Wyszukujesz frazę "makespan" wg kryterium: Temat


Wyświetlanie 1-4 z 4
Tytuł:
Scheduling battery charging jobs with linearly decreasing power demands to minimize the total time
Autorzy:
Różycki, R.
Waligóra, G.
Węglarz, J.
Powiązania:
https://bibliotekanauki.pl/articles/200446.pdf
Data publikacji:
2020
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
scheduling
makespan
power
energy
continuous resource
Opis:
In this work we consider a problem from the field of power- and energy-aware scheduling, in which a set of batteries have to be charged in a minimum time. The formulated problem is to schedule independent and nonpreemptable jobs to minimize the schedule length, where each job requires some amount of power and consumes a certain amount of energy during its processing. We assume that the power demand of each job linearly decreases with time, as it is the case when Li-ion batteries are being charged. For the assumed job model we prove that each next job should be started as soon as the required amount of power is available. Basing on the proven theorem we formulate a procedure generating a minimum-length schedule for an assumed order of jobs. We also analyze the case of identical jobs, and show some interesting properties of this case.
Źródło:
Bulletin of the Polish Academy of Sciences. Technical Sciences; 2020, 68, 2; 299-306
0239-7528
Pojawia się w:
Bulletin of the Polish Academy of Sciences. Technical Sciences
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Advanced cascaded scheduling for highly autonomous production cells with material flow and tool lifetime consideration using AGVs
Autorzy:
Miller, Eddi
Engelmann, Bastian
Kaupp, Tobias
Schmitt, Jan
Powiązania:
https://bibliotekanauki.pl/articles/24084716.pdf
Data publikacji:
2023
Wydawca:
Wrocławska Rada Federacji Stowarzyszeń Naukowo-Technicznych
Tematy:
scheduling
robotic cell
algorithm
makespan optimization
Opis:
In today’s manufacturing systems, especially in Industry 4.0, highly autonomous production cells play an important role. To reach this goal of autonomy, different technologies like industrial robots, machine tools, and automated guided vehicles (AGV) are deployed simultaneously which creates numerous challenges on various automation levels. One of those challenges regards the scheduling of all applied resources and their corresponding tasks. Combining data from a real production environment and Constraint Programming (CP-SAT), we provide a cascaded scheduling approach that plans production orders for machine tools to minimize makespan and tool changeover time while enabling the corresponding robot for robot-collaborated processes. Simultaneously, AGVs provide all production cells with the necessary material and tools. Hereby, magazine capacity for raw material as well as finished parts and tool service life are taken into account.
Źródło:
Journal of Machine Engineering; 2023, 23, 3; 69--85
1895-7595
2391-8071
Pojawia się w:
Journal of Machine Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Management of mass customized orders using flexible schedules to minimize delivery times
Zarządzanie masowo spersonalizowanymi zamówieniami przy wykorzystaniu elastycznych harmonogramów w celu zmniejszenia czasu dostawy
Autorzy:
Pandian, R. S.
Soltysova, Z.
Powiązania:
https://bibliotekanauki.pl/articles/405720.pdf
Data publikacji:
2018
Wydawca:
Politechnika Częstochowska
Tematy:
makespan
mass customization
scheduling
batch sizing
masowa personalizacja
planowanie
wielkość partii
Opis:
The goal of mass customization is to make the products and / or services to satisfy individual customer who makes the order with a specific design for their needs. In real situation it is not so easy deal to meet individual design and to satisfy each customer separately; there is a need to accustom such environment to fulfill the market demand. In such situation, the decision makers are to ensure that they are following flexibility while taking orders and also dispatching them to the customers. One such idea is being developed in this research work. The main aim of this research work is to offer the procedure; flexible mass customization (FLMACUS) to make flexible schedules that meets the customer requirements. A simple heuristics is used to develop the procedure and Gantt charts are used for accommodating the jobs for meeting specific due dates. In this paper batch type Original Equipment Manufacturers (OEMs) are considered for our study purpose. The results from Gantt charts in various categories are depicted. Such types of Gantt charts are hardly found in earlier studies and the results show that this procedure (FLMACUS) is promising in nature to meet customer demands and due dates in a mass customized environment.
Celem masowej personalizacji jest sprawienie, aby produkty i / lub usługi satysfakcjonowały indywidualnego klienta, który dokonuje zamówienia zgodnego z konkretnym projektem odpowiadającego jego potrzebom. W rzeczywistej sytuacji nie jest łatwo znaleźć indywidualny projekt i zadowolić każdego klienta osobno; istnieje potrzeba przystosowania takiego środowiska do zaspokojenia popytu na rynku. W takiej sytuacji decydenci muszą upewnić się, że działają elastycznie przy przyjmowaniu zamówień i wysyłaniu ich do klientów. Taka koncepcja rozwinięta została w niniejszej pracy badawczej. Głównym celem badania jest zaproponowanie procedury; elastyczną masową personalizację (FLMACUS) do tworzenia elastycznych harmonogramów spełniających wymagania klientów. Do opracowania procedury wykorzystano prostą heurystykę, natomiast do dostosowania zadań do spełnienia określonych terminów posłużyły wykresy Gantta. W artykule do celów badawczych wzięto pod uwagę Producentów Oryginalnego Sprzętu (OEM). W kolejnej części artykułu przedstawiono wyniki z wykresów Gantta w różnych kategoriach. Tego typu wykresy Gantta prawie nie występują we wcześniejszych badaniach, a wyniki pokazują, że ta procedura (FLMACUS) ma charakter obiecujący, aby sprostać wymaganiom klientów i terminom w masowo dostosowywanym środowisku.
Źródło:
Polish Journal of Management Studies; 2018, 18, 1; 252-261
2081-7452
Pojawia się w:
Polish Journal of Management Studies
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Mean Squared Load Criteria for Scheduling Independent Tasks
Autorzy:
Dzemyda, G.
Powiązania:
https://bibliotekanauki.pl/articles/908277.pdf
Data publikacji:
1999
Wydawca:
Uniwersytet Zielonogórski. Oficyna Wydawnicza
Tematy:
przetwarzanie równoległe
szeregowanie
zadanie kombinatoryczne
parallel processing
scheduling
combinatorial problems
minimum makespan problem
mean squared load
Opis:
Results of this paper extend the set of criteria which characterize the scheduling quality as well as the set of possible scheduling strategies. A new view on the minimum makespan criterion is presented in terms of the mean squared load of processing units. This leads in turn to the development of new scheduling algorithms. The interaction between processes of minimizing the new criteria and the maximum finishing time (makespan of the schedule) was discovered. We show the possibility of minimizing the maximum finishing time by minimizing the new criteria that characterize the mean squared load of processing units. Moreover, the optimal workload of processing units determined with the use of the proposed criteria is usually smoother (more balanced) than that found for traditional ones.
Źródło:
International Journal of Applied Mathematics and Computer Science; 1999, 9, 4; 939-954
1641-876X
2083-8492
Pojawia się w:
International Journal of Applied Mathematics and Computer Science
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-4 z 4

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies