Tytuł:
Scheduling linear construction projects with constraints on resource availability
Harmonogramowanie realizacji obiektów liniowych z ograniczoną dostępnością zasobów
Autorzy:
Biruk, S.
Jaśkowski, P.
Powiązania:
https://bibliotekanauki.pl/articles/230149.pdf
Data publikacji:
2017
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
zarządzanie przedsięwzięciem
przedsięwzięcie budowlane
harmonogramowanie
realizacja
obiekt liniowy
alokacja zasobów
project management
construction project
scheduling
execution
linear project
resource allocation
Opis:
Production rates for various activities and overall construction project duration are significantly influenced by crew formation. Crews are composed of available renewable resources. Construction companies tend to reduce the number of permanent employees, which reduces fixed costs, but at the same time limits production capacity. Therefore, construction project planning must be carried out by means of scheduling methods which allow for resource constrains. Authors create a mathematical model for optimized scheduling of linear construction projects with consideration of resources and work continuity constraints. Proposed approach enables user to select optimal crew formation under limited resource supply. This minimizes project duration and improves renewable resource utilization in construction linear projects. This paper presents mixed integer linear programming to model this problem and uses a case study to illustrate it.
Przedsięwzięcia budowlane o charakterze liniowym (takie jak budowa autostrad, dróg kolejowych, tuneli czy rurociągów) składają się z czynności powtarzanych na działkach roboczych. Istotną częścią procesu harmonogramowania przedsięwzięć budowlanych jest dobór zasobów i synchronizacja ich pracy. Liczba przypisanych pracowników lub rodzaj i liczba maszyn budowlanych wpływa na czas wykonania procesów powtarzanych na kolejnych lokalizacjach i w konsekwencji na czas realizacji całego przedsięwzięcia. Ze względu na obecną recesję gospodarczą, która powoduje trudności w pozyskiwaniu nowych zleceń oraz rosnące koszty pracy, wiele przedsiębiorstw budowlanych redukuje swój potencjał kadrowy. Stąd też istnieje konieczność udoskonalenia metod planowania uwzględniających ograniczoną dostępność kluczowych zasobów. Harmonogramowanie z uwzględnieniem ograniczonej dostępności zasobów, w szczególności brygad specjalizowanych i maszyn, stanowi problem decyzyjny rozwiązywany w przypadku większości przedsięwzięć budowlanych.
Źródło:
Archives of Civil Engineering; 2017, 63, 1; 3-15
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Wspomaganie controllingu przedsięwzięć budowlanych systemami informatycznymi – wymagania, stan obecny i perspektywy
Supporting of Project Controlling with IT Systems – requirements, current situation and prospects
Autorzy:
Głodziński, Eryk
Powiązania:
https://bibliotekanauki.pl/articles/1367453.pdf
Data publikacji:
2015
Wydawca:
Uniwersytet Szczeciński. Wydawnictwo Naukowe Uniwersytetu Szczecińskiego
Tematy:
controlling
project management
construction project
IT systems
zarządzanie projektem
przedsięwzięcie budowlane
systemy informatyczne
Opis:
Wykorzystanie systemów informatycznych jako narzędzi wspomagających zarządzanie, powinno umożliwić zwiększenie skuteczności i efektywności realizacji projektów. Jest to jednak zagadnienie bardzo złożone, stąd pojawia się wiele dylematów, których rozwiązania podejmują się zarówno naukowcy, jak i praktycy biznesu. Artykuł ma na celu określenie wymagań w odniesieniu do systemów informatycznych w warunkach zastosowania controllingowej koncepcji zarządzania przedsięwzięciami budowlanymi. W opracowaniu opisano również stan obecny rozwoju oprogramowania. Analiza funkcjonowania przedsiębiorstw budowlanych w Polsce wskazuje, że menedżerowie w fazie realizacji projektu w ograniczonym stopniu wykorzystują możliwości, jakie daje im obecny poziom rozwoju technologii informatycznych wspomagających zarządzanie.
Supporting of project management with IT systems should result with the increase of their effectiveness and efficiency. The issue is very complex and needs to be studied by researchers and practitioners. The paper aims at presenting the requirements for IT systems in conditions of the use of controlling management concept in construction projects. The description of the current development of software and its prospects is presented in the article. The conducted study of construction companies in Poland shows that the managers in execution phase do not use sufficient (taking into account current IT technology development
Źródło:
Zeszyty Naukowe. Studia Informatica; 2015, 38; 21-36
0867-1753
Pojawia się w:
Zeszyty Naukowe. Studia Informatica
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Inwestycje według FIDIC. Kryteria wyboru inżyniera kontraktu
Contract engineer selection criteria in FIDIC standards industrial projects
Autorzy:
Leśniak, Agnieszka
Powiązania:
https://bibliotekanauki.pl/articles/129205.pdf
Data publikacji:
2020
Wydawca:
PWB MEDIA Zdziebłowski
Tematy:
warunki kontraktowe
FIDIC
inżynier kontraktu
wybór
analiza kryteriów
przedsięwzięcie budowlane
przedsięwzięcie publiczne
budownictwo przemysłowe
contract conditions
contract engineer
selection
criterion analysis
construction project
public project
industrial project
Opis:
W realizacji przedsięwzięć budowlanych zgodnie z popularnymi wzorami Warunków Kontraktowych FIDIC uczestniczy firma zarządzająca zwana w warunkach polskich inżynierem kontraktu. Inżynier ten staje się pełnomocnikiem zamawiającego posiadającym szereg uprawnień i obowiązków na kontrakcie, a jego kwalifikacje i doświadczenie będą miały znaczenie dla powodzenia całego przedsięwzięcia. Wybór właściwego zarządzającego powinien być zatem dla inwestora kluczową decyzją. Celem artykułu jest analiza kryteriów stosowanych przez zamawiających przy wyborze inżyniera kontraktu dla publicznych przedsięwzięć o charakterze przemysłowym.
Contract engineer selection criteria in FIDIC standards industrial projects . A management company, in Polish conditions known as a contract engineer, participates in the implementation of construction projects under popular FIDIC Contract Terms and Conditions. The engineer becomes the representative of the contracting authority with the rights and obligations specified in the contract, and their qualifications and experience will be important for the success of the project. The selection of the right contract engineer should therefore be a key decision for the investor. The aim of the paper is to analyze the criteria of selection a contract engineer used by contracting authorities for public industrial projects.
Źródło:
Builder; 2020, 24, 4; 48-50
1896-0642
Pojawia się w:
Builder
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Cyfryzacja w budownictwie
Autorzy:
Tryfon-Bojarska, Anna
Wińska, Ewelina
Powiązania:
https://bibliotekanauki.pl/articles/128958.pdf
Data publikacji:
2019
Wydawca:
PWB MEDIA Zdziebłowski
Tematy:
cyfryzacja
innowacja
rzeczywistość rozszerzona
przedsięwzięcie budowlane
zarządzanie projektem
geofizyka
digitization
innovation
augmented reality
construction project
project management
geophysics
Opis:
Czwarta rewolucja przemysłowa niesie ze sobą kompleksową transformację cyfrową przedsiębiorstw. Jej dziewięć filarów ma wpływ również na branżę budowlaną. W artykule przedstawiono wpływ, jaki transformacja cyfrowa wywiera na projekty innowacyjne realizowane w branży budowlanej, omówiono przykłady innowacji cyfrowych, jakie stosowane są w cyklu życia projektu deweloperskiego – biurowego oraz opisano na przykładach i studium przypadku, jakie stosowane są modele zarządzania projektami innowacyjnymi.
The fourth industrial revolution carries out a comprehensive digital transformation of enterprises. Its nine pillars also affect the construction industry. The article presents the impact of digital transformation on innovative projects implemented in the construction industry, examples of digital innovations that are used in the lifecycle of a property development undertaking, are discussed, and examples and case studies of applied innovation project management models are described.
Źródło:
Builder; 2019, 23, 9; 12-14
1896-0642
Pojawia się w:
Builder
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Wybrane metody identyfikacji czynników ryzyka na tle cyklu życia projektu i budowlanego procesu inwestycyjnego
Selected methods for identifying risk factors in comparison with project life cycle and construction investment process
Autorzy:
Górski, M.
Skorupka, D.
Powiązania:
https://bibliotekanauki.pl/articles/348405.pdf
Data publikacji:
2011
Wydawca:
Akademia Wojsk Lądowych imienia generała Tadeusza Kościuszki
Tematy:
zarządzanie projektami
ryzyko
zarządzanie ryzykiem
czynniki ryzyka
metodyka zarządzania projektami
przedsięwzięcie budowlane
budowlany proces inwestycyjny
project management
risk
risk management
risk factors
methodology of project management
construction project
construction investment process
Opis:
W artykule scharakteryzowano m.in. cykl życia projektu i budowlany proces inwestycyjny. Spośród obszarów wiedzy metodyk zarządzania projektami wyróżniono elementy procesu zarządzania ryzykiem w projektach, a w szczególności wybrane metody identyfikacji czynników ryzyka. Zwrócono uwagę na uniwersalność, wady, zalety i rezultaty tych metod, pod kątem zastosowania ich podczas realizacji projektu budowlanego.
The article describes the life cycle of a project and a construction investment process. Using the knowledge areas of project management methodologies, the authors focus on the elements of the risk management process. One of the main points of analyses was the selected methods of identifying risk factors. The focus was on the versatility, disadvantages, advantages and results of these methods for their use during a construction project.
Źródło:
Zeszyty Naukowe / Wyższa Szkoła Oficerska Wojsk Lądowych im. gen. T. Kościuszki; 2011, 4; 307-324
1731-8157
Pojawia się w:
Zeszyty Naukowe / Wyższa Szkoła Oficerska Wojsk Lądowych im. gen. T. Kościuszki
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Problematyka inżynierii przedsięwzięć budowlanych na konferencjach krynickich 2017 i 2018
Problems of the construction projects engineering at the conferences in Krynica 2017 and 2018
Autorzy:
Kapliński, O.
Powiązania:
https://bibliotekanauki.pl/articles/161450.pdf
Data publikacji:
2018
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
Konferencja Krynicka
przedsięwzięcie budowlane
inżynieria przedsięwzięć budowlanych
problematyka
referat
Krynicka Conference
construction project
construction project engineering
issues
conference paper
Opis:
Referaty przedstawiane podczas konferencji krynickich stanowią przegląd osiągnięć danej specjalności. W artykule dokonano ocenę referatów z zakresu inżynierii przedsięwzięć budowlanych. Zwrócono uwagę na wielowymiarowość problematyki. Ocenę dokonano wg triady: problem naukowy – metody – aplikacje. Scharakteryzowano obszary badawcze, określono tendencje w zakresie badań.
Papers presented at the conferences in Krynica provide an overview of the achievements of a given specialty. In this case, the evaluation of the papers in the field of construction projects engineering is presented in the article. Attention is paid to the multidimensional nature of the problem. The assessment has been made according to the triad: scientific problem – methods – applications. Research areas have been characterized and research trends have been defined.
Źródło:
Przegląd Budowlany; 2018, 89, 9; 12-15
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Aspekty społeczne, ekonomiczne i techniczne rewitalizacji na przykładzie dzielnicy Gdansk-Letnica
Social, economic and technical aspects of revitalization, on the example of the Letnica borough of Gdansk
Autorzy:
Urbańska-Galewska, Elżbieta
Wiśniewski, Radosław
Apollo, Magdalena
Powiązania:
https://bibliotekanauki.pl/articles/447467.pdf
Data publikacji:
2013-06
Wydawca:
Instytut Rozwoju Miast
Tematy:
rewitalizacja
obszary poprzemysłowe
przedsięwzięcie budowlane
urban regeneration
brownfields
building project
Opis:
Przedmiotem rozważań są problemy społeczne, ekonomiczne i techniczne komunalnych zasobów mieszkaniowych, dostrzeżone w toku wykonywania różnych robót budowlanych objętych projektem „Rewitalizacja Letnicy w Gdańsku”. Autorzy zwracają uwagę i analizują motywy brane pod uwagę przy ocenie zasadności podjęcia tak złożonej inwestycji. Sygnalizują ponadto problemy wynikające z funkcjonowania i współpracy licznych jednostek zarządczych realizujących działania inwestycyjne na rzecz Miasta Gdańska oraz wielu podmiotów gospodarczych uczestniczących w inwestycji. Jak wykazano, trafność podjętych decyzji, będąca ważnym elementem ocen końcowych, warunkuje odniesienie sukcesu społecznego. Ten natomiast zagrożony jest występowaniem licznych trudności na poszczególnych etapach procesu rewitalizacji, co powinno zostać dokładniej przeanalizowane.
The main subject of consideration are social, economic and technical problems of municipal housing stock identified in the performance of various building works executed under the actions covered by „Revitalization of Letnica in Gdansk” project. The authors draw attention and analyze the motives taken into consideration while assessing the appropriateness of such a complex investment. Moreover they signal problems resulting from the functioning and cooperation of a large number of management units implementing investment activities to the City of Gdansk and many contractors and ubcontractors at site. As shown, the accuracy of undertaken decisions, which is an important aspect of the revitalization process final evaluation, is conditioned by the social success. It is however threatened bythe occurrence of numerous difficulties at various stages of revitalization process, which should be further analyzed.
Źródło:
Problemy Rozwoju Miast; 2013, 2; 29-39
1733-2435
Pojawia się w:
Problemy Rozwoju Miast
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Scheduling of job resources in multiunit projects with the use of time/cost criteria
Harmonogramowanie pracy zasobów w przedsięwzięciu wieloobiektowym z zastosowaniem kryterium koszt/czas
Autorzy:
Podolski, M.
Powiązania:
https://bibliotekanauki.pl/articles/230720.pdf
Data publikacji:
2016
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
harmonogramowanie
przedsięwzięcie budowlane
przedsięwzięcie wieloobiektowe
wyżarzanie symulowane
praca potokowa
optymalizacja
wybór wykonawców
scheduling
construction project
multi unit project
simulated annealing
flow-shop
optimization
contractor selection
Opis:
This paper presents a model of scheduling of multi unit construction project based on an NP-hard permutation flow shop problem, in which the considered criterion is the sum of the costs of the works' execution of the project considering the time of the project as a constraint. It is also assumed that each job in the units constituting the project may be realized in up to three different ways with specific time and cost of execution. The optimization task relies on solving the problem with two different decision variables: the order of execution of units (permutation) and a set of ways to carry out the works in units. The task presented in the paper is performed with the use of a created algorithm which searches the space of solutions in which metaheuristic simulated annealing algorithm is used. The paper presents a calculation example showing the applicability of the model in the optimization of sub-contractors' work in the construction project.
Ze względu na możliwości planowania przedsięwzięcia budowlane można podzielić na dwa podstawowe rodzaje: przedsięwzięcia typu „kompleks operacji” oraz takie, które mogą być zorganizowane zgodnie z zasadami metody pracy równomiernej, czyli w systemie pracy potokowej [3]. W systemach pracy potokowej najczęściej rozważanym kryterium optymalizacji harmonogramów przedsięwzięć realizowanych w tym systemie jest czas trwania całego przedsięwzięcia [1, 5, 6]. W referacie przedstawiony jest model systemu pracy potokowej, w którym są uwzględnione koszty realizacji robót w przedsięwzięciu, co będzie prowadzić do rozwiązywania zagadnienia optymalizacji dyskretnej z zależnością czas/koszt. Dla rozpatrywanego w referacie modelu zakłada się przyjęcie sytuacji deterministycznej. Zakłada się, że każdy rodzaj robót można wykonać na maksymalnie trzy sposoby przyjmując dla każdego sposobu czas trwania i koszt realizacji roboty. Zagadnienie wyboru zasobów sprowadza się do wyboru sposobu wykonania robót w przedsięwzięciu. W modelu przedsięwzięcia można wyróżnić problem optymalizacyjny, w którym można zawarte są dwie, oddzielne zmienne decyzyjne. Pierwsza z nich to kolejność realizacji obiektów (działek roboczych), która jest reprezentowana przez permutację o długości równej liczbie obiektów. Druga z nich to macierz numerów sposobów realizacji robót (od 1 do 3) o wymiarach równych liczbie robót i liczbie obiektów w przedsięwzięciu. Problem optymalizacyjny w modelu jest zadaniem optymalizacji jednokryterialnej, które będzie polegało na minimalizacji kosztu całego przedsięwzięcia przy założonym ograniczeniu dotyczącym terminu jego realizacji. Rozpatrywany model systemu pracy potokowej jest NP-trudnym zagadnieniem optymalizacyjnym i wykorzystuje założenia permutacyjnego problemu przepływowego z kryterium czasu wykonywania wszystkich zadań (problem FP ǀǀ Cmax), który jest rozważany w teorii szeregowania zadań. W związku z istnieniem dwóch różnych zmiennych decyzyjnych dla rozwiązania zadania optymalizacyjnego w przedstawionym modelu proponuje się opracowany przez autora referatu algorytm, który wykorzystuje metaheurystykę symulowanego wyżarzania [2, 4]. Algorytm ten ma na celu przeszukanie przestrzeni rozwiązań zawartych w n! możliwych harmonogramów, rozwiązując dla znalezionej permutacji zadanie minimalizacji kosztu całego przedsięwzięcia. W referacie podano przykład obliczeniowy optymalizacji harmonogramu przedsięwzięcia budowlanego polegającego na realizacji grupy budynków mieszkalnych. Przedstawiony model przedsięwzięcia wieloobiektowego może znaleźć zastosowanie podczas ustalania optymalnego harmonogramu pracy podwykonawców firm budowlanych przy zastosowaniu potokowego systemu pracy.
Źródło:
Archives of Civil Engineering; 2016, 62, 1; 143-158
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Enterprises risk assessment of complex construction projects
Ocena ryzyka inwestycyjnego w złożonych przedsięwzięciach budowlanych
Autorzy:
Konior, J.
Powiązania:
https://bibliotekanauki.pl/articles/230489.pdf
Data publikacji:
2015
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
przedsięwzięcie budowlane
zarządzanie
korelacja
ryzyko inwestycyjne
building project
management
correlation
investment risk
Opis:
The purpose of this article is to present the preparation of Project Risk Assessment Methodology and its mitigation in complex construction projects. The main text provides a summary of the approach, the method used and the findings. The conclusions have been drawn that the proper tools for quantifying risks have to be based on the criteria specific for mathematical statistic and probability or at least fuzziness. Function, which makes possible to categorize any risks into one of the five categories, is a combination of probability and the impact on one of the items: people and their safety or budget, cost, schedule and planning or quality and performance. An attempt was made to express numerically the relationship between risks impacts and their level of likelihood. Also, a method of associating the influence of projects risks impacts on the extent of the likelihood of project risk occurrence which makes possible to determine the direction and the strength of this relationship was presented.
Ryzyko przedsięwzięcia budowlanego jest definiowane jako nieplanowane zdarzenie, które – jeśli wystąpi – ma negatywny wpływ na cel zadania inwestycyjnego. Na podstawie tej definicji przedstawiono narzędzia do kwantyfikacji ryzyk, oparte na założeniach matematycznych i kryteriach probabilistycznych. Funkcja - która umożliwia kategoryzowanie wszelkich ryzyk w jedną z pięciu kategorii - jest kombinacją prawdopodobieństwa wystąpienia ryzyka i jego wpływu na: ludzi i ich bezpieczeństwo, budżet i nakłady inwestycji, planowanie i harmonogramowanie przedsięwzięcia oraz jakość realizacji robót budowlanych. W artykule przedstawiono próbę liczbowego wyrażenia relacji pomiędzy wielkością ryzyk a prawdopodobieństwem ich wystąpienia. Zaprezentowano metodę powiązania wpływu wagi ryzyka z prawdopodobieństwem jego wystąpienia jako zdarzenia losowego oraz wyznaczenia kierunku i siły tego związku w przedsięwzięciach budowlanych.
Źródło:
Archives of Civil Engineering; 2015, 61, 3; 63-74
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Significance risks evaluation of commercial construction projects
Pomiar istotności ryzyk niepublicznych przedsięwzięć budowlanych
Autorzy:
Konior, J.
Powiązania:
https://bibliotekanauki.pl/articles/230487.pdf
Data publikacji:
2019
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
przedsięwzięcie budowlane
ryzyko
istotność ryzyka
korelacja
construction project
risk
risk significance
correlation
Opis:
The main objective of the article is to present quantified and measurable risks likelihood appearance, impact and significance of inspected and monitored 48 commercial construction projects and their feasibility to be carried out. Original technical, financial and organisational feasibility studies in compliance with a rigorous Bank Investment Supervision requirements have been executed by the author in the period of 2005 – 2018. Methodology of construction project appraisal for financing and execution professional preparation have been laid out – technical documentation, arrangements, realisation. Analysis and assessment of Bank Investment Supervision consisted of project execution plan PEP, geotechnical and environmental conditions, permit design, agreements and decision impacts of local authorities, engineering contract for construction works, project insurance and performance bonds, schedule of execution tasks and their costs, payment plan, investment budget and project economical effectiveness, scope of monthly construction works execution assessed by Earned Value Method approach and handover procedure of construction project. An attempt was made to express numerically the relationship between risks impacts and their level of likelihood. Also, a method of associating the influence of projects risks impacts on the extent of the likelihood of project risk occurrence which makes possible to determine the direction and the strength of this relationship was presented. Finally, risks likelihood appearance, impact and significance variability of commercial construction projects within last two years of booming investment industry have been determined.
W artykule przedstawiono techniczne, finansowe i organizacyjne metody oceny istotności ryzyk przedsięwzięć budowlanych podejściem i wymaganiami Nadzoru Bankowego. Zaprezentowano metodykę oceny poprawności przygotowania inwestycji niepublicznych do wykonania i finansowania oraz monitorowania ich realizacji według przyjętych, sparametryzowanych założeń kosztowych i czasowych. Celem badań była zestandaryzowana, mierzalna ocena kluczowych parametrów ryzyk zadań inwestycyjnych – ich wpływu, prawdopodobieństwa występowania i istotności - prowadząca do minimalizacji niewłaściwego kredytowania zadań inwestycyjnych przez Bank Finansujący. Analizie i ocenie poddano Plan Realizacji Projektu PRP, warunki geotechniczne i środowiskowe, projekt budowlany, uzgodnienia i decyzje administracyjne, kontrakt inżynierski, ubezpieczenia i gwarancje, harmonogram rzeczowo – finansowy, plan płatności, budżet inwestycji i jej rentowność z okresem zwrotu, poziom miesięcznego przerobu robót budowlanych Metodą Wartości Wypracowanej EVM, pomiar istotnych ryzyk inwestycyjnych oraz procedurę odbiorową przedsięwzięcia budowlanego.
Źródło:
Archives of Civil Engineering; 2019, 65, 2; 19-33
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Tasks and problems in the buildings demolition works: a case study
Zadania i problemy w rozbiórkach budynków: studium przypadku
Autorzy:
Sobotka, A.
Radziejowska, A.
Czaja, J.
Powiązania:
https://bibliotekanauki.pl/articles/231373.pdf
Data publikacji:
2015
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
roboty rozbiórkowe
ryzyko
przedsięwzięcie budowlane
regulacje prawne
demolition works
risk
construction project
legal regulations
Opis:
In Poland, it often happens that construction objects are subject to demolition work for different reasons. Demolition, according the Construction Law, is defined as a type of construction works and, as such, represents a particular type of construction project. As in other construction projects, a very important phase, in addition to execution of the works, is to prepare, design and plan demolition works. Some demolition activities are covered by appropriate regulations and can be described as typical. On the other hand the technical side of demolition works depends on many factors such as: the type of building, its age, technical condition, type of construction, etc. This article covers the analysis of the stages and tasks in the preparatory phase of the building demolition. This work will also present a description of the tasks carried out during the demolition works based on the example of a historic tenement house located in Krakow. This analysis aims to identify implementation problems and sources of risk that may occur during this type of construction work.
Coraz częściej w Polsce obiekty budowlane z powodów złego stanu technicznego, funkcjonalnego, ekonomicznego, itp. są likwidowane - rozbierane. Rozbiórka w Prawie budowlanym zdefiniowana jest jako typ robót budowlanych i jako taki stanowi szczególny rodzaj przedsięwzięcia budowlanego. Podobnie jak w innych przedsięwzięciach bardzo ważną fazą jest przygotowanie, zaprojektowanie i zaplanowanie robót rozbiórkowych. Niektóre działania w zakresie rozbiórek objęte są właściwymi przepisami i można je określić, jako typowe. Natomiast techniczna strona robót rozbiórkowych zależy od wielu czynników takich jak: rodzaj budynku, konstrukcji, wiek, stan techniczny, funkcjonalny, technologia wykonania, lokalizacja itd. Artykuł obejmuje analizę etapów i zadań w fazie przygotowawczej rozbiórki obiektu budowlanego. Natomiast problemy natury technicznej robót rozbiórkowych przedstawiono na przykładzie zabytkowej kamienicy znajdującej się na terenie Krakowa. Analiza procesu przygotowania i wykonania rozbiórki obiektu ma na celu wskazanie problemów realizacyjnych oraz źródeł ryzyka, jakie mogą wystąpić podczas tego rodzaju prac budowlanych. Praktyka wskazuje, że faza przygotowawcza przedsięwzięcia, jakim jest likwidacja obiektu, tak jak przy nowo budowanych obiektach, jest zwykle dłuższa niż pozostałe fazy. Etapy składające się na tę fazę i zadania, jakie należy wykonać przed przystąpieniem do robót rozbiórkowych, zostały uporządkowane i przedstawione w postaci schematu blokowego przedstawionego na Rys.1. szarością oznaczono etapy dotyczące rozbiórki analizowanego w artykule obiektu.
Źródło:
Archives of Civil Engineering; 2015, 61, 4; 3-18
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Kontrola społeczna realizacji przedsięwzięć inwestycyjno-budowlanych
The social control of realization of the construction investment projects
Autorzy:
Biliński, Tadeusz
Kucharczyk, Emilia
Powiązania:
https://bibliotekanauki.pl/articles/162329.pdf
Data publikacji:
2019
Wydawca:
Polski Związek Inżynierów i Techników Budownictwa
Tematy:
przedsięwzięcie budowlane
realizacja
kontrola społeczna
proces budowlany
construction project
realization
social control
building process
Opis:
W artykule przedstawiono zagadnienie związane z kontrolą społeczną procesu inwestycyjno-budowlanego, a także działania organów administracji publicznej uczestniczących w postępowaniach obejmujących realizacje przedsięwzięć inwestycyjno-budowlanych, która jest ważnym narzędziem umożliwiającym społeczeństwu wypowiadanie się w sprawach związanych z działalnością budowlaną. Artykuł wyjaśnia podstawy kontroli instytucjonalnej i kontroli społecznej, główne instrumenty, formy i zakres. W celu zobrazowania znaczenia i ważności kontroli społecznych autorzy artykułu przedstawiają kilka wybranych charakterystycznych przykładów takich kontroli w budownictwie, które mają często duże konsekwencje społeczne i gospodarcze.
The paper presents the issue related to social control of the investment and construction process, as well as the activities of public administration participating in proceedings involving the implementation of investment and construction projects, which is an important tool enabling the social to speak on matters related to construction activities. The article explains the basics of institutional control and social control, the main instruments, forms and scope. To illustrate the importance of social control, the authors present a few selected characteristic examples of such controls in investment, which often have large social and economic consequences.
Źródło:
Przegląd Budowlany; 2019, 90, 1; 38-41
0033-2038
Pojawia się w:
Przegląd Budowlany
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Metoda planowania i kontrolowania realizacji przedsięwzięć budowlanych: studium przypadku
The method of construction project planning and control: case study
Autorzy:
Czarnigowska, A.
Sobotka, A.
Powiązania:
https://bibliotekanauki.pl/articles/349053.pdf
Data publikacji:
2011
Wydawca:
Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie. Wydawnictwo AGH
Tematy:
przedsięwzięcie budowlane
planowanie
kontrola
wartość wypracowana
Earned Schedule
earned value
construction project
planning
control
Opis:
Podczas wykonywania robót budowlanych zwykle następuje dezaktualizacja planów (terminowych i kosztowych) i zachodzi konieczność oceny stanu zaawansowania budowy oraz zastosowania działań naprawczych. Aby kontrola i ocena zaawansowania przedsięwzięcia w odniesieniu do planowanych terminów i kosztów mogła być wykorzystana w sterowaniu przedsięwzięciem, powinna być dokonywana cyklicznie lub w określonych terminach. Celem artykułu jest zaprezentowanie metody wspomagającej zarządzanie operacyjne budową wykorzystującej harmonogramy oparte na modelach sieciowych i metodzie kontroli postępu robót i budżetu, tj. metod: Earned Value (EV) i jej rozwinięcia - Earned Schedule (ES). Obliczone wskaźniki metod ES i EV po ich interpretacji pozwalają na podjęcie decyzji odnośnie do dalszego przebiegu budowy. Zaproponowaną metodykę zastosowano w praktyce podczas realizacji robót drogowych.
It is quite common that in the course of construction works their programmes (both schedules and cost plans) have to be adjusted to changing conditions. If plans are to be met, it is thus necessary to monitor performance to introduce necessary repair actions. Progress checks providing information useful in project control should be conducted on regular basis. The aim of the paper is to present a method used for managing projects on operations level- the Earned Value method (EV) and its extension - Earned Schedule (ES). In these methods, a set of simple indices allow the project manager to decide on further progress of works. Application of the method has been illustrated by a road works case study.
Źródło:
Górnictwo i Geoinżynieria; 2011, 35, 1; 37-56
1732-6702
Pojawia się w:
Górnictwo i Geoinżynieria
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Estimation of task completion times with the use of the PERT method on the example of a real construction project
Szacowanie czasów realizacji zadań z wykorzystaniem metody PERT na przykładzie konkretnej realizacji
Autorzy:
Plebankiewicz, E.
Juszczyk, M.
Malara, J.
Powiązania:
https://bibliotekanauki.pl/articles/230964.pdf
Data publikacji:
2015
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
przedsięwzięcie budowlane
metoda PERT
zadanie
czas realizacji
szacowanie
construction project
PERT method
task
completion time
estimation
Opis:
The article presents briefly several methods of working time estimation. However, three methods of task duration assessment have been selected to investigate working time in a real construction project using the data collected from observing workers laying terrazzo flooring in staircases. The first estimation has been done by calculating a normal and a triangular function. The next method, which is the focus of greatest attention here, is PERT. The article presents a way to standardize the results and the procedure algorithm allowing determination of the characteristic values for the method. Times to perform every singular component sub-task as well as the whole task have been defined for the collected data with the reliability level of 85%. The completion time of the same works has also been calculated with the use of the KNR. The obtained result is much higher than the actual time needed for execution of the task calculated with the use of the previous method. The authors argue that PERT is the best method of all three, because it takes into account the randomness of the entire task duration and it can be based on the actual execution time known from research.
W artykule przedstawiono kilka metod szacowania czasu pracy: metoda delficka, COCOMO II, Use Case Points, PERT, Katalogi Nakładów Rzeczowych i matematyczne funkcje rozkładu prawdopodobieństwa. We wstępie teoretycznym po krótce omówiono podstawy każdej z nich. Metoda delficka jest metodą heurystyczną, opartą na doświadczeniach ekspertów. Przewidywana prognoza prawdopodobieństwa realizacji zadania określona zostaje na podstawie serii ankiet. COCOMO II jest modelem służącym do oszacowania nakładu pracy. Wyniki zostały opracowane na podstawie analizy ponad 60 projektów. Metoda Use Case Points pochodzi z metody punktów funkcyjnych. Przy wykorzystywaniu tej metody bierze się pod uwagę czynniki środowiskowe, czynniki złożoności technicznej projektów, osoby realizujące projekt w zestawieniu z rzeczywistymi pomiarami. Wśród metod sieciowych opisanym przypadkiem jest PERT (Program Evaluation and Review Technique). Należy ona do grupy deterministycznych, opartych na znalezieniu ścieżki krytycznej (podobnie jak wCPM), a następnie ustaleniu parametrów rozkładu prawdopodobieństwa: optymistycznego czasu zakończenia zadania (a), najbardziej prawdopodobnego czasu zakończenia zadania (m) i pesymistycznego czasu zakończenia zadania (b). Z uwagi na jej charakter można z łatwością stosować metody statystyczne do oceny ryzyka dotrzymania terminu realizacji zadań. Ostatnią omówioną metodą szacowania czasów realizacji są Katalogi Nakładów Rzeczowych.
Źródło:
Archives of Civil Engineering; 2015, 61, 3; 51-62
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Koncepcja zastosowania metody zarządzania łańcuchem dostaw w procesie inwestycyjnym w budownictwie
The conception of usage of supply chain management method in construction projects
Autorzy:
Sobotka, A.
Wałach, D.
Powiązania:
https://bibliotekanauki.pl/articles/403199.pdf
Data publikacji:
2011
Wydawca:
Politechnika Białostocka. Oficyna Wydawnicza Politechniki Białostockiej
Tematy:
zarządzanie łańcuchem dostaw
rozwój produktu
przedsięwzięcie budowlane
innowacje
supply chain management
product development
project construction
innovation
Opis:
Zastosowanie nowoczesnych metod zarządzania pozwala na podniesienie efektywności działalności budowlanej. Jedną z nich jest zarządzanie łańcuchem dostaw – SCM (Supply Chain Management). SCM może być postrzegane jako filozofia zarządzania przepływami w ramach całego procesu biznesowego – zorientowana na zaspokojenie potrzeb klienta, kooperację i maksymalizację zysków każdej organizacji w łańcuchu lub sieci wielu biznesów i związków. W artykule dokonano analizy rozwoju znaczenia i roli łańcuchów dostaw. Zwrócono uwagę na zastosowanie rozwiązań koncepcji SCM w procesie rozwoju produktu, jakim jest efekt końcowy przedsięwzięcia budowlanego – obiekt lub obiekty a dokładniej – usługi realizowane w oparciu o wykonane obiekty. Omówiono zastosowania rozwiązań innowacyjnych w tzw. procesie „dostarczania produktu/projektu” na przykładzie budownictwa drogowego.
The application of modern management methods for construction projects allows to improve its productivity. A supply chain management is one of these methods. SCM can thus be seen as a management philosophy flows throughout the entire business process focused on customer satisfaction, collaboration, and maximizing profits of any organization in the chain or network of multiple businesses and relationships. Attention was drawn to apply the solutions of supply chain management concept in product development, which is the end result of a construction project - the object or objects and more - through services on the basis of constructed objects. The example of the application of innovative solutions in the so-called product/project delivery during execution of road construction was discussed.
Źródło:
Budownictwo i Inżynieria Środowiska; 2011, 2, 4; 655-659
2081-3279
Pojawia się w:
Budownictwo i Inżynieria Środowiska
Dostawca treści:
Biblioteka Nauki
Artykuł

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies