Tytuł:
A study on loan repayment options for power plant construction: a case study of the Son La hydropower plant, Vietnam
Badanie możliwości spłaty kredytu na budowę elektrowni: studium przypadku elektrowni wodnej Son La w Wietnamie
Autorzy:
Tu, Le Tat
Phap, Vu Minh
Huong, Nguyen Thi Thu
Powiązania:
https://bibliotekanauki.pl/articles/27312536.pdf
Data publikacji:
2023
Wydawca:
Polska Akademia Nauk. Instytut Gospodarki Surowcami Mineralnymi i Energią PAN
Tematy:
economic effects
electric power system
hydropower plant
investment
NPV
IRR
efekt ekonomiczny
system elektroenergetyczny
elektrownia wodna
inwestycja
Opis:
Using loans is an effective solution for the investment and construction of energy works in general and power plants in particular, especially for developing countries. In economic and financial studies of the project investment preparation stage, the options of using capital and paying interest will be taken into account to minimize risks and increase the project’s ability to pay due debts. However, it is difficult to know which loan repayment option is the most beneficial for the project and when the risk is for the project in the context of debt repayment. The current economic and financial analysis of the project mainly focuses on determining the feasibility of the project through basic parameters, such as net present value (NPV), benefit – cost – ratio (B/C), internal rate of return (IRR), profitability index (PI) and payback period (PP). These parameters do not indicate the most difficult time to pay off the project’s loans. This paper analyzes two options for repayment of long-term loans in Vietnam using the case study of Son La hydropower plant to clarify the above difficult times and recommend a suitable repayment plan for the power project. The analytical method is used to actualize the cash flow of capital and interest during the construction and operation of the works. In Option 1, the debt is paid annually for interest and capital with a constant amount of money during the repayment period. In Option 2, the original dept without interest is paid with a constant amount of money during the repayment period, the interest (due to the remaining original capital) must be paid in the year when the interest is incurred. The study results show that the amount of the annual payment in option 1 is smaller than in Option 2 in the first four years (of ten years of debt repayment). Thus, capital and interest payment in Option 2 may be more detrimental than Option 1 in the first three years of debt repayment, and the amount of money from debt repayment is greater than the profit obtained from power generation. Thus, depending on the profit in the first years when the power plant comes into operation, the investor needs to decide on a reasonable way to repay the loan so that the project can self-finance.
Korzystanie z kredytów jest skutecznym rozwiązaniem dla inwestycji i budowy zakładów energetycznych w ogóle, a w szczególności elektrowni, zwłaszcza w krajach rozwijających się. W analizach ekonomiczno-finansowych etapu przygotowania inwestycji projektu uwzględnione zostaną możliwości wykorzystania kapitału i spłaty odsetek w celu zminimalizowania ryzyka i zwiększenia zdolności projektu do spłaty wymaganych długów. Trudno jednak stwierdzić, która opcja spłaty kredytu jest najkorzystniejsza dla projektu i kiedy występuje ryzyko dla projektu w kontekście spłaty zadłużenia. Bieżąca analiza ekonomiczno-finansowa projektu koncentruje się głównie na określeniu wykonalności projektu poprzez podstawowe parametry, takie jak wartość bieżąca netto (NPV), stosunek korzyści do kosztów (B/C), wewnętrzna stopa zwrotu (IRR), wskaźnik rentowności (PI) i okres zwrotu (PP). Parametry te nie wskazują na najtrudniejszy czas na spłatę kredytów projektu. W niniejszym artykule przeanalizowano dwie opcje spłaty kredytów długoterminowych w Wietnamie na przykładzie elektrowni wodnej Son La, uwzględniając obecne trudne warunki i zalecając odpowiedni plan spłaty dla projektu energetycznego. Metoda analityczna służy do aktualizacji przepływów pieniężnych kapitału i odsetek w trakcie budowy i eksploatacji obiektu. W Wariancie 1 dług jest spłacany corocznie na odsetki i kapitał stałą kwotą w okresie spłaty. W Wariancie 2 pierwotny dług bez odsetek spłacany jest stałą kwotą w okresie spłaty, odsetki (należne od pozostałego kapitału pierwotnego) muszą być zapłacone w roku, w którym naliczone zostały odsetki. Wyniki badań wskazują, że wysokość rocznej spłaty w Wariancie 1 jest mniejsza niż w Wariancie 2 w pierwszych czterech latach (z dziesięciu lat spłaty zadłużenia). Zatem spłata kapitału i odsetek w Wariancie 2 może być bardziej szkodliwa niż w Wariancie 1 w pierwszych trzech latach spłaty zadłużenia, a kwota pieniędzy ze spłaty zadłużenia jest większa niż zysk uzyskany z produkcji energii. Zatem w zależności od zysku w pierwszych latach od uruchomienia elektrowni, inwestor musi zdecydować, jak rozsądnie spłacić kredyt, aby projekt mógł się sam sfinansować.
Źródło:
Polityka Energetyczna; 2023, 26, 2; 121--140
1429-6675
Pojawia się w:
Polityka Energetyczna
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Effectiveness of a Mobile Application-Based Intervention to Improve Knowledge and Practice Regarding Silicosis Among High-Risk Workers of Dust Exposure in a Northern Province of Vietnam
Autorzy:
Nguyen, Thi Thu Huyen
Ta, Thi Kim Nhung
Pham, Thi Quan
Nguyen, Thanh Thao
Nguyen, Ngoc Anh
Nguyen, Thi Lien Huong
Le, Thi Huong
Luong, Mai Anh
Le, Thi Thanh Xuan
Powiązania:
https://bibliotekanauki.pl/articles/27323251.pdf
Data publikacji:
2023
Wydawca:
Polskie Towarzystwo Przeróbki Kopalin
Tematy:
knowledge
practice
workers
silicosis
mobile application
effectiveness
praca
aplikacja mobilna
Wietnam
Opis:
Objectives: to analyze changes in knowledge and practices regarding silicosis in groups of workers at high risk of silicosis before - after an intervention. Methods: The study was conducted from 2018 to 2019 based on structured questions related to knowledge and practices of silicosis of workers directly exposed to silica dust in a Northern province of Vietnam. The mobile app-based intervention was applied to steel workers, then compared with ironworkers in improvements in silicosis knowledge and practices. Results: Significant changes in the intervention group related to workers' knowledge about the signs suggestive of silicosis, disease consequences, measures to reduce the risk of silicosis, and participation in annual occupational disease examinations were reported. Conclusion: Mobile applicationbased interventions could improve silicosis knowledge and practice among workers at high risk of exposure to silica dust.
Źródło:
Inżynieria Mineralna; 2023, 2; 295--302
1640-4920
Pojawia się w:
Inżynieria Mineralna
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Comparison of the Resampling Methods for Gridded DEM Downscaling
Porównanie metod ponownego próbkowania dla skalowanego w dół zmniejszania DEM
Autorzy:
Nguyen, Quang Minh
Nguyen, Thi Thu Huong
La, Phu Hien
Duong, Thi Tuyet Nhung
Nguyen, Thi Minh Hong
Vu, Van Anh
Powiązania:
https://bibliotekanauki.pl/articles/318242.pdf
Data publikacji:
2019
Wydawca:
Polskie Towarzystwo Przeróbki Kopalin
Tematy:
próbkowanie
skalowanie
DEM
resampling
downscaling
Opis:
In this paper, a comparison and evaluation of three resampling methods for gridded DEM is implemented. The evaluation was based on the results of bilinear resampling, bi-cubic and Kriging resampling methods for an experiment using both degraded and sampled datasets at 20 m and 60 m spatial resolutions. The evaluation of the algorithms was accomplished comprehensively with visual and quantitative assessments. The visual assessment process was based on direct comparison of the same topographic features in different downscaled images, scatterplots and profiles. The quantitative assessment was based on the most commonly used parameters for DEM accuracy assessment such as root mean square errors (RMSEs), linear regression parameters m and b, and correlation coefficient R. Both visual and quantitative assessment revealed greater accuracy of the Kriging over the other two conventional methods.
Źródło:
Inżynieria Mineralna; 2019, 21, 2/2; 240-248
1640-4920
Pojawia się w:
Inżynieria Mineralna
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Assessment of Heavy Metal Pollution in the Surface Water of the Doi-Cho Dem-Ben Luc Rivers, Vietnam
Ocena zanieczyszczenia metalami ciężkimi wód powierzchniowych rzek Doi-Cho Dem-Ben Luc w Wietnamie
Autorzy:
Thieu, Van Vu Duc
Dinh, Thi Thu Huong
Nguyen, Thi Truc Thao
Nguyen, Thuy Lan Chi
Nguyen, Binh An
Pham, Anh-Duc
Powiązania:
https://bibliotekanauki.pl/articles/2172069.pdf
Data publikacji:
2022
Wydawca:
Polskie Towarzystwo Przeróbki Kopalin
Tematy:
heavy metal pollution
surface water
distribution
river
Doi-Cho Dem-Ben Luc
water quality protection
zanieczyszczenie metalami ciężkimi
wody powierzchniowe
dystrybucja
rzeki
ochrona jakości wód
Opis:
Heavy metals are a pressing concern in terms of their pollution in aquatic ecosystems because of their persistence, environmental toxicity, bioaccumulation. Aquatic environments receive heavy metals in untreated or inadequately treated wastewater from domestic, industrial, agricultural, and navigation sources. The Doi-Cho Dem-Ben Luc Rivers play the key roles of irrigation, navigation and ecological restoration. It is crucial to ascertain the pollution status, influencing factors, ecological risks, and possible sources of heavy metals in the surface water of the Doi-Cho Dem-Ben Luc Rivers. In this study, surface water from 7 sampling sites over was collected from the Doi-Cho Dem-Ben Luc Rivers, over 7 consecutive periods from April 2019 to October 2021. Each surface sample was analyzed for 9 heavy metals including Fe, Mn, Cr, Zn, Cu, Pb, Cd, Ni, As. The sampling technique and sample treatment were done based on the Standard Methods for the Examination of Water and Wastewater. The time and space variation of heavy metal concentrations were examined to test the analysis of variance (ANOVA) and correlation among all the parameters using R statistical software. The results suggest a spatial homogeneity of heavy metals in the surface water the studied rivers. Among all nine examined heavy metals in the studied area, the concentrations of Fe (1.00 ÷ 5.06 mg/L) and Mn (0.14 ÷ 0.28 mg/L) are the highest, and the concentrations of Cr, Cd and As are the lowest that lower limit of detection. The results suggested that the mean concentrations of Fe and Mn were above the acceptable limits of the National technical regulation on surface water quality (QCVN 08-MT: 2015/BTNMT). While the concentrations of Fe, Mn, Zn, Cu, Pb, Ni do not meet the Water quality criteria for aquatic life (United State Environmental Protection Agency). Anthropogenic activities can be the main source of heavy metals in in the surface water of the Doi-Cho Dem-Ben Luc Rivers. Among the heavy metals, a significant positive correlation was observed between Fe, Mn, Zn and Ni (0.64 ÷ 0.87), whereas Cu exhibited a significant positive correlation with Ni (0.51). While Cu and Pb showed a not too strong correlation with Fe, Mn, Zn and Ni (0.25 ÷ 0.48). The distribution of heavy metals may also be influenced by properties of heavy metals and fluctuations in water flows. The results provide guidance for controlling heavry metal pollution and protectting water sources in the Doi-Cho Dem-Ben Luc Rivers.
Metale ciężkie stanowią palący problem zanieczyszczenia w ekosystemach wodnych ze względu na ich trwałość, toksyczność dla środowiska i bioakumulację. Środowiska wodne sa zasilane w metale ciężkie z nieoczyszczonych lub nieodpowiednio oczyszczonych ścieków ze źródeł domowych, przemysłowych, rolniczych i żeglugowych. Rzeki Doi-Cho Dem-Ben Luc odgrywają kluczową rolę w nawadnianiu terenów, transporcie odnym i odbudowie ekologicznej. Kluczowe znaczenie ma ustalenie stanu zanieczyszczenia, czynników wpływających, zagrożeń ekologicznych i możliwych źródeł metali ciężkich w wodach powierzchniowych rzek Doi-Cho Dem-Ben Luc. W artykule przedstawiono wyniki badania wód powierzchniowych, próbki pobrano z 7 punktów pomiarowych z rzek Doi-Cho Dem-Ben Luc przez 7 kolejnych okresów od kwietnia 2019 r. do października 2021 r. Każda próbka została przeanalizowana pod kątem zawartości 9 metali ciężkich: Fe, Mn, Cr , Zn, Cu, Pb, Cd, Ni, As. Metodyka pobierania próbek i obróbki próbek zostały opracowane w oparciu o Standardowe Metody Badania Wód i Ścieków. Zbadano zmienność w czasie i przestrzeni stężeń metali ciężkich, do analizyy wyników wykorzystano analizę wariancji (ANOVA) i korelacji między wszystkimi parametrami przy użyciu oprogramowania statystycznego. Wyniki sugerują przestrzenną jednorodność zawartości metali ciężkich w wodach powierzchniowych badanych rzek. Spośród wszystkich dziewięciu badanych metali ciężkich w badanym terenie najwyższe są stężenia Fe (1,00 ÷ 5,06 mg/L) i Mn (0,14 ÷ 0,28 mg/L), a najniższe Cr, Cd i As (wartości odpowiadające dolnej granicy wykrywalności). Wyniki wskazują, że średnie stężenia Fe i Mn były powyżej dopuszczalnych limitów, opisanych w krajowych normach dotyczących jakości wód powierzchniowych (QCVN 08-MT: 2015/BTNMT). Natomiast stężenia Fe, Mn, Zn, Cu, Pb, Ni nie spełniają kryteriów jakości wody dla organizmów wodnych (Agencja Ochrony Środowiska Stanów Zjednoczonych). Działalność antropogeniczna może być głównym źródłem metali ciężkich w wodach powierzchniowych rzek Doi-Cho Dem-Ben Luc. Wśród metali ciężkich zaobserwowano istotną dodatnią korelację między zawartością Fe, Mn, Zn i Ni (0,64 ÷ 0,87), natomiast Cu wykazywała istotną dodatnią korelację z Ni (0,51). Zawartości Cu i Pb wykazywały niezbyt silną korelację z Fe, Mn, Zn i Ni (0,25 ÷ 0,48). Na rozmieszczenie metali ciężkich mogą mieć również wpływ właściwości metali ciężkich oraz wahania przepływów wody. Wyniki dostarczają wskazówek dotyczących kontrolowania zanieczyszczenia metalami ciężkimi i ochrony źródeł wody w rzekach Doi-Cho Dem-Ben Luc.
Źródło:
Inżynieria Mineralna; 2022, 2; 85--90
1640-4920
Pojawia się w:
Inżynieria Mineralna
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Genotype TNF-α(-308) and Silicosis on Factory Workers in Vietnam in 2020
Autorzy:
Nguyen, Viet
Nguyen, Thi Thu Huyen
Dao, Xuan Dat
Vu, Xuan Quy
Pham, Thi Quan
Le, Thi Kim Chung
Tran, Huy Thinh
Le, Thi Huong
Nguyen, Ngoc Anh
Nguyen, Viet Nhung
Nguyen, Ngoc Hong
Luong, Mai Anh
Le, Thi Thanh Xuan
Powiązania:
https://bibliotekanauki.pl/articles/2020235.pdf
Data publikacji:
2021
Wydawca:
Polskie Towarzystwo Przeróbki Kopalin
Tematy:
silicosis
genotype
TNF-α
Vietnam
Wietnam
genotyp
Opis:
The studFigy aims to determine the TNF-α single-nucleotide polymorphism TNF-α (-308) and assess the association of TNF-a(-308) SNP with the risk of silicosis among workers directly exposed to silica dust in Vietnam. A study was undertaken among 78 cases with silicosis and 103 controls without silicosis in Vietnam. Blood samples were collected for genomic DNA extraction from each subject. The phenotyping of TNF-α(-308) was performed using polymerase chain reaction‐based restriction fragment length polymorphism (PCR‐RFLP) and dye termination sequencing. Results: The average exposure time of the case group was slightly higher than that of the control group (12.46 ± 6.732 years vs. 12.09 ± 7.854 years). The majority of genotypes in both silicosis and non-silicosis was GG. When analyzing the concentration of TNF-α in the study participants' blood, it is shown that the average concentration of TNFα in the case group was higher than that in the control group. The genotype AG in the case group was 1.368 times higher than that in the control group. The percentage of all A alleles in the case group with silicosis was 1.342 times higher than the control group without the disease, similar to previous studies. Conclusion: The majority of genotypes in both groups was GG. The average concentration of TNF-α in blood, genotype AG, and the percentage of all A alleles in the case group was higher than that in the control group.
Źródło:
Inżynieria Mineralna; 2021, 2; 459--466
1640-4920
Pojawia się w:
Inżynieria Mineralna
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Establishing the Vertical Movement Map of Cuu Long Delta River by GNSS Data
Autorzy:
Nguyen, Gia Trong
Nguyen, Viet Nghia
Ly, Lam Ha
Vu, Trung Dung
Nguyen, Quoc Long
Kim, Thi Thu Huong
Pham, Ngoc Quang
Nguyen, Viet Quan
Powiązania:
https://bibliotekanauki.pl/articles/27323240.pdf
Data publikacji:
2023
Wydawca:
Polskie Towarzystwo Przeróbki Kopalin
Tematy:
land subsidence
GNSS
vertical crustal deformation
Mekong delta
deformacje
delta Mekongu
Opis:
Mekong Delta is an area with an important position in the socio-economic development of Vietnam. However, due to the impact of climate change as well as of the construction of hydroelectric dams in the upstream of the Mekong River in recent years, saline intrusion and flooding have been occurred because of high tide. According to published researches, the Mekong Delta is being experienced surface subsidence with a rate of up to centimeters per year, that exacerbates the impact of saline intrusion and flooding. Thus, studying to establish the surface subsidence map is an urgent need in this site. There are many of technologies to create the vertical movement map such as: Levelling, INSAR, GNSS, etc. Up to now, there are no scientific reports on the application of GNSS to monitor the vertical movement in this area. In this paper, the authors have calculated the largest vertical displacement velocity up to 3cm/year based on processing GNSS observations of nearly 20 GNSS monitoring station in the area using Bernese software. From these results, the research team has made the vertical movement map of Mekong, Vietnam.
Źródło:
Inżynieria Mineralna; 2023, 2; 173--177
1640-4920
Pojawia się w:
Inżynieria Mineralna
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Strategy in Dispatching Trucks and Shovels with Different Capacity to Increase the Operating Efficiency in Cao Son Surface Coal Mine, Vietnam
Autorzy:
Pham, Van Hoa
Tran, Trung Chuyen
Le, Hong Anh
Le, Thi Thu Hoa
Pham, Van Viet
Nguyen, Anh Tuan
Le, Thi Huong Giang
Powiązania:
https://bibliotekanauki.pl/articles/2020238.pdf
Data publikacji:
2021
Wydawca:
Polskie Towarzystwo Przeróbki Kopalin
Tematy:
truck dispatching
truck-shovel system
dispatching strategy
detailed match factor
górnictwo odkrywkowe
Wietnam
strategia
Opis:
In surface mining operations, the operating costs of truck-shovel system constitutes 50-60% of the total. Only a little save in the operation costs in this system will bring large profit for the mines. Due to many investment periods, the capacity of both trucks and shovels in Cao Son surface coal mine is different. This leads to the low efficiency and the difficulty in dispatching strategy for the mine. This paper presents the current situation and selection of advanced dispatching strategy for increasing the efficiency trucks and shovels at this surface coal mine. The results show the detailed match factor reflects the state of each team of loader and trucks and should be use as the indicator for dispatching decision for the heterogeneous truck and shovel fleet at Cao Son surface coal mine.
Źródło:
Inżynieria Mineralna; 2021, 2; 487--494
1640-4920
Pojawia się w:
Inżynieria Mineralna
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-7 z 7

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies