Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Wyszukujesz frazę "zapora" wg kryterium: Temat


Tytuł:
Measuring system for monitoring of concrete dam deformations
Autorzy:
Bryś, H.
Mirek, G.
Powiązania:
https://bibliotekanauki.pl/articles/224422.pdf
Data publikacji:
2007
Wydawca:
Politechnika Warszawska. Wydział Geodezji i Kartografii
Tematy:
zapora
zapora betonowa
deformacja zapory
pomiary geodezyjne
dam
concrete dam
concrete dam deformation
engineering surveying
Źródło:
Reports on Geodesy; 2007, z. 1/82; 39-45
0867-3179
Pojawia się w:
Reports on Geodesy
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Interconnection between monitoring and deterministic modeling of the behavior of large earth dams
Autorzy:
Szostak-Chrzanowski, A.
Massiera, M.
Chrzanowski, A.
Powiązania:
https://bibliotekanauki.pl/articles/225009.pdf
Data publikacji:
2007
Wydawca:
Politechnika Warszawska. Wydział Geodezji i Kartografii
Tematy:
zapora ziemna
zapora narzutowa
monitoring przemieszczeń
pomiary geodezyjne
earth dam
fockfill dam
monitoring of displacements
engineering surveying
Opis:
Monitoring of deformations, whether using geodetic or geotechnical instrumentation, besides providing a warning system in case of an abnormal behaviour of the dam, may be used as a tool for a verification of design parameters. By comparing results of monitoring measurements with a deterministic (a-priori) model of deformation, one may determine and explain causes of deformation in a case of unexpected behaviour of the investigated object and its surrounding. Thus, the role of monitoring becomes much broader than just the conventional determination of the status of the deformable object. On the other hand, a predicted behaviour of the dam may be used in designing the monitoring scheme, giving information on the magnitude and location of the expected maximum deformation parameters. In addition, with properly designed monitoring surveys, one may also determine the actual deformation mechanism. The discussed problems are illustrated by three types of earth dams located in California, USA, and in Quebec, Canada.
Źródło:
Reports on Geodesy; 2007, z. 1/82; 345-351
0867-3179
Pojawia się w:
Reports on Geodesy
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Investigation of possibilities to use fern modelling in the process of modernisation of control networks for concrete dams
Autorzy:
Zaczek-Peplinska, J.
Popielski, P.
Powiązania:
https://bibliotekanauki.pl/articles/225021.pdf
Data publikacji:
2007
Wydawca:
Politechnika Warszawska. Wydział Geodezji i Kartografii
Tematy:
zapora
zapora betonowa
metoda elementów skończonych
FEM
pomiary geodezyjne
dam
concrete dam
finite elements method
engineering surveying
Opis:
The paper presents analysis of possibilities to utilise results of modelling the work of concrete dam construction elements, obtained by means of the finite elements method (FEM), for the needs of modernisation of a control network. Such analysis should answer the question, whether - basing on the results of modelling with the use of currently controlled points of the object, as the network nodes, and pointing to zones (locations) of threats - it will be possible to formulate recommendations concerning the improvement of a set of controlled points and to perform related modifications of the existing control network.
Źródło:
Reports on Geodesy; 2007, z. 1/82; 417-423
0867-3179
Pojawia się w:
Reports on Geodesy
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Evaluation of potential dam break flood risks of the cascade dams Mexa and Bougous (El Taref, Algeria)
Ocena ryzyka potencjalnego przerwania tamy w kaskadzie zapór Mexa i Bougous (El Taref, Algieria)
Autorzy:
Bouchehed, H.
Mihoubi, M. K.
Derdous, O.
Djemili, L.
Powiązania:
https://bibliotekanauki.pl/articles/292478.pdf
Data publikacji:
2017
Wydawca:
Instytut Technologiczno-Przyrodniczy
Tematy:
Bougous dam
dam break
flood wave
GIS
Mexa dam
numerical simulation
Telemac-2D
fala powodziowa
przerwanie tamy
symulacja numeryczna
zapora Bougous
zapora Mexa
Opis:
The implementation of Bougous dam at 5 km upstream of Mexa dam permits to compensate the storage capacity and to reduce sediment yields in the later, however, these advantages must be associated to the fact that the presence of two large dams in the region poses in case of a dam break event a potential threat to human life and property. Indeed, in this study a numerical simulation of the dam break wave propagation resulting from the failure of the two dams was performed using the two-dimensional hydrodynamic model Telemac-2D, in order to estimate the impacts on constructions located in the downstream valley. The simulation results exported to GIS platform allowed the elaboration of cartographic materials depicting the hydraulic characteristics of the flood wave and its arrival times at key locations, which constitute very useful information for the authorities to avoid significant loss in case of the failure of Bougous and Mexa dams.
Uruchomienie zapory Bougous 5 km powyżej zapory Mexa zwiększyło zdolności retencyjnej i ograniczyło sedymentację w drugim zbiorniku. Tym korzyściom towarzyszy jednak ryzyko wynikające z funkcjonowania w regionie dwóch dużych zapór, których przerwanie może być zagrożeniem ludzkiego życia i dóbr materialnych. W pracy przeprowadzono symulację numeryczną propagacji fali powstałej w wyniku przerwania obu tam z zastosowaniem dwuwymiarowego modelu hydrodynamicznego Telemac-2D w celu oceny wpływu katastrofy na budowle usytuowane poniżej w dolinie rzeki. Wyniki symulacji przeniesione do GIS pozwoliły opracować materiały kartograficzne ilustrujące charakterystyki hydrauliczne fali powodziowej i czasy jej dopływu do kluczowych lokalizacji. Stanowi to bardzo użyteczną informację dla władz, umożliwiającą uniknięcie znacznych strat w przypadku awarii tam Bougous i Mexa.
Źródło:
Journal of Water and Land Development; 2017, 33; 39-45
1429-7426
2083-4535
Pojawia się w:
Journal of Water and Land Development
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Spatial distribution of manganese and iron in sediments of the Czorsztyn Reservoir
Autorzy:
Czaplicka, A.
Bazan, S.
Szarek-Gwiazda, E.
Ślusarczyk, Z.
Powiązania:
https://bibliotekanauki.pl/articles/208074.pdf
Data publikacji:
2016
Wydawca:
Politechnika Wrocławska. Oficyna Wydawnicza Politechniki Wrocławskiej
Tematy:
dam water
metal pollution
Czorsztyn
zapora wodna
zanieczyszczenie metalami
żelazo
mangan
Opis:
Concentrations of iron and manganese were investigated in 26 sediment samples from the Czorsztyn Reservoir (South Poland). Spatial distribution of these metals in the reservoir is generally linked to the grain size distribution of sediments. The presence of manganese and iron in sediments is mainly related to the rock weathering and soil erosion processes. Furthermore, enrichment of waters in manganese and iron follows as a result of the Dunajec River flowing through the Orawsko-Nowotarska Valley, where peat bogs are present. However, anthropogenic influence on manganese and iron concentration levels in sediments cannot be excluded in this area.
Źródło:
Environment Protection Engineering; 2016, 42, 4; 179-188
0324-8828
Pojawia się w:
Environment Protection Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Study of the influence of temperature and water level of the reservoir about the displacement of a concrete dam
Autorzy:
Oro, S. R.
Mafioleti, T. R.
Chaves Neto, A.
Garcia, S. R. P.
Neumann, C.
Powiązania:
https://bibliotekanauki.pl/articles/264428.pdf
Data publikacji:
2016
Wydawca:
Uniwersytet Zielonogórski. Oficyna Wydawnicza
Tematy:
zapora betonowa
analiza wieloczynnikowa
monitorowanie strukturalne
structural monitoring
concrete dam
multivariate analysis
Opis:
Multivariate techniques are used in this study to analyze the monitoring data displacements of a concrete dam, measured by means of pendulums, extensometer bases and multiple rod extensometers, taking into account the action of environmental conditions, bounded by the surface temperature of the concrete at ambient temperature and the tank water level. The canonical correlation analysis is used to evaluate the influence of environmental variables in the displacement of structures and dam foundations. The factor analysis is used to identify data sources of variability and order the sensors according to the action of factors. The dates of the measurements are grouped according to similarities in the present observations, by applying the cluster analysis. Then the discriminant analysis is used to assess the groups as to their homogeneity. The results demonstrate that the techniques used for distinguishing the dam responses and identify the effects of changes in environmental conditions on the displacements of the structures and dam foundations.
Źródło:
International Journal of Applied Mechanics and Engineering; 2016, 21, 1; 107-120
1734-4492
2353-9003
Pojawia się w:
International Journal of Applied Mechanics and Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The capacity of the Sanna river in conditions of the reliable flow and the control discharges of the weir in Zaklików
Autorzy:
Michalec, Bogusław
Powiązania:
https://bibliotekanauki.pl/articles/1429706.pdf
Data publikacji:
2021
Wydawca:
Uniwersytet Rolniczy im. Hugona Kołłątaja w Krakowie
Tematy:
reliable flow
control flow
capacity
damming
inundation
przepływ kontrolny
wydajność
zapora
zalewanie
Opis:
The aim of the study was to determine the capacity of a selected section of the Sanna river, designated below the lower site of the weir in Zaklików. The capacity calculations included the conditions of flood water discharge, i.e. the reliable flow and the control flow, determined in accordance with the Regulation of the Minister of the Environment on technical conditions that should be ensured for the hydrotechnical structures and their locations. The paper presents the consequences of changes in the regulations regarding the determination of building type, for which reliable flow and control discharges are determined. These modifications in the regulations have an impact on changes in the determination of the probability value for water discharges related to the analysed weir. The calculation of the capacity of the tested section also took into account its technical condition, specifying the variant of calculations for the lack of maintenance works, i.e. for the current state and for the state after maintenance works, consisting in mowing vegetation on slopes and shaping the surface of river bottom, removing pits and shallows. The results of the calculations of capacity of the measured cross-sections showed that the performance of maintenance works will convey the flow of a Q3% reliable flow in the Sanna river, while the Q1% control flow will not fit into the riverbed and will cause inundation of the adjacent areas.
Źródło:
Geomatics, Landmanagement and Landscape; 2021, 1; 57-68
2300-1496
Pojawia się w:
Geomatics, Landmanagement and Landscape
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The prognosis of influence of the Oder River waters dammed by Malczyce barrage on left bank areas
Prognoza wpływu piętrzenia wód Odry stopniem wodnym Malczyce na tereny lewobrzeżne
Autorzy:
Chalfen, M.
Łyczko, W.
Pływaczyk, L.
Powiązania:
https://bibliotekanauki.pl/articles/292599.pdf
Data publikacji:
2014
Wydawca:
Instytut Technologiczno-Przyrodniczy
Tematy:
barrage
drainage
groundwater
mathematical model
valley
dolina
drenaż
model matematyczny
wody gruntowe
zapora
Opis:
The finalisation of the construction of the Malczyce barrage is planned for 2015. Damming of the river will cause a change in the water and ground conditions in the adjoining areas. The paper analyses the influence of the water level in the Oder River dammed by the barrage on groundwater table level in the left bank valley. A model which allows the prediction of groundwater levels depending on the assumed water level in the Oder was constructed. The analysis was conducted for three different variants: for the initial stage before damming the Oder River and for the conditions after damming the water up with and without the drainage devices included in the project. The calculations were done in several chosen transects across the river valley. The mathematical model of flow in the aquifer based on the Richards equation was applied. The results of calculations were presented as the spatial distribution of piezometric pressures which were used to determine the groundwater table for each of the transects. The calculation results from the vertical models were transposed into a horizontal model. The comparison of appropriate results allowed to positively verify the designed model and to analyse the effectiveness of the realised project solutions.
Zakończenie budowy stopnia wodnego Malczyce jest planowane na rok 2015. Spiętrzenie rzeki wpłynie na zmianę dotychczasowych warunków gruntowo-wodnych na terenie przyległym. Przedmiotem pracy jest analiza wpływu poziomu wód Odry spiętrzonych tym stopniem na poziomy wód gruntowych na terenie lewobrzeżnej doliny. Opracowany został model matematyczny, który umożliwia symulację poziomów wody gruntowej w lewobrzeżnej dolinie w zależności od przyjętego poziomu wody w Odrze. Analiza została przeprowadzona w trzech różnych wariantach: stan przed piętrzeniem wody w Odrze oraz po spiętrzeniu z uwzględnieniem i bez uwzględnienia urządzeń odwadniających przewidzianych w projekcie. Obliczenia symulacyjne przeprowadzono w kilkunastu wytypowanych przekrojach pionowych przez dolinę. Zastosowano model matematyczny przepływu bazujący na równaniu Richardsa. Jako wyniki obliczeń uzyskano przestrzenny rozkład ciśnień piezometrycznych, które posłużyły do wyznaczenia w każdym przekroju pionowym linii zwierciadła wód gruntowych. Uzyskane wyniki obliczeń z modeli pionowych na drodze interpolacji zostały przetransponowane na model horyzontalny. Porównanie wyników obliczeń w wariancie przed piętrzeniem z mapami hydroizohips wykreślonymi na podstawie obserwacji terenowych dało podstawę do pozytywnej weryfikacji opracowanego modelu. Wykonane obliczenia umożliwiły przeanalizowanie skuteczności przyjętych do realizacji rozwiązań projektowych.
Źródło:
Journal of Water and Land Development; 2014, 21; 19-27
1429-7426
2083-4535
Pojawia się w:
Journal of Water and Land Development
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Control network analysis of the dam "Wióry"
Autorzy:
Walo, J.
Szpunar, R.
Woźniak, M.
Powiązania:
https://bibliotekanauki.pl/articles/225005.pdf
Data publikacji:
2007
Wydawca:
Politechnika Warszawska. Wydział Geodezji i Kartografii
Tematy:
zapora ziemna
sieć kontrolna
Wióry
pomiary geodezyjne
earth dam
control network
engineering surveying
Opis:
The obtained results of the test measurements in the control network of the dam Wióry show that combined usage of length measurements and GPS observations enables to obtain high accuracy and reliability in defining point coordinates. The real determination accuracy of checkpoint displacements in this type of networks is at the level of (plus minus) 2-3mm. However, it should be added that in small networks covering an area up to 1 km in radius, classical measurements (most of all, length measurements) enable to obtain higher accuracies in determining point coordinates, obviously on condition that the net structure is well-designed and length measurement is possible. Having analyzed the obtained results, one can also formulate the following conclusions: - the assumed structure of a modified test network shows effective accuracy both for EDM measurements and GPS observations, - satellite measurements enable combined and direct observation of points between which there is no sight line. It is especially important in the case of reference points which are usually located around the monitored object, and it is rarely possible to link them by means of classical measurements; - GPS measurements make it possible to check the monitored network independently, at least limiting the incidence of major and systematic errors in processing the results and defining displacement values; so GPS observations may, in the case of small control networks, be treated as control measurements made periodically (e.g. every year); - accuracy assessment made for TDA5005 tachymeter observations even in the case of considerable target inclinations, made by means of standard reflectors, attested reflexive foil and CCR fulfills monitoring requirements of specific point (targets), enabling to obtain an accuracy of the (plus minus) 0.5 mm range in relation to reference points; - linear measurements in the test network of Wiory, made by means of a TDA5005 tachymeter and high precision reflectors can be accomplished within 2-3 days.
Źródło:
Reports on Geodesy; 2007, z. 1/82; 376-380
0867-3179
Pojawia się w:
Reports on Geodesy
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Impact of flow and damming on water quality of the mountain Raba River (southern Poland) : long-term studies
Wpływ przepływu i piętrzenia na jakość wody górskiej rzeki Raby (południowa Polska) : badania wieloletnie
Autorzy:
Szarek-Gwiazda, Ewa
Gwiazda, Robert
Powiązania:
https://bibliotekanauki.pl/articles/2173790.pdf
Data publikacji:
2022
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
flow
physicochemical parameter
Carpathian river
impact of dam
przepływy
parametry fizykochemiczne
Raba
zapora
Opis:
Climate change, manifested by long term periods of drought to heavy rainfall, may remarkably modify river flow regimes. We hypothesize that flow prevailing in a given year determines water chemistry of the Carpathian Raba River above and below Dobczyce Reservoir (southern Poland), used for drinking purposes. Based on the mean annual river flow for years 1991-2017, hydrologically dry (HD), hydrologically average (HA) and hydrologically wet (HW) years were distinguished. We found significant differences in the values of most studied physicochemical parameters of river water above and below the reservoir between studied hydrological years (for a period of April‒November). In HD years, the water above the dam had significantly higher temperature and values of conductivity (point pollution source, groundwater inflow), while lower ones of nutrients NO3- and P-tot (diffuse pollution) compared to those in HA and/or HW years. The best GLM models for mean monthly flows above and below the dam include 3-5 factors among which conductivity and NO3 concentration were always present. The reservoir in different ways influences the water chemistry below the dam in HD, HA and HW years. The impact of flow on the water quality in hydrologically varied years is discussed. The obtained results are important for appropriate management in catchment basins of mountain rivers and the protection of dam reservoirs against the eutrophication processes in changing climate and flow regime.
Zmiany klimatu, przejawiające się długotrwałymi okresami suszy lub obfitych opadów, mogą znacząco zmienić roczny reżim przepływów. Stawiamy hipotezę, że przepływ dominujący w danym roku determinuje chemizm wody rzeki górskiej. Celem pracy było określenie (1) różnic w chemizmie wody górskiej rzeki pomiędzy latami hydrologicznie suchymi (HD), przeciętnymi (HA) i mokrymi (HW), (2) wpływu zbiornika zaporowego na chemię wody odpływającej rzeki w różnych latach hydrologicznych, (3) parametrów fizyczno-chemicznych związanych ze średnim miesięcznym przepływem wody w latach HD, HA i HW. Badania prowadzono w karpackiej rzece Rabie powyżej i poniżej Zbiornika Dobczyckiego w południowej Polsce. W oparciu o średni roczny przepływ rzeki z wielolecia 1991–2017 wyróżniono lata HD, HA i HW. Przeanalizowano zmiany parametrów fizyczno- chemicznych wody (temperatura, przewodność elektrolityczna, pH, tlen rozpuszczony, nasycenie tlenem, BZT5, biogeny: NO3-, NH4+, P-tot) pobieranych co miesiąc w okresie kwiecień–listopad. Stwierdziliśmy istotne różnice w chemizmie wody rzeki między badanymi latami hydrologicznymi. W latach HD wody powyżej zbiornika miały istotnie wyższą temperaturę i wartości przewodności elektrolitycznej, natomiast niższe wartości biogenów NO3- i P-tot (zanieczyszczenie obszarowe) w porównaniu do lat HA i/lub HW. Zbiornik w różny sposób kształtował skład chemiczny wody rzeki poniżej zapory w latach HD, HA i HW. Najlepsze modele GLM dla średnich miesięcznych przepływów obejmowały 3–5 czynników, wśród których zawsze występowały przewodność elektrolityczna i stężenia NO3-. Uzyskane wyniki mają istotne znaczenie dla właściwego gospodarowania w zlewniach rzek górskich i ochrony zbiorników zaporowych przed procesami eutrofizacji.
Źródło:
Archives of Environmental Protection; 2022, 48, 1; 31--40
2083-4772
2083-4810
Pojawia się w:
Archives of Environmental Protection
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Synthesis of zeolite A using the waste of iron mine tailings dam and its application for industrial effluent treatment
Autorzy:
Izidoro, Juliana de Carvalho
Kim, Michelle Caroline
Bellelli, Valentina Ferraraccio
Pane, Mara Cristina
Botelho Junior, Amilton Barbosa
Espinosa, Denise Crocce Romano
Tenório, Jorge Alberto Soares
Powiązania:
https://bibliotekanauki.pl/articles/1839010.pdf
Data publikacji:
2019
Wydawca:
Główny Instytut Górnictwa
Tematy:
Fundao dam
Brumadinho
mining tailings
Mariana
ion exchange
zapora Fundao
odpady wydobywcze
wymiana jonowa
Opis:
In November 2015, a dam from iron mining collapsed, which is considered as the largest environmental accident in Brazil. Over than 50 million m³ were released reaching the Doce River and killed 20 people in Mariana. The literature review shows that the mining tailings can be used as raw material to the synthesis of zeolites, which can be used for the wastewater treatment. The aim of this work was the synthesis of zeolites from the Samarco tailings and its application for the treatment of electroplating effluent. The residue was characterized which identified high-iron content for the synthesis of zeolites. The residue was mixed with NaOH (1:1) and the reaction temperature was evaluated from 350 °C to 650 °C. Then, the material was mixed with aluminum source and the effect of time was evaluated. The zeolite was applied to the wastewater treatment from electroplating industry. Results showed that the synthesis of zeolite A was carried out with a fusion step at 450 °C for 1 h using RAS: NaOH ratio 1:1, and further hydrothermal treatment at 100 °C during 4 h. The zinc removal from the wastewater was up to 98% using 50 mL of the solution, 2.5 g zeolite A, 60min and pH 6.4. The main metals presented in the solution were adsorbed up to 90% by the zeolite synthesized. Zinc adsorption by the zeolite fitted better on Langmuir isotherm. The zeolite was used four times in a row and zinc removal declined 98-68%.
Źródło:
Journal of Sustainable Mining; 2019, 18, 4; 277-286
2300-1364
2300-3960
Pojawia się w:
Journal of Sustainable Mining
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Impact of sediment transport of the Chellif River on silting of the Boughezoul reservoir (Algeria)
Wpływ transportu rumowiska w rzece Chellif na zamulenie zbiornika Boughezoul (Algieria)
Autorzy:
Remini, B.
Bensafia, D.
Nasroun, T.
Powiązania:
https://bibliotekanauki.pl/articles/947229.pdf
Data publikacji:
2015
Wydawca:
Instytut Technologiczno-Przyrodniczy
Tematy:
Boughezoul dam
Oued Chellif
sediment transport
siltation
transport osadów
ued Chellif
zamulanie
zapora Boughezoul
Opis:
In this article, we discussed the effect of sediment transport in the Chellif catchment on the silting of Boughezoul reservoir. Since 1934, when the impoundment of the dam, nine bathymetric surveys were carried out by hydraulic services. Based on the last two bathymetric surveys (1986 and 2005), we assessed the average annual rate of silting 0.67 million m3·year–1. Is a filling rate of 70% of the total capacity of the reservoir in 2011. Storage capacity has decreased from 55 million m3 in 1934 to 15 million m3 in 2011. Concentrations exceeding 300 g·l–1, recorded in the river upstream of Boughezoul reservoir, caused formation of density currents.
W artykule opisano wpływ transportu rumowiska w rzece Chellif na zamulanie zbiornika Boughzoul. Badania były prowadzone w okresie eksploatacji zapory przez Narodową Agencję Zapór. Na podstawie danych na temat transportu osadów uedu Chellif uzyskanych w badaniach batymetrycznych z lat 1986 i 2005 prowadzonych powyżej zapory oceniono średnią roczną stopę zamulenia na 0.67 mln m3·rok–1. Ilość osadów zakumulowanych w zbiorniku oceniono na ponad 70% całkowitej pojemności. Pojemność ta zmniejszyła się z 55 mln m3 wody w roku 1934 do 15 mln m3 w 2011 r. Stało się tak z powodu stężenia zawiesin powyżej 300 g·l–1 notowanego w rzece powyżej zbiornika Boughzoul.
Źródło:
Journal of Water and Land Development; 2015, 24; 35-40
1429-7426
2083-4535
Pojawia się w:
Journal of Water and Land Development
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Development of the debris flow control elastic barrage design methodology
Autorzy:
Gavardashvili, Givi
Kukhalashvili, Edward
Iremashvili, Inga
Kupreishvili, Shorena
Gavardashvili, Natia
Maisaia, Lia
Dadiani, Kate
Powiązania:
https://bibliotekanauki.pl/articles/2065626.pdf
Data publikacji:
2020
Wydawca:
Politechnika Częstochowska
Tematy:
debrisflow reliability
risk
design
debris flow elastic barrage
niezawodność przepływu zanieczyszczeń
ryzyko
projekt
zapora elastyczna
Opis:
In this paper, we present the debris flow regulatory barrages innovative construction specifications. By evaluating the dynamic nature of debris flows we determine the methodology of building debris flow regulating constructions and specific elements in said constructs. By taking in mind the river bed and its topographical parameters, we determine debris flow regulatory elastic barrages geometrical size and we mapped out its designs specific example. By assessing the maximum discharge of the debris flow, we determine its, dynamical, influence metrics, which in practice helps us assess the constructions reliability and risks of it being rendered unusable by the aforementioned factors.
Źródło:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym; 2020, 9, 2; 135--145
2299-8535
2544-963X
Pojawia się w:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Private solutions to design an innovative engineering structure for efficient debris flow control
Autorzy:
Gavardashvili, Givi
Kukhalashvili, Eduard
Iremashvili, Inga
Powiązania:
https://bibliotekanauki.pl/articles/31342630.pdf
Data publikacji:
2022
Wydawca:
Politechnika Częstochowska
Tematy:
prismatic channels
debris flow
elastic barrage
structure
designing
kanały pryzmatyczne
przepływ gruzu
elastyczna zapora
struktura
projektowanie
Opis:
There are hardly any sections in a debris flow channel, where flow movement, except for exceptions, would have a constant hydraulic regime and typical parameters. Therefore, in order to select regulating measures, the urgent means of assessment of the flow regime to totally cover its anomaly is needed. The solution of this question is associated with the full compatibility of laws with soil mechanics and hydraulics. Recently, the engineering problems related to debris flow, based on various considerations, have been realized by integrating the obtained differential equations. Especially important are the possibilities of a debris flow moving regime in prismatic beds described by the system of differential equations of various modifications. If rheological properties are neglected in the above equations, they are completely transformed into differential equations of non-uniform motion of Newtonian fluids. By considering the above-mentioned, the paper gives the calculation methods and practical example of designing an innovative debris flow control barrage, which was realized in the bed of the Mletis Khevi river gorge.
Źródło:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym; 2022, 11; 171-180
2299-8535
2544-963X
Pojawia się w:
Budownictwo o Zoptymalizowanym Potencjale Energetycznym
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Surface water leakage, sedimentation and evaporation in arid regions: A case study of the Gargar dam, Algeria
Przecieki wody, sedymentacja i parowanie w suchych regionach: przypadek zapory Gargar w Algierii
Autorzy:
Hassen, B.
Abid, O.
Powiązania:
https://bibliotekanauki.pl/articles/292474.pdf
Data publikacji:
2017
Wydawca:
Instytut Technologiczno-Przyrodniczy
Tematy:
arid zones
evaporation
Gargar dam
leakage
sedimentation
parowanie
przecieki wody
sedymentacja
strefy suchego klimatu
zapora Gargar
Opis:
This study was carried out in order to assess the total capacity loss in Gargar dam, third-largest in Algeria, due to the mudding of the reservoir, intense evaporation and water leaks. We analysed the variation in leakage as a function of the reservoir level, and quantify losses due to leaks, sedimentation and evaporation. We relied on site visits and data obtained from the Algerian Agency for Dams and Transfers to assess the leakage volume; reservoir level; sedimentation and evaporation levels for the period 1988–2015. We present an updated report of this problem through the dam. We estimated total average losses of 23 million m3∙year–1 for the period 1988– 2015, made up of leakage (0.3 million m3∙year–1), evaporation (18 million m3∙year–1) and dead storage for 4.6 million m3∙year–1. However, total losses for 2004 were estimated at 113.9 million m3, which increased to the alarming value of 166.8 million m3 in 2015. We suggest improving the waterproofness by a concrete screen, and reducing mudding and evaporation by reforestation, to increase the storage capacity of the dam.
Badania prowadzono w celu oceny całkowitych strat wody w zaporze Gargar, trzeciej co do wielkości zaporze w Algierii, w związku z zamulaniem zbiornika, intensywnym parowaniem i przeciekami wody. Analizowano zmienność przecieków w funkcji poziomu wody w zbiorniku i określono ilościowo straty spowodowane przeciekami, sedymentacją i parowaniem. Realizowano wyjazdy terenowe i korzystano z danych otrzymanych z Algierskiej Agencji Zapór i Transferów Wody, aby oszacować objętość strat, poziom wody w zbiorniku, sedymentację i parowanie w latach 1988–2015. W niniejszej pracy przedstawiono uaktualnione wyniki w tym zakresie. Na całkowite ubytki wody uśrednione z okresu 1988–2015 i oszacowane na 23 mln m3 na rok składały się przecieki (0,3 mln m3∙rok–1), parowanie (18 mln m3∙rok–1) i objętość martwa zbiornika (4,6 mln m3∙rok–1). Całkowite straty oszacowane w odniesieniu do roku 2004 wynosiły 113,9 mln m3, a w roku 2015 wzrosły do alarmującej wartości 166,8 mln m3. Autorzy niniejszej pracy sugerują poprawę szczelności przez użycie betonowych ekranów oraz ograniczenie zamulania i parowania poprzez zalesianie terenu przyległego, aby zwiększyć pojemność retencyjną zbiornika.
Źródło:
Journal of Water and Land Development; 2017, 35; 73-81
1429-7426
2083-4535
Pojawia się w:
Journal of Water and Land Development
Dostawca treści:
Biblioteka Nauki
Artykuł

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies