Tytuł:
Designing construction workmanship of the revitalization of the Park of John Paul II - Pope Pilgrim in Lomza
Autorzy:
Obolewicz, Jerzy
Tyszka, Tomasz
Powiązania:
https://bibliotekanauki.pl/articles/2195745.pdf
Data publikacji:
2021
Wydawca:
Centrum Rzeczoznawstwa Budowlanego Sp. z o.o.
Tematy:
revitalization
building structures
construction works
rewitalizacja
obiekty budowlane
roboty budowlane
Opis:
Construction objects are subject to wear, damage or destruction during operation. In order to restore their glory, they require revitalization. The article presents a comprehensive process of designing the construction workmanship of the revitalization of the John Paul II - Pope Pilgrim Park in Łomża, thanks to which the park will continue to serve as a place of relaxation and rest for the local community. Due to the criterion of time in relation to the period of construction of the building, the article discusses superstitions and customs specific to the following stages of the investment: preparatory works and designa, direct implementationand operation and operationand.
Źródło:
Modern Engineering; 2021, 2; 1--16
2450-5501
Pojawia się w:
Modern Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Zmiany w rozkładzie natężeń ruchu na skrzyżowaniu jako skutek prowadzonych robót budowlanych
Changes in intersections traffic volume distribution as an effect of civil works
Autorzy:
Durczak, Jacek
Madaj, Arkadiusz
Powiązania:
https://bibliotekanauki.pl/articles/143587.pdf
Data publikacji:
2019
Wydawca:
Stowarzyszenie Inżynierów i Techników Komunikacji Rzeczpospolitej Polskiej
Tematy:
remonty dróg
roboty budowlane
organizacja ruchu drogowego
Opis:
Artykuł zawiera analizę wpływu wprowadzenia czasowej organizacji ruchu, wynikającej z prowadzonych robót budowlanych, na rozkład natężeń na skrzyżowaniach zlokalizowanych w sąsiedztwie prowadzonych robót, a nie objętych zmianami projektu czasowej organizacji ruchu. Analizę wykonano poprzez porównanie natężeń ruchu na poszczególnych kierunkach ruchu, dla okresów sprzed i w trakcie prowadzenia robót budowlanych.
Article contains analysis of impact of changes in traffic organization as a result of works, on traffic volume on intersections located nearby construction site but not involved in temporary traffic organization project. Analysis was made by comparison of traffic volume on each directions, for periods of time before and during civil works.
Źródło:
Drogownictwo; 2019, 7-8; 214-222
0012-6357
Pojawia się w:
Drogownictwo
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Obiekty elektroenergetyczne i elektrotrakcyjne w znowelizowanym prawie budowlanym
Autorzy:
Okólski, A.
Pietrzykowski, T.
Powiązania:
https://bibliotekanauki.pl/articles/250176.pdf
Data publikacji:
2001
Wydawca:
Instytut Naukowo-Wydawniczy TTS
Tematy:
budowa obiektów kolejowych
Główny Inspektor Kolejnictwa
obiekty elektroenergetyczne
Prawo budowlane
projektowanie w budownictwie
roboty budowlane
trakcja kolejowa
transport kolejowy
Opis:
W artykule dokonano przeglądu wybranych zagadnień związanych z procesem budowlanym, poczynając od projektowania, poprzez budowę, utrzymanie, aż do rozbiórki i likwidacji obiektu budowlanego regulowanych znowelizowaną ustawą Prawo budowlane i ich praktycznych implikacji dla zakładów kolejowych.
Źródło:
TTS Technika Transportu Szynowego; 2001, 8, 1-2; 75-80
1232-3829
2543-5728
Pojawia się w:
TTS Technika Transportu Szynowego
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The impact of legal regulations on investment project management in construction
Autorzy:
Szewc, Tomasz
Powiązania:
https://bibliotekanauki.pl/articles/2204766.pdf
Data publikacji:
2022
Wydawca:
Politechnika Śląska. Wydawnictwo Politechniki Śląskiej
Tematy:
construction works
management
law
roboty budowlane
zarządzanie
prawo
Opis:
Introduction/background: The performance of construction work is a process in which the legislator deeply interferes by devoting to it not only a separate act but also by regulating construction issues in several other acts. The management literature does not pay sufficient attention to legal matters, even though that they conclude some traps for the investor or the manager. Aim of the paper: To indicate and explain the idea and the stages of a construction investment project in light of the law with attention to the risks involved for the investor or the manager. Materials and methods: Analysis of literature, laws, and judgments. Results and conclusions: Regulations deeply interfere with the construction process, forcing the execution of subsequent steps in a specific order. Furthermore, every effort needs to carry out some actions. At the same time, there is a risk of failure of the investment for legal reasons during its course despite fulfilling the requirements stipulated at earlier stages. For this reason, it is essential to plan the construction investment and the project manager has to have a legal culture greater than in the case of other projects.
Źródło:
Organizacja i Zarządzanie : kwartalnik naukowy; 2022, 1; 145--159
1899-6116
Pojawia się w:
Organizacja i Zarządzanie : kwartalnik naukowy
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Roboty dodatkowe w kolejowych przedsięwzięciach budowlanych
Additional works in railway construction projects
Autorzy:
Lesniak, A.
Janowiec, F.
Powiązania:
https://bibliotekanauki.pl/articles/40655.pdf
Data publikacji:
2019
Wydawca:
Szkoła Główna Gospodarstwa Wiejskiego w Warszawie. Wydawnictwo Szkoły Głównej Gospodarstwa Wiejskiego w Warszawie
Tematy:
inwestycje kolejowe
roboty budowlane
roboty dodatkowe
zamowienia publiczne
Źródło:
Acta Scientiarum Polonorum. Architectura; 2019, 18, 2
1644-0633
Pojawia się w:
Acta Scientiarum Polonorum. Architectura
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Certyfikacja usług budowlanych w Instytucie Techniki Budowlanej
Certyfication of construction services at the Building Research Institute
Autorzy:
Kowalewski, J.
Powiązania:
https://bibliotekanauki.pl/articles/183000.pdf
Data publikacji:
2002
Wydawca:
Instytut Techniki Budowlanej
Tematy:
Instytut Techniki Budowlanej
certyfikacja
usługa budowlana
roboty budowlane
Opis:
Względy formalnoprawne i merytoryczno-techniczne predysponują Instytut Techniki Budowlanej do prowadzenia certyfikacji usług budowlanych. Szeroki zakres certyfikacji tych usług przyczyni się do podniesienia jakości całego budownictwa. Certyfikacja usług budowlanych powinna się odbywać zgodnie z wymaganiami PN-EN 45011:2000, na podobnych zasadach, jak certyfikacja wyrobów budowlanych. Przy technicznej ocenie jakości usług powinno się wykorzystywać oceny dokonywane zgodnie z obowiązującym prawem i przez osoby do tego uprawnione w trakcie prowadzenia procesu budowlanego. Kompetencje i doświadczenie kadry ITB gwarantują, że certfikcja usług budowlanych będzie prowadzona w sposób rzetelny, obiektywny i budzący zaufanie.
The Building Research Institute is for legal and technical reasons a good choice to run the certification process in the field of construction services. Wide scope of certification of construction services will contribute to improve the quality of the whole construction industry. The certification should be conducted according to the requirements of PN-EN 45011:2000 standard, using the similar rules as in case of construction industry products certification. The technical assessment of the construction services should be made according to the binding law and by the authorised people during the construction process. Competence and experience of the Building Research Institute staff is a quarantee that the certification of construction services will be conducted in a professional, objective and trustworthy way.
Źródło:
Prace Instytutu Techniki Budowlanej; 2002, R. 31, nr 2, 2; 45-48
0138-0796
Pojawia się w:
Prace Instytutu Techniki Budowlanej
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Wpływ aneksowania terminu umowy na prognozę kosztu realizacji w metodzie wartości wypracowanej
The effect of an annexation of the contracts deadline for the estimation of the cost of implementation in the EVM method
Autorzy:
Polonski, M.
Powiązania:
https://bibliotekanauki.pl/articles/40422.pdf
Data publikacji:
2019
Wydawca:
Szkoła Główna Gospodarstwa Wiejskiego w Warszawie. Wydawnictwo Szkoły Głównej Gospodarstwa Wiejskiego w Warszawie
Tematy:
obiekty budowlane
roboty budowlane
realizacja robot budowlanych
metody oceny
metoda wartosci wypracowanych
koszty realizacji
prognoza kosztow
terminy realizacji budowy
aneksowanie umow
Źródło:
Acta Scientiarum Polonorum. Architectura; 2019, 18, 2
1644-0633
Pojawia się w:
Acta Scientiarum Polonorum. Architectura
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Identyfikacja i ocena czynników wpływających na wydajność pracy robotników budowlanych
Identification and evaluation of factors affecting the performance of construction workers
Autorzy:
Plebankiewicz, E.
Juszczyk, M.
Malara, J.
Powiązania:
https://bibliotekanauki.pl/articles/887048.pdf
Data publikacji:
2014
Wydawca:
Szkoła Główna Gospodarstwa Wiejskiego w Warszawie. Wydawnictwo Szkoły Głównej Gospodarstwa Wiejskiego w Warszawie
Tematy:
roboty budowlane
robotnicy
wydajnosc pracy
czas pracy
produktywnosc
identyfikacja
Źródło:
Scientific Review Engineering and Environmental Sciences; 2014, 23, 3[65]
1732-9353
Pojawia się w:
Scientific Review Engineering and Environmental Sciences
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Kiedy inwestor może otrzymać decyzję w przedmiocie niezbędności wejścia na teren nieruchomości sąsiedniej
When can an investor obtain a decision on compulsory access to a neighbouring property?
Autorzy:
Kadej-Barwik, M.
Powiązania:
https://bibliotekanauki.pl/articles/162880.pdf
Data publikacji:
2013
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
roboty budowlane
Prawo budowlane
inwestor
nieruchomość przyległa
decyzja administracyjna
wejście przymusowe
construction works
building act
investor
neighbouring property
administrative decision
compulsory access
Opis:
Planując wykonanie określonego rodzaju robót budowlanych, takich jak postawienie budynku czy przeprowadzenie remontu, wielokrotnie okazuje się, iż bez wejścia na teren sąsiedniej nieruchomości postawienie rusztowań, wykonania wykopów czy dokonanie transportu materiałów budowlanych nie jest możliwe. I zdarza się, że inwestor nie jest w stanie samodzielnie uzyskać zgody właściciela sąsiedniej nieruchomości na czasowe jej zajęcia celem wykonania planowanych prac. Ustawodawca przewidział możliwość wystąpienia takiego problemu i stworzył alternatywę w postaci „przymusowego” wejścia na teren sąsiedniej nieruchomości w celu wykonania tych robót. Celem niniejszego artykułu jest wskazanie kto i do jakiego organu oraz w jakich okolicznościach może o wydanie takiej decyzji wystąpić.
In planning the execution of certain types of construction works, such as the erection of a building or carrying out of renovation, it often transpires that it would not be possible to install scaffolding or deliver building materials without gaining access to a neighbouring property. It may also be the case that the investor is not able to obtain, voluntarily, the consent of the neighbouring property’s owner for temporary occupation of that property for the purpose of the works. With regard to such situations, the law provides for the alternative possibility of compulsory access to a neighbouring property for the purpose of carrying out such works. This article provides information about who may apply for such a decision and in what circumstances, and to which authority the application should be made.
Źródło:
Przegląd Budowlany; 2013, R. 84, nr 9, 9; 23-26
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Kto i za co odpowiada? [Odpowiedzialność producenta i dystrybutora kostki brukowej oraz wykonawcy nawierzchni]
Autorzy:
Radłowski, J.
Powiązania:
https://bibliotekanauki.pl/articles/343687.pdf
Data publikacji:
2005
Wydawca:
Stowarzyszenie Producentów Cementu
Tematy:
roboty budowlane
roboty drogowe
kostka brukowa
kostka betonowa
rękojmia
gwarancja
Źródło:
Budownictwo, Technologie, Architektura; 2005, spec.; 56-59
1644-745X
Pojawia się w:
Budownictwo, Technologie, Architektura
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Problemy wyboru i zawierania umów z firmami podwykonawczymi
Problems of selecting and concluding contracts with subcontractors
Autorzy:
Kozik, R.
Leśniak, A.
Plebankiewicz, E.
Powiązania:
https://bibliotekanauki.pl/articles/348409.pdf
Data publikacji:
2013
Wydawca:
Akademia Wojsk Lądowych imienia generała Tadeusza Kościuszki
Tematy:
podwykonawca
umowy o podwykonawstwo
roboty budowlane
subcontractor
subcontract
construction works
Opis:
Udział podwykonawców może prowadzić do podniesienia jakości, a także redukcji czasu i kosztów realizowanego przedsięwzięcia budowlanego. Zatrudniając podwykonawców, generalny wykonawca może skoncentrować się na zarządzaniu i realizacji kluczowych procesów. Firmy podwykonawcze dostarczają specjalistów, technologie, sprzęt. Udział podwykonawców w realizacji przedsięwzięcia budowlanego może jednak także być związany z pewnym ryzykiem. Dlatego szczegółowy zakres obowiązków i praw stron generalny wykonawca powinien uzgodnić z podwykonawcą w umowie o podwykonawstwo. Dobrze przygotowana umowa gwarantuje dobrą współpracę, z uniknięciem roszczeń i wzajemnych pretensji. W artykule przedstawiono zagadnienia dotyczące wyboru podwykonawcy robót, a także przepisy prawne obowiązujące w Polsce związane z podwykonawstwem. Zaprezentowano wyniki badań, przeprowadzonych wśród firm podwykonawczych, dotyczących umów zawieranych z generalnymi wykonawcami.
The participation of subcontractors in a project can result in cost, risk and employment reduction. By employing subcontractors, the general contractor can concentrate on the key activity. Subcontractors provide specialists, technologies, equipment and work methodology. The participation of subcontractors in a project can also generate some risk. For this reason, a subcontract has to specify in detail the obligations and rights of subcontractors. A well-written subcontract can reduce the risk of its incorrect performance and ensure the right relationship between the parties. The authors present the issues concerning the selection of subcontractors and the Polish regulations governing construction contracts and subcontracts. The article describes the scope of subcontracts with some errors occurring in practice. The results of research related to construction subcontracts are also presented in the article.
Źródło:
Zeszyty Naukowe / Wyższa Szkoła Oficerska Wojsk Lądowych im. gen. T. Kościuszki; 2013, 1; 198-208
1731-8157
Pojawia się w:
Zeszyty Naukowe / Wyższa Szkoła Oficerska Wojsk Lądowych im. gen. T. Kościuszki
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Czynniki wpływające na jakość robót budowlanych
Factors influencing the quality of construction works
Autorzy:
Baryłka, Adam
Obolewicz, Jerzy
Powiązania:
https://bibliotekanauki.pl/articles/2202489.pdf
Data publikacji:
2023
Wydawca:
PWB MEDIA Zdziebłowski
Tematy:
budownictwo
roboty budowlane
czynnik
jakość
construction
construction works
factor
quality
Opis:
Problematyka jakości robót budowlanych zaczyna odgrywać coraz większą rolę w cyklu życia obiektów budowlanych. Zła jakość materiałów i wykonywanych prac niejednokrotnie decyduje o powstaniu zagrożeń, awarii oraz katastrof czy też, mniejszych w skutkach, lecz długotrwałych, uciążliwości eksploatacyjnych, wynikających z niezgodności czy też wad. Analizy z zakresu przyczyn awarii i katastrof budowalnych ujawniają fakt, iż zła jakość robót leży u podstaw problemów występujących w większości nowych obiektów. Zatem problematyka jakości robót budowlanych staje się zagadnieniem co najmniej pilnym. W artykule zidentyfikowano obszary mające wpływ na jakość robót budowlanych i zaproponowano program zapewnienia jakości robót budowlanych.
The issue of the quality of construction works begins to play an increasingly important role in the life cycle of construction facilities. Bad quality of materials and the work performed often determines the emergence of hazards, failures and catastrophes, or, with lesser effects but long-lasting, operational nuisance, resulting from non-compliance or defects. Analyzes of the causes of breakdowns and construction disasters reveal the fact that poor quality of works is at the root of the problems occurring in most new facilities. Thus, the issue of the quality of construction works becomes at least an urgent issue. The article identifies areas affecting the quality of construction works and proposes a quality assurance program for construction works.
Źródło:
Builder; 2023, 27, 2; 9--11
1896-0642
Pojawia się w:
Builder
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The impact of design and executive errors affecting the damage to the floor of the concert hall
Autorzy:
Chmielewski, R.
Baryłka, A.
Obolewicz, J.
Powiązania:
https://bibliotekanauki.pl/articles/1818805.pdf
Data publikacji:
2021
Wydawca:
Stowarzyszenie Komputerowej Nauki o Materiałach i Inżynierii Powierzchni w Gliwicach
Tematy:
historic buildings
renovations
construction works
budynki zabytkowe
renowacje
roboty budowlane
Opis:
Purpose: The aim of the article is to demonstrate the influence of errors and performance errors that affect the damage to the concert hall floor. Design/methodology/approach: When the project was launched, cracks appeared which made the floor unsuitable for further use. In order to determine the cause of the damage, the team conducted a detailed structural health analysis. Findings: The documents used for the analysis included the submitted project records, as well as the actual state of the structure. Research limitations/implications: First, the design team checked the design records for the rooms used for statistical calculations. The arrangement of the floor layers, which was not in accordance with the original design documents, overloaded the load-bearing structure of the Ackerman ceiling. Practical implications: Engineers identified other flawed design guidelines that added to the damage. As a solution, the client followed one of the solutions proposed by the original renovation team. Originality/value: Before the commencement of construction works, an analysis of design solutions and executive assumptions is required, as they may affect the previously made elements of the building structure.
Źródło:
Journal of Achievements in Materials and Manufacturing Engineering; 2021, 104, 2; 49--56
1734-8412
Pojawia się w:
Journal of Achievements in Materials and Manufacturing Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
O zasadach wiedzy technicznej w budownictwie
Technical knowledge in the construction industry
Autorzy:
Karkoszka, Piotr
Wojtkiewicz, Tomasz
Powiązania:
https://bibliotekanauki.pl/articles/163348.pdf
Data publikacji:
2019
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
wiedza techniczna
sztuka budowlana
prawo budowlane
kodeks cywilny
roboty budowlane
dokumentacja wykonawcza
technical knowledge
construction art
construction law
civil code
construction works
execution documentation
Opis:
Termin „zasady wiedzy technicznej” został zastąpiony szeroko rozumianym pojęciem „sztuki budowlanej”. Obecnie te dwa terminy są stosowane przez prawników zamiennie. Osoby wykonujące samodzielne funkcje techniczne w budownictwie zobowiązane są do stosowania wiedzy technicznej w zakresie koniecznym do zaprojektowania, wykonania i eksploatacji danego obiektu budowlanego. Warunkiem uzyskania uprawnień budowlanych jest zdanie egzaminu ze znajomości procesu budowlanego oraz umiejętności praktycznego zastosowania wiedzy technicznej.
Principles of technical knowledge in the construction sector and construction art. The term „principles of technical knowledge” replaced the term „construction art”. Currently, these two terms are used by lawyers interchangeably. Persons performing independent construction and operations of a given building. The conditio for obtaining building qualifications is passing an exam in the knowledge of the construction process and the prfactical application of technical knowledge.
Źródło:
Przegląd Budowlany; 2019, 90, 6; 34-38
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Czynniki opóźniające realizacje przedsięwzięć budowlanych w systemie zaprojektuj i wybuduj
Delay factors in execution of design & build construction projects
Autorzy:
Lesniak, A.
Piskorz, G.
Powiązania:
https://bibliotekanauki.pl/articles/40350.pdf
Data publikacji:
2018
Wydawca:
Szkoła Główna Gospodarstwa Wiejskiego w Warszawie. Wydawnictwo Szkoły Głównej Gospodarstwa Wiejskiego w Warszawie
Tematy:
budownictwo
przedsiewziecia budowlane
roboty budowlane
opoznienia w realizacji inwestycji
system zaprojektuj i wybuduj
construction industry
construction project
building work
delay
design-and-build system
Źródło:
Acta Scientiarum Polonorum. Architectura; 2018, 17, 4
1644-0633
Pojawia się w:
Acta Scientiarum Polonorum. Architectura
Dostawca treści:
Biblioteka Nauki
Artykuł

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies