Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Wyszukujesz frazę "5 why" wg kryterium: Temat


Wyświetlanie 1-19 z 19
Tytuł:
An analysis of work of maintenance department employees
Autorzy:
Zasadzień, M.
Kwaśna, E.
Powiązania:
https://bibliotekanauki.pl/articles/359054.pdf
Data publikacji:
2012
Wydawca:
Akademia Morska w Szczecinie. Wydawnictwo AMSz
Tematy:
work time
maintenance
5WHY
Opis:
The article presents the results of research into the time of work of maintenance department employees in a selected production plant. The measurements have been taken for three selected employees during 9 working days. Major activities performed by the employees have been identified and classified in three basic groups: the effective time devoted to daily duties connected with technical means maintenance, the auxiliary time which involves preparatory and administrative works as well as the ineffective time during which the employees undertook activities not related to the performed work. Among the ineffective and auxiliary activities the longest lasting ones have been specified. By means of the 5Why Method the causes responsible for the occurrence of major ineffective and auxiliary activities have been identified. As a result of the conducted analysis, corrective measures aimed at shortening the time of these activities have been identified, which should contribute to the improvement of maintenance department employees’ work effectiveness.
Źródło:
Zeszyty Naukowe Akademii Morskiej w Szczecinie; 2012, 32 (104) z. 1; 131-135
1733-8670
2392-0378
Pojawia się w:
Zeszyty Naukowe Akademii Morskiej w Szczecinie
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Application of quality engineering to improve of the cars cockpit elements assembly process
Zastosowanie inżynierii jakości w doskonaleniu procesu montażu elementów kokpitu samochodowego
Autorzy:
Molenda, M.
Powiązania:
https://bibliotekanauki.pl/articles/112983.pdf
Data publikacji:
2017
Wydawca:
STE GROUP
Tematy:
quality improvement
5why method
Pareto Chart
doskonalenie jakości
metoda 5why
diagram Pareto
Opis:
The article presents an example of the use of quality engineering methods to improve the assembly process in the production company car accessories – varnished elements of the cockpit. The main part of the article is a description of the improvement project that was carried out in the selected company. This section describes problems with defect of the assembly process and its improvement. The end of the article is an assessment of the effectiveness of the improvement actions undertaken.
W artykule przedstawiono przykład zastosowania metod inżynierii jakości do doskonalenia procesu montażu w przedsiębiorstwie produkcyjnym elementy wyposażenia samochodów – lakierowane elementy kokpitu. Głowna część artykułu stanowi opis projektu doskonalenia jaki został przeprowadzony w wybranym przedsiębiorstwie. W tej części zawarto opis problemów z wadliwością procesu montażu oraz działania podjęte w celu jego udoskonalenia. Artykuł zawiera także ocenę skuteczności wdrożonych rozwiązań.
Źródło:
Systemy Wspomagania w Inżynierii Produkcji; 2017, 6, 4; 153-158
2391-9361
Pojawia się w:
Systemy Wspomagania w Inżynierii Produkcji
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Typical Quality Defects of the „Alphin” Inserts in Engine Pistons
Autorzy:
Piątkowski, J.
Kamiński, P.
Powiązania:
https://bibliotekanauki.pl/articles/380070.pdf
Data publikacji:
2015
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
Al-Si cast alloy
alphin inserts
engine piston
5M why method
5 Why Method
quality defect
stop odlewniczy Al-Si
tłok silnikowy
metoda 5M why
metoda 5 why
wada jakości
Opis:
In the dissertation, the 5M Method, is being presented, of typical causes and consequences of quality defects of cast-iron inserts „alphin” embedded in aluminum cast. The diffusive connection of those rings, with pistons casts is being used, because of the extreme conditions in which they need to operate in, which are of high temperature and variable thermo-mechanical burden, which are in the working chamber of combustion engine.
Źródło:
Archives of Foundry Engineering; 2015, 15, 2 spec.; 65-68
1897-3310
2299-2944
Pojawia się w:
Archives of Foundry Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Application methods for analysis car accident in industry on the example of power
Zastosowanie metody RCA do analizy awarii w przemyśle na przykładzie elektrowni
Autorzy:
Wolniak, R.
Powiązania:
https://bibliotekanauki.pl/articles/112895.pdf
Data publikacji:
2017
Wydawca:
STE GROUP
Tematy:
RCA analysis
FMEA analysis
Ishikawa diagram
5-Why method
analiza RCA
analiza awaryjności
metoda FMEA
diagram Ishikawy
metoda 5-Why
Opis:
The paper presents the concept of using the RCA method to failure analysis on the example of power plant. Nowadays, where the speed plays a big role in business, it’s not easy to get to the root causes of failure. RCA Method (Root Cause Analysis) is an analysis of root causes, it is an independent and comprehensive method of risk analysis used to study, identify and classify the root causes of incidents establishment in the work. The aim of the publication is to examine the benefits of using the analysis of RCA as a reactive method of identifying the causes, discovering problems and solving them in the company.
W publikacji przedstawiono koncepcję wykorzystania metody RCA do analizy awarii na przykładzie elektrowni. W dzisiejszych czasach gdzie pośpiech gra wielką rolę mało kto próbuje dotrzeć do przyczyn źródłowych awarii. Metoda RCA (Root Cause Analysis ) jest analizą przyczyn źródłowych, jest ona niezależną i kompletną metodą analizy ryzyka, służącą do badania, identyfikacji oraz sklasyfikowania przyczyń źródłowych zdarzeń zagrażających zakładowi pracy. Celem publikacji jest zbadanie korzyści płynących z zastosowania analizy RCA jako reaktywnej metody identyfikowania przyczyn, odkrywania problemów i ich rozwiązywania w firmie.
Źródło:
Systemy Wspomagania w Inżynierii Produkcji; 2017, 6, 4; 34-40
2391-9361
Pojawia się w:
Systemy Wspomagania w Inżynierii Produkcji
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Identifying the source of the problem by using implemented the FAHP method in the selected quality management techniques
Autorzy:
Siwiec, Dominika
Pacana, Andrzej
Powiązania:
https://bibliotekanauki.pl/articles/111854.pdf
Data publikacji:
2020
Wydawca:
Stowarzyszenie Menedżerów Jakości i Produkcji
Tematy:
Ishikawa diagram
FAHP
5Why
incompatibility
quality management
Fuzzy Analytic Hierarchy Process
Diagram Ishikawy
schemat Ishikawy
metoda 5Why
zarządzanie jakością
Opis:
Making a complex analysis of the problem in order to identify the root of its occurrence, is the process burdened with the risk of uncertainty. This risk is in case of the quality analysis, in which the choice and making a decision is not confirmed by reliable information (number). This risk is in case of the quality analysis, in which the choice and making a decision is not confirmed by reliable information (number). But these techniques do not include the risk of uncertainty, so their sequence should be expanded about the appropriate method, to take this into account. It was considered beneficial to demonstrate that this method is the Fuzzy Analytic Hierarchy Process method (FAHP). The aim of the study to implement the FAHP method in the sequence of traditional quality management techniques (Ishikawa diagram and 5Why method) and proposition new, not practiced yet the method to complex analysis of the problem and identify the root of its root cause. The subject of the study was the furniture front, on which the incompatibility was identified (shortened foil). From the categories to which the potential causes of the inadequate foil were assigned, by using the Ishikawa diagram and the FAHP method in an integrated manner, were defined the most important categories (method and machine) in a precise (numerical) way. Next, using the same tools, the relationship between the potential causes was analysed and selected the main causes of the problem. Then, by using the 5Why method the root of the problem was defined (lack of the new machine and failure to comply with labor standards). The obtained results could differ depending on the subjectivity, however, the method itself proved to be effective and can be used to solve other types of the problem.
Źródło:
Production Engineering Archives; 2020, 26; 5-10
2353-5156
2353-7779
Pojawia się w:
Production Engineering Archives
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Improvement of selected logistics processes using quality engineering tools
Autorzy:
Zasadzień, M.
Žarnovský, J.
Powiązania:
https://bibliotekanauki.pl/articles/409831.pdf
Data publikacji:
2018
Wydawca:
STE GROUP
Tematy:
logistics
warehouse
e-commerce
quality
5 Why
FMEA
improvement
Opis:
ncrease in the number of orders, the increasing quality requirements and the speed of order preparation require implementation of new solutions and improvement of logistics processes. Any disruption that occurs during execution of an order often leads to customer dissatisfaction, as well as loss of his/her confidence. The article presents a case study of the use of quality engineering methods and tools to improve the e-commerce logistic process. This made it possible to identify and prioritize key issues, identify their causes, and formulate improvement and prevention measures.
Źródło:
Management Systems in Production Engineering; 2018, 1 (26); 55-59
2299-0461
Pojawia się w:
Management Systems in Production Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Doskonalenie jakości procesu obsługi klienta z wykorzystaniem metod 5W2H i 5Why
The service process quality improvement by using the 5W2H and 5Why methods
Autorzy:
Kowalik, K.
Klimecka-Tatar, D.
Powiązania:
https://bibliotekanauki.pl/articles/108971.pdf
Data publikacji:
2017
Wydawca:
Stowarzyszenie Menedżerów Jakości i Produkcji
Tematy:
doskonalenie
jakość
metoda 5why
metoda 5W2H
proces obsługi klienta
customer service process
improvement
5why method
5W2H method
quality
Opis:
Celem artykułu jest praktyczne zastosowanie metod 5W2H oraz 5Why w procesie doskonalenia jakości obsługi klienta w wybranym przedsiębiorstwie usługowym. Jego pierwsza część zawiera przybliżenie pojęcia doskonalenia procesu obsługi klienta oraz teoretyczną charakterystykę wybranych metod badawczych. Następnie, zidentyfikowane w procesie obsługi problemy zostały dokładnie opisane w oparciu o założenia metody 5W2H oraz wskazano główne przyczyny ich występowania poprzez wykorzystanie metody 5Why.
The purpose of this paper is the practical application of the 5W2H and 5Why methods in service process quality improving in chosen service company. The first part of the article contains the characteristic of the service process improvement and the theoretical framework of the research methods. Afterwards, the problems identified in the service process were thoroughly described based on the 5W2H method and the main reason for their occurrence were pointed out by using the 5Why method.
Źródło:
Archiwum Wiedzy Inżynierskiej; 2017, 2, 2; 24-26
2544-2449
Pojawia się w:
Archiwum Wiedzy Inżynierskiej
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Increasing the Efficiency of Furniture Production – Case Study
Autorzy:
Karwasz, Anna
Rewers, Paulina
Chrzanowska, Adrianna
Chwacińska, Natalia
Powiązania:
https://bibliotekanauki.pl/articles/24200515.pdf
Data publikacji:
2023
Wydawca:
Polska Akademia Nauk. Czasopisma i Monografie PAN
Tematy:
production efficiency
lean manufacturing
Six Sigma
5 WHY method
FMEA
Opis:
The article presents the possibility of increasing the production efficiency in an enterprise dealing in the production of lounge furniture. The literature review shows that Poland is the sixth country in the world in the amount of furniture production. It is also one of the leading exporters of upholstered furniture in Europe. Each year, the value of furniture sales production increases by a few percentage points. Due to the constantly growing customer orders, many companies in this industry are struggling with delays in delivering products to customers. This problem also occurs in the analyzed company. While analyzing the production process, the occurrence of a large number of non-conformities was also noticed. An analysis was carried out to indicate the number of non-conformities and the place of their occurrence. The FMEA analysis was used, which indicated which non-conformities are the most important, and the 5Why method, which allowed to indicate the cause of their occurrence. The analysis of production processes showed which activities do not bring added value and how they can be eliminated at no cost. All these measures contributed to increasing the efficiency of the production of lounge furniture.
Źródło:
Management and Production Engineering Review; 2023, 14, 3; 75--81
2080-8208
2082-1344
Pojawia się w:
Management and Production Engineering Review
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Bariery i ograniczenia wdrażania koncepcji lean management – wyniki badań
Barriers and limitations of implementing lean management concept – results of research
Autorzy:
Podobiński, Mateusz
Powiązania:
https://bibliotekanauki.pl/articles/419873.pdf
Data publikacji:
2015
Wydawca:
Wydawnictwo Uniwersytetu Ekonomicznego we Wrocławiu
Tematy:
barriers of lean management implementation
management
dictate
5 WHY analysis
Opis:
Companies operation in variable surroundings causes the increase of customers requirements. They expect inter alia: high quality products delivered on time and low prices. Thus a lot of non-production companies decided to implement lean management concept. It results inter alia from the positive effects of using Japanese management concepts, methods and techniques, but also from “dictate”. Parent companies are implementing lean management concept in subsidiaries without appropriate preparation. The aim of this article is to present − on the basis of research results − limitations in implementing lean management concept. The author presents 5 barriers and negative results. The author pays attention to the role of management involvement in a change, that is lean management. This article shows the reasons of desired effects lack of lean management concept using based on 5 WHY analysis.
Źródło:
Nauki o Zarządzaniu; 2015, 3 (24); 112-122
2080-6000
Pojawia się w:
Nauki o Zarządzaniu
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Improving the quality of construction products with the use of control points
Doskonalenie jakości wyrobów budowlanych z wykorzystaniem punktów kontroli
Autorzy:
Czerwińska, Karolina
Pacana, Andrzej
Powiązania:
https://bibliotekanauki.pl/articles/2065674.pdf
Data publikacji:
2019
Wydawca:
Politechnika Częstochowska
Tematy:
punkt kontroli jakości
beton
diagram Pareto-Lorenza
metoda 5Why
budownictwo zrównoważone
quality control point
concrete
Pareto-Lorenz diagram
5Why method
balanced construction
Opis:
Effective quality management is a factor that determines the development of a company. Quality management measures include quality planning, quality control, quality assurance and quality improvement. The aim of the research was to diagnose the condition of a cable well at quality control points and to precisely define the reasons why appropriate preventive measures could significantly contribute to the reduction of the number of non-compliant products. Additionally, the aim was to propose a sequence of actions supporting the analysis of production problems (occurrence of incompatibilities in the tested product). Due to the growing number of complaints in the company and the lack of analysis of the causes of the situation. Sequences of quality management methods were applied, thanks to which inconsistencies occurring in products were classified in terms of their significance and frequency of occurrence (Pareto-Lorenza diagram). Additionally, the analysis of the reasons for non-compliance was performed (method 5Why?). The most important inconsistency in the tested product are cracks in the bottom part of the product, which is caused by low qualifications of the employees.
Efektywne zarządzanie jakością stanowi czynnik warunkujący rozwój przedsiębiorstwa. Środki zarządzania jakością obejmują planowanie jakości, kontrolę jakości, zapewnienie jakości i poprawę jakości. Celem badań było zdiagnozowanie w punktach kontroli jakości stanu studni kablowej oraz precyzyjne określenie przyczyn, w stosunku do których odpowiednie działania zapobiegawcze mogłyby w znaczący sposób przyczynić się do zmniejszenia liczby niezgodnych wyrobów. Dodatkowo celem było zaproponowanie sekwencji działań wspomagających analizę problemów produkcyjnych (występowanie niezgodności w badanym wyrobie). W związku z rosnącą liczbą reklamacji w przedsiębiorstwie oraz brakiem analiz przyczyn zaistniałej sytuacji zastosowano sekwencje metod zarządzania jakością, dzięki czemu sklasyfikowano niezgodności występujące w wyrobach pod kątem ich istotności oraz częstości występowania (diagram Pareto-Lorenza). Dodatkowo wykonano analizę przyczyn niezgodności (metoda 5Why?). Najistotniejszą niezgodnością w badanym wyrobie są pęknięcia dolnej części wyrobu, czego przyczyną są niskie kwalifikacje pracowników.
Źródło:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym; 2019, 8, 1; 19--28
2299-8535
2544-963X
Pojawia się w:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The use of quality management techniques to analyse the cluster of porosities on the turbine outlet nozzle
Autorzy:
Siwiec, Dominika
Pacana, Andrzej
Powiązania:
https://bibliotekanauki.pl/articles/111779.pdf
Data publikacji:
2019
Wydawca:
Stowarzyszenie Menedżerów Jakości i Produkcji
Tematy:
quality
unconformity
mechanical engineering
Ishikawa diagram
5Why method
niezgodność
identyfikacja niezgodności
inżynieria mechaniczna
schemat Ishikawy
diagram Ishikawy
metoda 5Why
jakość
zarządzanie jakością
Opis:
As part of continuous quality improvement in well-managed enterprises, identifying unconformity should initiate actions to find their causes. Therefore, it was proposed to the enterprise located in Podkarpacie to use in the sequential way the Ishikawa diagram and 5Why method. The aim was to analyse of unconformity (porosity cluster) on the turbine outlet nozzle and identify the root of its creation. In the enterprise, the quality analysis of the products with a fluorescent method was carried out, but after identifying the unconformity, non-analysis of their reason for their occurrence was not practiced. Therefore, it was intentional to propose the use of sequence i.e. Ishikawa diagram and 5Why method to identify the root of unconformity. The subject of study was the turbine outlet nozzle, on which the fluorescent method the porosity cluster was identified. With the use of the Ishikawa diagram, the main cause of the problem was pointed (unconformity during production), and by the 5Why method the root cause of the problem, i.e. unconformity material from the supplier, was identified. The proposed method sequence is a simple and effective way to make analyses of unconformities and it can be used in different products and service enterprises.
Źródło:
Production Engineering Archives; 2019, 24; 33-36
2353-5156
2353-7779
Pojawia się w:
Production Engineering Archives
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Lean waste identification in higher education institution using waste assessment model
Autorzy:
Mulyana, Ig Jaka
Hartanti, Lusia Permata Sari
Herdianto, Vincentius Aditya
Gunawan, Ivan
Herwinarso, Herwinarso
Powiązania:
https://bibliotekanauki.pl/articles/27315496.pdf
Data publikacji:
2022
Wydawca:
STE GROUP
Tematy:
lean
waste
waste assessment model
5-why’s
higher education institution
Opis:
Lean is a philosophy that is seen as a solution to resolve the problem of efficiency in various industries. It can be used to eliminate all forms of waste in the workplace. The implementation of lean is not only applied in manufacturing but is very important to be applied in other fields, such as in Higher Education Institution. Studies on the topic of lean in the workplace have been carried out, but most of the study has been conducted within a manufacturing context. This study aims to determine the type of waste that is most important to be eliminated first by using the Waste Assessment Model and find the root of the waste problem. This study developed the relationship between waste and find out the effect of waste on each other in Higher Education Institution that focused on teaching and learning process. The steps of this study consist of three-step, such as waste identification, waste assessment, and root cause analysis. From data collection show that there are 46 forms of waste in the teaching and learning process. The results of the Waste Relationship Matrix showed three types of waste must be removed first, namely overproduction, defects, and non-utilized talents. 5-Why's is used to find out the root causes of waste which is the most important to be eliminated first in the teaching and learning process.
Źródło:
Management Systems in Production Engineering; 2022, 3 (30); 200--206
2299-0461
Pojawia się w:
Management Systems in Production Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Zarządzanie jakością wyrobów dziecięcych
Quality management of products for children
Autorzy:
Krynke, J.
Ingaldi, M.
Powiązania:
https://bibliotekanauki.pl/articles/109007.pdf
Data publikacji:
2017
Wydawca:
Stowarzyszenie Menedżerów Jakości i Produkcji
Tematy:
quality
Pareto chart
FMEA
5 why
jakość
diagram Pareto-Lorenza
5 razy dlaczego
Opis:
Problematyka jakości jest szczególnie ważna w przypadku wyrobów dla dzieci. Wyrobom takim stawia się bardzo specyficzne wymagania zgodnie z Dyrektywą 2001/95/WE Parlamentu Europejskiego I Rady z dnia 3 grudnia 2001 r. w sprawie ogólnego bezpieczeństwa produktów. Kupując wyroby dla dzieci warto też zwracać uwagę na różnorodne certyfikaty, nagrody, znaki jakości, które umieszczane są na wyrobach. Informują one klientów o tym, że producent danego wyrobu szczególnie dba o jego jakość i stara się wyróżniać na rynku. Celem pracy jest analiza jakości wyrobów dziecięcych. Założono, że zastosowanie wybranych metod analizy oceny jakości, wpłynie pozytywnie na rozeznanie obszarów pojawiania się niezgodności i odpowiednie wykorzystanie działań naprawczych. W artykule przeprowadzono analizę jakości nosidełka dla dzieci produkowanego przez przedsiębiorstwo Womar. Jest to jeden z najpopularniejszych produktów tego przedsiębiorstwa. Do analizy wykorzystano diagram Pareto-Lorenza, metodę FMEA oraz metodę 5 razy dlaczego. Diagram Pareto-Lorenza pozwolił wskazać najczęściej występujące przyczyny niezgodności. W metodzie FMEA podano działania naprawcze i sprawdzono ich wynik. Natomiast metoda 5 razy dlaczego pozwoliła wskazać ukrytą przyczynę problemu.
The issue of quality is particularly important in the case of products for children. Such products are subject to very specific requirements in accordance with the Directive 2001/95/EC of The European Parliament And Of The Council of 3 December 2001 on general product safety. Buying products for children we should also pay attention to a variety of certificates, awards, quality marks, which are placed on the products. They inform customers that the manufacturer of the certain product is particularly concerned about its quality and strives to stand out in the market. The purpose of the work is to analyze the quality of the products for children. It has been assumed that the use of selected methods and tools of quality assessment analysis would have a positive impact on discerning the areas of nonconformity and appropriate use of corrective actions. In the article the quality analysis of the baby carriers manufactured by the enterprise Womar was conducted. This is one of the most popular products of this enterprise. In the analysis following instruments were used Pareto chart, FMEA, 5 why. The Pareto chart let indicate the most common causes of nonconformity. In the FMEA analysis corrective actions were listed and their results were checked. While the 5 why helped to identify the hidden cause of the problem.
Źródło:
Archiwum Wiedzy Inżynierskiej; 2017, 2, 1; 35-38
2544-2449
Pojawia się w:
Archiwum Wiedzy Inżynierskiej
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Key Performance Indicators (KPIs) as a Tool to Improve Product Quality
Autorzy:
Midor, Katarzyna
Sujová, Erika
Cierna, Helena
Zarebinska, Danuta
Kaniak, Wojciech
Powiązania:
https://bibliotekanauki.pl/articles/2064328.pdf
Data publikacji:
2020
Wydawca:
STE GROUP
Tematy:
Key Performance Indicators
quality
efficiency
product
5 WHY
kluczowe wskaźniki efektywności
jakość
efektywność
produkt
Opis:
The literature includes a wide selection and distribution of performance indicators to be used in different areas of the company. The paper highlights the Key Performance Indicators (KPIs) as those that are the most universal and allow the control of intended targets in different areas of the enterprise. KPIs are financial and non-financial process measures used to assess the degree of achievement with regard to strategic and operational objectives in a company. They are also used to measure the effectiveness of all activities undertaken in an organizational unit. The paper presents the possibility of using KPIs to improve the quality of manufactured products, by analyzing the trend of selected indicators. This analysis gave an impulse to undertake improvement actions in the company consisting in the use of quality management method – in this case 5 WHY leading to the initiation of preventive and corrective actions in the occurrence of defective products.
Źródło:
New Trends in Production Engineering; 2020, 3, 1; 347--354
2545-2843
Pojawia się w:
New Trends in Production Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Improving the quality of the product using non-destructive testing and selected quality management instruments
Autorzy:
Siwiec, Dominika
Czerwińska, Karolina
Pacana, Andrzej
Malindžák, Dušan
Powiązania:
https://bibliotekanauki.pl/articles/323835.pdf
Data publikacji:
2019
Wydawca:
Politechnika Śląska. Wydawnictwo Politechniki Śląskiej
Tematy:
quality
incompatibility
penetration method
Ishikawa diagram
5Why
jakość
niezgodność
metoda penetracyjna
diagram Ishikawy
Opis:
Effective quality management of the product is an element that allows profit within the enterprise. Identifying unconformity and establishing their source enables quality. However, identifying unconformity is sometimes neglected. Such was evident in the analysis of the service-manufacturing enterprise located in Podkarpacie. In the enterprise, quality was assessed via non-destructive testing (via fluorescence), but decisions on sources of non-compliance were made without utilizing additional methods that allow source identification. Hence, the way of recognizing unconformity was not precise. Therefore, method sequence (Ishikawa diagram and 5Why method) approaches were proposed to enable this. The aim of this paper is to show the effectiveness of such approaches in identifying sources of unconformity. The subject of study was tubing that is used in aircraft engines. Via the applied analysis, the unconformity in production and the source cause was traced to material supplied from outside. The proposed method sequence approach can be used in other enterprises for quality analyses purposes.
Źródło:
Zeszyty Naukowe. Organizacja i Zarządzanie / Politechnika Śląska; 2019, 135; 169-178
1641-3466
Pojawia się w:
Zeszyty Naukowe. Organizacja i Zarządzanie / Politechnika Śląska
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Improving work organisation in the production hall – a case study
Autorzy:
Zasadzień, Michał
Powiązania:
https://bibliotekanauki.pl/articles/1929133.pdf
Data publikacji:
2020
Wydawca:
Politechnika Śląska. Wydawnictwo Politechniki Śląskiej
Tematy:
VSM
logistics
process
one piece flow
stock
5 WHY
lean manufacturing
logistyka
proces
przepływ jednoczęściowy
zapas materiałów
Opis:
Purpose: The aim of the research was to assess the effectiveness of implementing Lean Manufacturing (One-Piece-Flow) elements in a company producing shock absorbers. Design/methodology/approach: With the help of VSM, the most important problem in the production process was diagnosed, and by using the 5 Whys tool, the root causes of the problems were identified. A simulation of introducing the One-Piece-Flow system into the production line was then used to estimate the most optimal solution. After choosing the solution, it was implemented, and the results obtained were verified. Findings: As a result of the conducted analyses, the most important problems related to planning, scheduling and the flow of intermediates were identified. The 5 Whys analysis allowed for the grouping of individual problems by common causes. Detailed solutions to the problems were proposed, which were included in the future Value Stream Map. Research limitations/implications: Conducting research in a working production process is limited and faces significant resistance from managers. Practical implications: The most important effects of implementing an improvement plan were minimising inventory from 138,062 units to 25,000 units, which reduced costs and indicates reduced waste. Lead time was limited to 9.67 days from 56.96 days. Originality/value: Research results confirm the effectiveness of introducing only some solutions of the Lean philosophy. This is particularly important if the enterprise is unable to comprehensively implement the Lean Manufacturing concept due to organisational or financial reasons.
Źródło:
Zeszyty Naukowe. Organizacja i Zarządzanie / Politechnika Śląska; 2020, 147; 327-350
1641-3466
Pojawia się w:
Zeszyty Naukowe. Organizacja i Zarządzanie / Politechnika Śląska
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Przykład wykorzystania narzędzi zarządzania jakością w doskonaleniu procesów utrzymania ruchu
Example of use of quality tools in the improvement of maintenance process
Autorzy:
Zasadzień, M.
Powiązania:
https://bibliotekanauki.pl/articles/112832.pdf
Data publikacji:
2016
Wydawca:
STE GROUP
Tematy:
5Why
organizacja pracy
czas pracy
utrzymanie ruchu
zarządzanie jakością
work organization
working time
maintenance
quality management
Opis:
Artykuł prezentuje wyniki badań obserwacyjnych, jakie przeprowadzono w jednym ze śląskich przedsiębiorstw produkcyjnych. Badania miały na celu doskonalenie procesu utrzymania ruchu, a skupiły się na analizie wykorzystania czasu pracy przez pracowników. Pomiarów dokonano dla trzech losowo wybranych osób. Zidentyfikowano najważniejsze czynności wykonywane przez pracowników oraz przyporządkowano je do czasu efektywnego – poświęcanego na codzienne obowiązki związane z utrzymywaniem w sprawności środków technicznych, pomocniczego – polegającego na czynnościach o charakterze przygotowawczym i administracyjnym oraz czasu nieefektywnego, w ramach którego pracownicy wykonywali czynności nie mające związku z wykonywaną pracą. Wśród czynności nieefektywnych i pomocniczych wyodrębniono te, których czas był najdłuższy. W celu zmniejszenia ich trwania wykorzystano metodę 5 Why. Dzięki niej rozpoznano przyczyny odpowiedzialne za występowanie zbyt długich czasów trwania czynności pomocniczych. W wyniku przeprowadzonej analizy zaproponowano działania korygujące mające na celu skrócenie czasu wykonywania tych czynności wraz z systemem ich oceny, co w konsekwencji powinno przyczynić się do poprawy efektywności pracy pracowników utrzymania ruchu.
The article presents the results of observational studies conducted in one of Silesian production companies. The research was aimed at improving the maintenance process and focused on the analysis of utilization of working time by the employees. The measurements were taken for three randomly chosen persons. The most important actions performed by the employees were identified and assigned to effective time – spent on everyday duties connected with maintaining the functionality of technical equipment, auxiliary time – dedicated to preparatory and administrative activities, and ineffective time, during which the employees performed actions not connected with their work. Among the ineffective and auxiliary actions those which took the longest were separated. In order to reduce their duration, the 5-Why method was used. It allowed us to identify the causes responsible for the overly long duration of auxiliary actions. As a result of the analysis conducted, corrective measures were proposed aimed at reducing the duration of those actions along with a system for their assessment, which should lead to an improvement in the efficiency of maintenance department employees.
Źródło:
Systemy Wspomagania w Inżynierii Produkcji; 2016, 4 (16); 180-187
2391-9361
Pojawia się w:
Systemy Wspomagania w Inżynierii Produkcji
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Selected methods and tools for analysing product nonconformity in the automotive industry
Wybrane metody i narzędzia analizy niezgodności wyrobów stosowane w przemyśle motoryzacyjnym
Autorzy:
Zasadzień, M.
Powiązania:
https://bibliotekanauki.pl/articles/112580.pdf
Data publikacji:
2015
Wydawca:
STE GROUP
Tematy:
quality
tools
7 Diamonds
management
nonconformity
automotive industry
5WHY
DDW
jakość
narzędzia
7 diamentów
zarządzanie
niezgodność
motoryzacja
Opis:
The study contains a review of seldom encountered quality management methods and tools which are applied in the automotive industry to solve problems related to nonconforming products. Three tools have been discussed: 5WHY, 7 Diamonds and Drill Deep and Wide. The tools differ from each other in terms of their complexity and the scope of application: from the simplest problems related to product quality to complex problems occurring in the production process. The scope of their application may refer to one product, the whole production process as well as to all processes in the corporation.
W opracowaniu przedstawiono przegląd rzadko spotykanych narzędzi i metod zarządzania jakością stosowanych w przemyśle motoryzacyjnym do rozwiązywania problemów z niezgodnymi wyrobami. Omówiono trzy narzędzia: 5WHY, 7 Diamentów oraz Wierć Głęboko i Szeroko. Narzędzia różnią się od siebie złożonością oraz zakresem stosowania: od najprostszych problemów z jakością wyrobów, do skomplikowanych problemów występujących w procesie pro-dukcyjnym. Zakres ich stosowania może odnosić się do jednego wyrobu, całego procesu produkcyj-nego, ale również do wszystkich procesów w całej korporacji.
Źródło:
Systemy Wspomagania w Inżynierii Produkcji; 2015, 1 (10); 150-159
2391-9361
Pojawia się w:
Systemy Wspomagania w Inżynierii Produkcji
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Applying the 5 Why method to verification of non-compliance causes established after application of the Ishikawa diagram in the process of improving the production of drive half-shafts
Autorzy:
Dziuba, S. T.
Jarossova, M. A.
Gołębiecka, N.
Powiązania:
https://bibliotekanauki.pl/articles/111877.pdf
Data publikacji:
2014
Wydawca:
Stowarzyszenie Menedżerów Jakości i Produkcji
Tematy:
5WHY
Ishikawa diagram
brainstorming
drive half-shafts
improvement
automotive sector
diagram Ishikawy
burza mózgów
półosie napędowe
poprawa
sektor motoryzacyjny
Opis:
The automotive industry is one of the most important branches of the global industry. For this purpose, products are produced by an extensive network of suppliers. They supply components directly to the (OEM - Original Equipment Manufacturer) or to the secondary market of parts. In recent years, the economic situation in these companies has dramatically deteriorated and it is associated with a decrease in new car sales. These companies are constantly making decisions to improve their production processes using various quality tools. These actions may help to increase their competitive advantage and thereby improve their financial situation. The surveyed company produces drive half-shafts for different types of cars. The studies were carried out to analyse the causes of non-compliance - falling band from the housing on the drive shaft. In order to identify and verify the causes for non-compliance and undertake corrective action following methods were used: Ishikawa diagram, 5WHY and brainstorming.
Źródło:
Production Engineering Archives; 2014, 2, 1; 16-19
2353-5156
2353-7779
Pojawia się w:
Production Engineering Archives
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-19 z 19

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies