Tytuł:
Analysis and Modeling the Streambed Evolution after the Check Dam Restoration: the Case of Krzczonówka Stream
Autorzy:
Łapuszek, Marta
Powiązania:
https://bibliotekanauki.pl/articles/124542.pdf
Data publikacji:
2019
Wydawca:
Polskie Towarzystwo Inżynierii Ekologicznej
Tematy:
check dam
sediment movement
river restoration
Opis:
In the Upper Vistula Basin, series of check dams are located on almost each of mountain stream. These streams are strongly affected by the presence of dams that disrupt the sediment movement in the channel. Moreover, the check dams are in poor technical condition. The current study focuses on the Krzczonówka Stream, a left-bank tributary of the Raba River, where restoration works were undertaken in 2014 involving lowering of a check dam. The aim of the project was the continuity of the stream corridor for fish migration restoration. This paper aims to provide an analysis of the streambed evolution and a numerical analysis of the impact of check dam lowering and removal of sediment, previously accumulated upstream under the geomorphologic conditions in the studied stream after three years of project execution. A 1D sediment transport model was employed to estimate the areas of erosion and deposition throughout the river course. The calculations show that the thickness of the deposited sediment ranged from 0.20 up to 0.91 m at 1.5 km of the reach. The layer thickness deposited form 2.1 to 1.75 km of the reach, is rather thin; subsequently, the layer thickness increases and the highest values are reached at the area of 1.35 – 1.7 km. The local erosion is observed in 1.1 km of the reach. It is very important to note that the identified erosional and accumulation tendencies are the same at corresponding cross sections measured as calculated based on the model. This also provides a practical form of model validation. Additionally, the stream channel evolution on the base on low annual water stages in Krzczonów gauging station, located downstream the dam, indicates that the bottom has increased in this section by about 50 cm. The comparison of cross-sectional geometry in years of 2015–2016 (after flood event) shows that the stream channel moved in the transverse direction (bank erosion and deposition) and the streambed level has changed slightly. Currently, the stream channel does not seem to be in a state of hydrodynamic equilibrium. Thus, further field measurements will try to indicate when this balance is achieved.
Źródło:
Journal of Ecological Engineering; 2019, 20, 1; 188-196
2299-8993
Pojawia się w:
Journal of Ecological Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Technical Assessment of River Training Impact on the Raba River Bed Stability on the Selected Longitudinal Section
Autorzy:
Łapuszek, Marta
Wolak, Andrzej
Powiązania:
https://bibliotekanauki.pl/articles/125367.pdf
Data publikacji:
2019
Wydawca:
Polskie Towarzystwo Inżynierii Ekologicznej
Tematy:
river training
river bed stability
river restoration
Opis:
Short assessment and prediction of movement of selected Raba river sections in Southern Poland, using the existing, historical sources is presented in this paper. It was done to the most practicable extent, with regard to the river training structures as groynes and revetments stability structures. The old maps (almost non-existent) and/or aerial photographs of the selected areas and the archival projects of technical Raba river channel regulation were complemented with specific stream power and bed shear stress. In the 8.2 km long study area, four specific sections were studied in the current paper. The general trends over the last fifty years included artificial narrowing of the active channel width with uniform riverbed longitudinal slope. The current studies lead to the conclusion that the narrowed river channel tend to restoring its previous state. However, throughout each analyzed section, the channel-forming processes are varied, mostly related to restoring the local natural longitudinal slope. In Section-1, the process of sediment deposition was observed and it continues till now. In Section-2, the channel-forming processes were carried out with high intensity with tendency to rebuild its previous braided course. Currently, this tendency is continuing. The third Section seems to be the most stable after the river training works. In Section-4 the process of high erosion, especially of the left bank, is observed. The results of the analysis lead to the conclusion that more comprehensive investigation is needed of the whole 8.2-km long reach to assess the river state.
Źródło:
Journal of Ecological Engineering; 2019, 20, 9; 145-155
2299-8993
Pojawia się w:
Journal of Ecological Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-2 z 2

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies