Tytuł:
Environmentally friendly replacement of mature 200 MW coal-fired power blocks with 2 boilers working on one 500 MW class Steam Turbine Generator (2on1 unit concept)
Autorzy:
Grzeszczak, J.
Grela, Ł.
Achter, T.
Powiązania:
https://bibliotekanauki.pl/articles/240337.pdf
Data publikacji:
2017
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
coal fired power plant
flexibility increasing
old units replacement
elektrownia opalana węglem
zwiększanie elastyczności
wymiana starych jednostek
Opis:
The paper covers problems of the owners of a fleet of long-operated conventional power plants that are going to be decommissioned soon in result of failing to achieve new admissible emissions levels or exceeding pressure elements design lifetime. Energoprojekt-Katowice SA, Siemens AG and Rafako SA presents their joint concept of the solution which is a 2on1 concept – replacing two unit by two ultra-supercritical boilers feeding one turbine. Polish market has been taken as an example.
Źródło:
Archives of Thermodynamics; 2017, 38, 4; 165--190
1231-0956
2083-6023
Pojawia się w:
Archives of Thermodynamics
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Improving flexibility characteristics of 200 MW unit
Autorzy:
Taler, J.
Trojan, M.
Taler, D.
Dzierwa, P.
Kaczmarski, K.
Powiązania:
https://bibliotekanauki.pl/articles/239919.pdf
Data publikacji:
2017
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
thermal power unit
flexibility increasing
steam boiler
rapid start-up
elektrownia cieplna
elastyczność
kocioł parowy
szybkie uruchamianie
Opis:
Calculations were performed of the thermal system of a power plant with installed water pressure tanks. The maximum rise in the block electric power resulting from the shut-off of low-pressure regenerative heaters is determined. At that time, the boiler is fed with hot water from water pressure tanks acting as heat accumulators. Accumulation of hot water in water tanks is also proposed in the periods of the power unit small load. In order to lower the plant electric power in the off-peak night hours, water heated in low-pressure regenerative heaters and feed water tank to the nominal temperature is directed to water pressure tanks. The water accumulated during the night is used to feed the boiler during the period of peak demand for electricity. Drops in the power block electric power were determined for different capacities of the tanks and periods when they are charged. A financial and economic profitability analysis (of costs and benefits) is made of the use of tanks for a 200 MW power unit. Operating in the automatic system of frequency and power control, the tanks may also be used to ensure a sudden increase in the electric power of the unit. The results of the performed calculations and analyses indicate that installation of water pressure tanks is well justified. The investment is profitable. Water pressure tanks may not only be used to reduce the power unit power during the off-peak night hours and raise it in the periods of peak demand, but also to increase the power capacity fast at any time. They may also be used to fill the boiler evaporator with hot water during the power unit start-up from the cold state.
Źródło:
Archives of Thermodynamics; 2017, 38, 1; 75-90
1231-0956
2083-6023
Pojawia się w:
Archives of Thermodynamics
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-2 z 2

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies