Tytuł pozycji:

Analysis of operational risks associated with the construction of Jorge Chavez international airport in Lima-Peru

Tytuł:
Analysis of operational risks associated with the construction of Jorge Chavez international airport in Lima-Peru
Autorzy:
Arellano Garcia, Eliezer Jose
Powiązania:
https://bibliotekanauki.pl/articles/2191407.pdf
Data publikacji:
2022
Wydawca:
Stowarzyszenie SILGIS
Tematy:
airport
safety
risk management
construction
aviation
lotnisko
bezpieczeństwo
zarządzanie ryzykiem
budownictwo
lotnictwo
Źródło:
GIS Odyssey Journal; 2022, 2, 2; 5--22
2720-2682
Język:
angielski
Prawa:
CC BY: Creative Commons Uznanie autorstwa 4.0
Dostawca treści:
Biblioteka Nauki
Artykuł
  Przejdź do źródła  Link otwiera się w nowym oknie
In the daily operation of an airport, there are a multitude of hazards that can compromise operational safety; therefore, it is critical to monitor and identify these hazards as well as the associated risks. This work's main objective was to assess the operational risks and hazards that may arise from construction works in the airport environment by applying a methodology for the risk assessment based on historical data of aircraft incidents obtained from SKYbrary Aviation Safety and The Aviation Herald from 2000 to 2015. For this study, it was taken as a reference the expansion work at Jorge Chávez International Airport in the city of Lima, Peru. This is a large-scale project, with the construction of a second runway, a new control tower, taxiways, parking aprons, etc. Ten generic hazards were identified, from which thirty-seven potential risks were derived. However, most of them had a low probability of occurrence, so an "acceptable" tolerability prevailed. Among the recommendations presented (ATIS, NOTAM, visual signs, phraseology, signage, procedures, etc.), these are mainly focused on human factors and in phases 1 and 2 of the construction works, the critical phases where the current runway section is connected to the new taxiways giving access to the second runway.

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies