment projects
Autorzy:
Kluczuk, P.
Powiązania:
https://bibliotekanauki.pl/articles/115745.pdf
Data publikacji:
2011
Wydawca:
Fundacja na Rzecz Młodych Naukowców
Tematy:
construction
project
investment
effectiveness
risk
Opis:
This paper presents two methods of assessment of effectiveness and risk of construction investment projects. There are compared: one of the probabilistic-statistical methods and Monte Carlo simulation method. The comparative analysis was performed on the example of a specific investment which was the high standard hotel-conference centre. The risk assessment of projects,including construction projects, appears to become necessary. Nowadays, in an era of uncertainty resulting from the recent global fi nancial crisis, it is especially important. Methods described in this paper allow estimating the risk and helping potential investor to take appropriate decisions.
Źródło:
Challenges of Modern Technology; 2011, 2, 3; 44-48
2082-2863
2353-4419
Pojawia się w:
Challenges of Modern Technology
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Risk management system references in construction
Autorzy:
Tkachenko, Volodymyr
Klymchuk, Maryna
Tkachenko, Iryna
Ilina, Tetiana
Powiązania:
https://bibliotekanauki.pl/articles/692569.pdf
Data publikacji:
2020
Wydawca:
Uniwersytet Ekonomiczny w Poznaniu
Tematy:
construction
risk management
dissipation
localization
risk aversion
Opis:
The article examines the basic methods of risk management in construction: risk aversion, localization, dissipation,compensation. The methods are adapted to the specificity of construction companies, taking into account the main directions of their development. For the purpose of effective risk management, formalized functional structuring of risk management in construction is proposed, which will enable the implementation of management functions at two levels – executive and coordinating, with the help of a special structural component in the enterprise management system or a specialized unit in the organizational structure. 
Źródło:
Research Papers in Economics and Finance; 2020, 4, 1; 21-29
2543-6430
Pojawia się w:
Research Papers in Economics and Finance
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Budowa i odbudowa obiektów budowlanych na terenach zagrożonych powodzią
Construction and reconstruction of buildings and structures in areas at risk of flood
Autorzy:
Kietliński, W.
Powiązania:
https://bibliotekanauki.pl/articles/162184.pdf
Data publikacji:
2011
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
obszar zagrożony powodzią
zniszczenie powodziowe
projektowanie
budowa obiektu
rekonstrukcja
areas at risk of flooding
flood damage
designing
construction
reconstruction
Opis:
W okresie ostatnich kilku lat na zlecenie firm ubezpieczeniowych uczestniczyłem w ustalaniu zniszczeń obiektów budowlanych powstałych w wyniku powodzi. Wydaje się, że przynajmniej w kilkunastu na kilkadziesiąt przypadków można byłoby uniknąć zniszczeń lub przynajmniej ograniczyć ich zakres, gdyby niebezpieczeństwo wystąpienia powodzi wzięto pod uwagę na etapie projektowania i budowy obiektu.
Over recent years I have taken part in the assessment of flood damage to buildings and structures for insurance companies. It would appear that in a large proportion of cases it would have been possible to prevent or at least limit the damage had the danger of flood been taken into consideration at the building's design and construction stage.
Źródło:
Przegląd Budowlany; 2011, R. 82, nr 11, 11; 56-58
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Realizujesz kontrakt? Dopilnuj jego ubezpieczenia
Autorzy:
Mleczak, M.
Powiązania:
https://bibliotekanauki.pl/articles/365530.pdf
Data publikacji:
2010
Wydawca:
Nowoczesne Budownictwo Inżynieryjne
Tematy:
kontrakt
ryzyko budowy
ryzyko montażu
ubezpieczenia
assembly
construction
contract
insurance
risk
Opis:
Zaangażowanie w pozyskanie kontraktu budowlanego niezwykle często powoduje osłabienie czujności przy zabezpieczeniu jego wykonawcy na okres realizacji tego kontraktu. Wynegocjowanie warunków umowy i zabezpieczenie zamawiającego (gwarancja należytego wykonania kontraktu i naprawy wad i usterek) jest najważniejsze, jednak potem nadchodzi czas realizacji nie zawsze idzie "jak po maśle".
Źródło:
Nowoczesne Budownictwo Inżynieryjne; 2010, 2; 44-45
1734-6681
Pojawia się w:
Nowoczesne Budownictwo Inżynieryjne
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Analysis of operational risks associated with the construction of Jorge Chavez international airport in Lima-Peru
Autorzy:
Arellano Garcia, Eliezer Jose
Powiązania:
https://bibliotekanauki.pl/articles/2191407.pdf
Data publikacji:
2022
Wydawca:
Stowarzyszenie SILGIS
Tematy:
airport
safety
risk management
construction
aviation
lotnisko
bezpieczeństwo
zarządzanie ryzykiem
budownictwo
lotnictwo
Opis:
In the daily operation of an airport, there are a multitude of hazards that can compromise operational safety; therefore, it is critical to monitor and identify these hazards as well as the associated risks. This work's main objective was to assess the operational risks and hazards that may arise from construction works in the airport environment by applying a methodology for the risk assessment based on historical data of aircraft incidents obtained from SKYbrary Aviation Safety and The Aviation Herald from 2000 to 2015. For this study, it was taken as a reference the expansion work at Jorge Chávez International Airport in the city of Lima, Peru. This is a large-scale project, with the construction of a second runway, a new control tower, taxiways, parking aprons, etc. Ten generic hazards were identified, from which thirty-seven potential risks were derived. However, most of them had a low probability of occurrence, so an "acceptable" tolerability prevailed. Among the recommendations presented (ATIS, NOTAM, visual signs, phraseology, signage, procedures, etc.), these are mainly focused on human factors and in phases 1 and 2 of the construction works, the critical phases where the current runway section is connected to the new taxiways giving access to the second runway.
Źródło:
GIS Odyssey Journal; 2022, 2, 2; 5--22
2720-2682
Pojawia się w:
GIS Odyssey Journal
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Planning repetitive construction processes to improve robustness of schedules in risk environment
Metoda harmonogramowanie powtarzalnych procesów budowlanych zwiększająca odporność harmonogramów w warunkach ryzyka
Autorzy:
Jaśkowski, P.
Biruk, S.
Krzemiński, M.
Powiązania:
https://bibliotekanauki.pl/articles/230760.pdf
Data publikacji:
2020
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
harmonogramowanie
przedsięwzięcie budowlane
proces powtarzalny
harmonogramowanie proaktywne
zarządzanie ryzykiem
budownictwo
metoda symulacji
project scheduling
repetitive processes
construction
proactive scheduling
risk management
simulation method
Opis:
Terminowa i sprawna realizacja przedsięwzięć budowlanych oraz redukcja czasu ich wykonania wpływają na efektywność ekonomiczną inwestycji i działalności gospodarczej wielu podmiotów zaangażowanych w proces inwestycyjny. Cechą specyficzną produkcji budowlanej jest znaczna podatność na oddziaływanie zmiennych warunków realizacji, dlatego też przy harmonogramowaniu nie powinno się pomijać wpływu oddziaływania czynników ryzyka. Wiele przedsięwzięć budowlanych składa się z powtarzalnych procesów, są to m.in. budowy osiedli domów mieszkalnych, budowy obiektów wysokich i wielosekcyjnych, dróg, tuneli, instalacji itd. W celu redukcji czasu ich wykonania obiekty te dzieli się na działki robocze, na których powtarzane jest wykonywanie procesów przez brygady robocze o odpowiednich kwalifikacjach. W przypadku, gdy działki różnią się wielkością i nie występuje zależność wprost proporcjonalna pomiędzy ich wielkością i pracochłonnością robót (jednakowa dla każdego ich asortymentu), na czas realizacji przedsięwzięcia oraz na inne parametry wpływa kolejność zajmowania działek przez brygady. W artykule została przedstawiona metoda wyboru optymalnego harmonogramu robót powtarzalnych realizowanych na działkach niejednorodnych w warunkach ryzyka i optymalnej permutacji działek roboczych. Analizowany problem opisano za pomocą modelu programowania stochastycznego z funkcją celu minimalizującą łączne straty finansowe spowodowane niedotrzymaniem terminu dyrektywnego przedsięwzięcia, wydłużeniem okresu zatrudnienia brygad i czasu realizacji poszczególnych obiektów, na skutek przestojów spowodowanych zjawiskami losowymi. Ze względu na probabilistyczny charakter parametrów rozpatrywanego problemu do jego rozwiązania zaproponowano procedurę bazującą na zastosowaniu metody symulacji komputerowej oraz algorytmów metaheurystycznych lub – w przypadku problemów o małej złożoności z niewielką liczbą działek roboczych – metody przeglądu zupełnego zbioru rozwiązań dopuszczalnych.
Most scheduling methods used in the construction industry to plan repetitive projects assume that process durations are deterministic. This assumption is acceptable if actions are taken to reduce the impact of random phenomena or if the impact is low. However, construction projects at large are notorious for their susceptibility to the naturally volatile conditions of their implementation. It is unwise to ignore this fact while preparing construction schedules. Repetitive scheduling methods developed so far do respond to many constructionspecific needs, e.g. of smooth resource flow (continuity of work of construction crews) and the continuity of works. The main focus of schedule optimization is minimizing the total time to complete. This means reducing idle time, but idle time may serve as a buffer in case of disruptions. Disruptions just happen and make optimized schedules expire. As process durations are random, the project may be delayed and the crews’ workflow may be severely affected to the detriment of the project budget and profits. For this reason, the authors put forward a novel approach to scheduling repetitive processes. It aims to reduce the probability of missing the deadline and, at the same time, to reduce resource idle time. Discrete simulation is applied to evaluate feasible solutions (sequence of units) in terms of schedule robustness.
Źródło:
Archives of Civil Engineering; 2020, 66, 3; 643-657
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Analiza czasowo-kosztowa planowanego przedsięwzięcia budowlanego przy zastosowaniu zbiorów rozmytych
The time-cost analysis of the construction project based on fuzzy sets
Autorzy:
Minasowicz, A.
Kostrzewa, B.
Powiązania:
https://bibliotekanauki.pl/articles/403171.pdf
Data publikacji:
2011
Wydawca:
Politechnika Białostocka. Oficyna Wydawnicza Politechniki Białostockiej
Tematy:
ryzyko
analiza
budownictwo
zarządzanie
zbiory rozmyte
risk
analysis
construction
management
fuzzy sets
Opis:
Prezentowana analiza służy ocenie ryzyka przedsięwzięcia budowlanego w fazie zarządzania wartością i ryzykiem planowanej inwestycji. Na bazie szacowania kosztów oraz planowanego harmonogramu czasowego przedsięwzięcia przy wykorzystaniu wiedzy eksperckiej ustala się możliwe odchyłki czasu i kosztu poszczególnego zadania. W celu przetworzenia informacji wejściowych wprowadzono modelowanie rozmyte. Przy zastosowaniu metod obliczeniowych teorii zbiorów rozmytych takich jak wyznaczanie funkcji wynikowej metodą średniej arytmetycznej oraz wyostrzaniu zbioru rozmytego metodą środka ciężkości, przedstawiona procedura pozwala na określenie optymistycznych i pesymistycznych scenariuszy przedsięwzięcia pod względem czasu i kosztu. W wyniku takich działań określono ryzyka związane z czasem i kosztem przedsięwzięcia, co pozwala na porównanie różnych inwestycji bądź technologii wykonania, a następnie wybór wariantu optymalnego.
The proposed analysis aim is to review a detail risk for a given project at the stage of value engineering of the integrated value and risk management. On the basis of the cost estimation and the time schedule establishing, for individual groups of works, the cost or time deviations for each task are specified. Expert knowledge is used for this purpose. In order to transform the input information, it is necessary to introduce fuzzy modelling, which includes fuzzification, inference and defuzzification processes. The proposed procedure allows for automatic determination of optimistic and pessimistic project scenarios with regard to both time and cost, using simple math operators like the arithmetic average and the center of mass. In this way, we obtain the quantified risks associated with time and cost of the project, which allows for comparison of several technologies for implementation of the same project and selection of the most optimum variant.
Źródło:
Budownictwo i Inżynieria Środowiska; 2011, 2, 4; 595-604
2081-3279
Pojawia się w:
Budownictwo i Inżynieria Środowiska
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Określenie charakteru i wartości ryzyka prac geodezyjnych z zastosowaniem logiki rozmytej
Determining the nature and value of the risk of geodetic works using fuzzy logic
Autorzy:
Kowacka, Magdalena
Skorupka, Dariusz
Duchaczek, Artur
Dudziak-Gajowiak, Dominika
Waniewska, Agnieszka
Powiązania:
https://bibliotekanauki.pl/articles/1064832.pdf
Data publikacji:
2020
Wydawca:
Szkoła Główna Gospodarstwa Wiejskiego w Warszawie. Wydawnictwo Szkoły Głównej Gospodarstwa Wiejskiego w Warszawie
Tematy:
budownictwo
ryzyko
geodezja
droga
construction
risk
geodesy
road
Opis:
The article is a continuation of the series of works on the method for risk analysis in surveying works in road construction projects. The paper presents the application of fuzzy logic to determine the nature and value of the risk of surveying works based on a database of rules and affiliation functions provided by experts. The fact that the issue of occurrence of risk factors in road construction works is not deterministic justifies the above. In such works, there are many uncertainties in establishing the value of their duration in the long term. The theoretical framework of the method is presented together with an example of its application. Moreover, research results are compared with previous publications using other research tools.
Źródło:
Scientific Review Engineering and Environmental Sciences; 2020, 29, 4; 494-502
1732-9353
Pojawia się w:
Scientific Review Engineering and Environmental Sciences
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Bezzałogowe statki powietrzne w budownictwie - protokół bezpiecznego przygotowania i lotu dronem
Unmanned aerial vehicles in the construction - protocol for safe drone preparation and flight
Autorzy:
Szóstak, Mariusz
Nowobilski, Tomasz
Powiązania:
https://bibliotekanauki.pl/articles/2202738.pdf
Data publikacji:
2022
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
bezzałogowy statek powietrzny
BSP
dron
bezpieczeństwo
technologia nowoczesna
budownictwo
przygotowanie do lotu
ocena ryzyka
unmanned aerial vehicle
UAV
drone
safety
new technology
construction
flight preparation
risk assessment
Opis:
Bezzałogowe statki powietrzne, potocznie nazywane dronami, są szeroko stosowane w wielu sektorach gospodarki, w tym w budownictwie. Należy być świadomym, że bezzałogowe statki powietrzne stwarzają nowe, dotychczas niewystępujące zagrożenia w budownictwie. Nowe zagrożenia wynikają m.in. z rozwoju nowych technologii, a także ciągłej automatyzacji i robotyzacji branży budowlanej. W tym celu opracowano procedurę (protokół) postępowania dla poprawnego, bezpiecznego przygotowania i zaplanowania lotu bezzałogowym statkiem powietrznym na potrzeby operacji przeprowadzanej w budownictwie.
Unmanned aerial vehicles, commonly known as drones, are widely used in many sectors of the economy, including construction. It is important to be aware that unmanned aerial vehicles pose new risks in the construction industry that have not existed before. The new risks are due, among other things, to the development of new technologies, as well as the continued automation and robotisation of the construction industry. For this purpose, a procedure (protocol) has been developed for the correct, safe preparation and planning of an unmanned aircraft flight for a construction operation.
Źródło:
Przegląd Budowlany; 2022, 93, 9-10; 117--120
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Na obecnym etapie nie ma zagrożeń dla terminowej budowy spalarni odpadów komunalnych w Krakowie
At this stage, there is no risk for completion on time of the municipal waste incineration plant in Kraków
Autorzy:
Langer, R.
Biedrzycka, A.
Powiązania:
https://bibliotekanauki.pl/articles/364416.pdf
Data publikacji:
2014
Wydawca:
Nowoczesne Budownictwo Inżynieryjne
Tematy:
spalarnia odpadów komunalnych
wywiad
Kraków
budowa
polityka odpadowa
segregacja odpadów
incineration of municipal waste
interview
construction
waste policy
segregation of waste
Opis:
Wywiad z Ryszardem Langerem, prezesem zarządu Krakowskiego Holdingu Komunalnego SA
Anna Biedrzycka talks to Ryszard Langer, president of the board of Municipal Holding of Kraków SA. At the moment, there are six municipal waste incineration plants in construction in Poland, but the Thermal Waste Treatment Plant in Kraków will be larest, capable of disposing of over 114 tons of waste per hour on each of the two independent process lines. Annually, the plant's capacity will be 220 thousand tons of waste, and energy recovery from the waste will generate ca. 65 thousand MWh of electric power and ca. 280 thousand MWh of heat power.
Źródło:
Nowoczesne Budownictwo Inżynieryjne; 2014, 3; 12-16
1734-6681
Pojawia się w:
Nowoczesne Budownictwo Inżynieryjne
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Kanalizacja podciśnieniowa jako rozwiązanie systemów kanalizacji na terenach zagrożonych powodziami oraz o trudnych warunkach gruntowo-wodnych
Vacuum sewerage system as a solution for sewage systems in flood-threatened areas and territories with difficult land-water conditions
Autorzy:
Piętka, J.
Powiązania:
https://bibliotekanauki.pl/articles/162548.pdf
Data publikacji:
2017
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
obszar zagrożony powodziami
kanalizacja
kanalizacja podciśnieniowa
budowa
funkcjonowanie
flood risk area
sewerage
vacuum sewerage system
construction
operation principle
Opis:
Kanalizacja podciśnieniowa jest rozwiązaniem o krótkiej historii w stosunku do powszechnie stosowanych systemów odprowadzających ścieki bytowo gospodarcze z budynków mieszkalnych. Jednak dzięki nowatorskiemu podejściu oraz zaangażowaniu się przedstawicieli świata nauki z Europy Zachodniej szybko stała się systemem, który zapewnia bardzo wygodny i bezpieczny transport ścieków bytowo-gospodarczych. Dzięki przyjętym rozwiązaniom zapewniającym praktycznie 100% szczelność systemu, kanalizacja podciśnieniowa jest rozwiązaniem, którego stosowanie wskazane jest w terenach zalewowych oraz o trudnych warunkach gruntowo-wodnych. Przykładem takiego zastosowania mogą być instalacje w całym świecie m.in. gminie Odolanów (południowa Wielkopolska).
The vacuum sewerage system is a relatively recently found solution in relation to the systems commonly used for discharging domestic sewage from residential buildings. However, due to an innovative approach and commitment of Western European scientific community representatives, it has quickly become a system, which provides very convenient and safe transportation of domestic and industrial wastewater. Thanks to the adopted solutions resulting in almost 100% tightness of the system, the vacuum sewerage is particularly suitable for use in floodplains and areas with difficult land-water conditions. Examples of such applications are installations found throughout the world, for instance in Odolanów municipality (Southern Wielkopolska).
Źródło:
Przegląd Budowlany; 2017, 88, 9; 62-65
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-12 z 12

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies