Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Wyszukujesz frazę "matrix risk" wg kryterium: Temat


Wyświetlanie 1-5 z 5
Tytuł:
Risk-based maintenance assessment in the manufacturing industry: minimisation of suboptimal prioritisation
Autorzy:
Ratnayake, R. M. Chandima
Antosz, K.
Powiązania:
https://bibliotekanauki.pl/articles/406817.pdf
Data publikacji:
2017
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
classification
fuzzy logic
manufacturing firms
risk based maintenance
risk matrix
Opis:
Manufacturing firms continuously strive to increase the efficiency and effectiveness in the maintenance management processes. Focus is placed on eliminating the unexpected failures which cause unnecessary costs and the production losses. Risk-based maintenance (RBM) strategies enable to address the above through the identification of probability and consequences of potential failures whilst providing a way for prioritisation of maintenance actions based on the risk of possible failures. Such prioritisations enable to identify the optimal maintenance strategy, intervals of maintenance tasks, and optimal level of spare parts inventory. However, the risk assessment activities are performed with the support of a risk matrix. Suboptimal classifications and/or prioritisations arise due to the inherent nature of the risk matrix. This is caused by the fact that there are no means to incorporate actual circumstances at the boundary of the input ranges or at the levels of linguistic data and risk categories. In this paper, a risk matrix is first developed in collaboration with one of the manufacturing firms in Poland. Then, it illustrates the use of fuzzy logic for minimisation of suboptimal prioritisation and/or classifications using a fuzzy inference system (FIS) together with illustrative membership functions and a rule base. Finally, an illustrative risk assessment is also demonstrated to illustrate the methodology.
Źródło:
Management and Production Engineering Review; 2017, 8, 1; 38-45
2080-8208
2082-1344
Pojawia się w:
Management and Production Engineering Review
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The method of planning the implementation of railway investments including risk
Metoda planowania realizacji inwestycji kolejowych z uwzględnieniem ryzyka
Autorzy:
Kowalski, J.
Poloński, M.
Powiązania:
https://bibliotekanauki.pl/articles/230708.pdf
Data publikacji:
2019
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
identyfikacja zagrożeń
ryzyko
inwestycja kolejowa
planowanie
roboty budowlane
matryca ryzyka
threat identification
risk
railway investment
planning
construction works
risk matrix
Opis:
Almost every construction investment should contain elements of risk forecasting, whose validity depends, among other things, on the correct assessment of potential threats. These risks were defined by the Authors as risk factors that were characterized and then grouped on the basis of performed research in the scope of their identification. Due to lack of method of scheduling railway investments on the construction market, including risk assessment, a research effort was undertaken [14-17], the result of which is the proposed method. The article presents the main assumptions of the original method of rail investment planning, which on the one hand, will take into account the impact of potential threats identified previously by the Authors, and, on the other, will allow project managers to refer to the conditions in which the implementation of a specific facility is planned. The assumption was made that the method, relatively easy to implement, supported by an appropriate computational program, will encourage teams planning the implementation of railway undertakings to its application and will improve the reliability of the schedules they develop.
Prawie każda inwestycja budowlana, powinna zawierać elementy prognozowania ryzyka, których trafność jest uzależniona między innymi od prawidłowej oceny potencjalnych zagrożeń. Zagrożenia te zostały przez Autorów zdefiniowane jako czynniki ryzyka, które zostały scharakteryzowane a następnie zgrupowane na podstawie wykonanych badań w zakresie ich identyfikacji. W związku z tym, że na rynku budowlanym nie ma metody harmonogramowania inwestycji kolejowych z uwzględnieniem oceny ryzyka, podjęto wysiłek badawczy [14-17], którego efektem jest proponowana metoda. W artykule przedstawiono główne założenia oryginalnej metody harmonogramowania inwestycji kolejowych, która z jednej strony uwzględni wpływ potencjalnych, zidentyfikowanych wcześniej przez autorów specyficznych dla inwestycji kolejowych zagrożeń, a z drugiej pozwoli menadżerom projektu odnieść je do warunków, w jakich planowana jest realizacja konkretnego obiektu. Przyjęto założenie, że stosunkowo prosta we wdrożeniu metoda, wsparta odpowiednim programem obliczeniowym, zachęci zespoły planujące realizację przedsięwzięć kolejowych do jej stosowania i zwiększy wiarygodność opracowywanych przez nie harmonogramów.
Źródło:
Archives of Civil Engineering; 2019, 65, 3; 45-59
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The use of the risk matrix method for assessing the risk of implementing rail freight services
Autorzy:
Szaciłło, Lucyna
Krześniak, Mirosław
Jasiński, Dobromir
Valis, David
Powiązania:
https://bibliotekanauki.pl/articles/2179825.pdf
Data publikacji:
2022
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
rail transport
freight transport
risk matrix
adverse events
assessing of risk
transport kolejowy
transport towarowy
macierz ryzyka
zdarzenia niepożądane
ocena ryzyka
Opis:
The article presents a proposal for the use of a risk matrix for assessing the safety of the implementation of rail freight transport. The starting point for considerations related to risk assessment is the conditions arising from the business need and the obligation of entities operating in the railway market to ensure the safety of the implementation of freight tasks. The authors presented selected literature within the framework of the issues discussed. The layers of risk assessment, which include the analytical layer, the decision layer and the elimination layer, indicate the possibility of considering the problem of risk assessment from different perspectives. The identification of direct causes and consequences of undesirable events during the implementation of rail freight transport was also made. The article describes one of the methods of risk management which is the risk matrix. The authors stressed that the construction of a risk matrix should be preceded by an analysis of the factors that affect the safety of rail transportation. This is possible by determining their probability of occurrence and setting values for the consequences of adverse events. The article divides the assignment of levels of adverse events to a five-level risk matrix (slight, low, medium, high, very high). Also presented is a case study considering the risk assessment of rail freight transport in Poland using the risk matrix method for railway accidents in the area of railway lines. Thanks to the development of the risk matrix, a risk management strategy can be used. The last part of the article is a summary, which highlights the possibility of applying the presented approach to risk assessment among entities operating in the rail transport market.
Źródło:
Archives of Transport; 2022, 64, 4; 89--106
0866-9546
2300-8830
Pojawia się w:
Archives of Transport
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Assessment of risks associated with the operation of the tailings storage facility Veliki Krivelj, Bor (Serbia)
Ocena ryzyka związanego z funkcjonowaniem składowiska odpadów Veliki Krivelj, Bor (Serbia)
Autorzy:
Nisic, D.
Knezevic, D.
Lilic, N.
Powiązania:
https://bibliotekanauki.pl/articles/218818.pdf
Data publikacji:
2018
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
składowisko odpadów poflotacyjnych Veliki Krivelj
ryzyko
scenariusz sytuacji awaryjnej
konsekwencje
macierz czynników ryzyka
Tailings Storage Facility Veliki Krivelj
risk
failure scenario
consequences
risk matrix
Opis:
The Tailings Storage Facility Veliki Krivelj was formed by damming the Krivelj River valley, and it constitutes one of the largest industrial waste disposal sites in Serbia. As such, it represents a big challenge for the Bor Copper Mine in terms of stability preservation and environmental protection. Bering this in mind, it is safe to say that it is of crucial importance to recognize all the risks involved with its operation and management. This paper presents a semi-quantitative assessment of the risks entailed In the management of Tailings Storage Facility Veliki Krivelj, and demonstrates the use of 4×4 risk matrix to estimate the likelihood of potential failure scenarios and consequences and includes the application of the „As Low As Reasonably Practicable“ diagram for final risk evaluation. The results show that the management of the Tailings Storage Facility Veliki Krivelj is associated with risks that vary from negligible to high, i.e. from broadly to conditionally acceptable risks and also suggest that the irregularities in hydraulic elements and hydro-technical structures at Tailings Storage Facility are the ones with the greatest impact in increasing the risks.
Składowisko odpadów poflotacyjnych Veliki Krivelj powstało w dolinie po przegrodzeniu tamą rzeki Krivelj, w chwili obecnej jest to jedno z największych składowisk odpadów przemysłowych na terenie Serbii. W sowim obecnym kształcie stanowi ono wielkie wyzwanie dla zakładu kopalnictwa miedzi Bor, w zakresie ochrony, zachowania i stabilizacji warunków środowiska naturalnego. Mając powyższe względy na uwadze, stwierdzić należy że kwestią absolutnie kluczową jest rozpoznanie wszelkich rodzajów ryzyka związanego z funkcjonowaniem i utrzymaniem wysypiska. W artykule przedstawiono w pół-ilościową analizę ryzyka związanego z funkcjonowaniem składowiska odpadów poflotacyjnych Veliki Krivelj. Zademonstrowane zastosowanie macierzy ryzyka 4×4 do obliczania prawdopodobieństwa awarii w kilku rozpatrywanych scenariuszach działania oraz towarzyszących im skutków. Przedstawiono także zastosowanie diagramu obliczania ryzyka końcowego według schematu „tak niskie, jak tylko praktycznie wykonalne”. Wyniki wskazują, że funkcjonowanie składowiska odpadów poflotacyjnych Veliki Krivelj związane jest występowaniem wielu czynników ryzyka, od pomijalnych do bardzo wysokich poziomów, innymi słowy, od ryzyka powszechnie akceptowanego do czynników akceptowanych warunkowo. Wskazano także, że nieregularne działanie elementów hydraulicznych i hydro-technicznych w ramach urządzeń składowiska stanowi czynnik mający największy wpływ na podniesienie poziomu ryzyka.
Źródło:
Archives of Mining Sciences; 2018, 63, 1; 165-181
0860-7001
Pojawia się w:
Archives of Mining Sciences
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Application of the Job Safety Analysis (JSA) Method to Assessment Occupational Risk at the Workplace of the Laser Cutter Operator
Autorzy:
Palega, Michal
Powiązania:
https://bibliotekanauki.pl/articles/2023966.pdf
Data publikacji:
2021-09
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
work environment
threats
occupational risk
occupational health and safety
laser cutout operator
JSA method
matrix method
occupational risk assessment
Opis:
Occupational risk is closely related to work environment. For the same positions, but in different working conditions threats and level of risk can be different. For this also estimating the degree of damage hazard the largest possible should be adopted effects. However, when estimating probability occurrence of threats should include, among others: working conditions, events from the past, or possible employee behavior (in particular those that may be the cause of an accident at work). The source of the above information may be data from statistics or observations of work stations. The article presents the assessment of occupational risk at the position of the laser cutter operator, which was carried out using the Job Safety Analysis (JSA) method. According to this method, occupational risk is determined on the basis of two parameters, i.e.: consequences of C and probability of consequences P. In turn, the probability of consequences is the sum of three factors: frequency of hazard F, probability of event O and avoidability or damage limitation A.
Źródło:
Management and Production Engineering Review; 2021, 13, 3; 40-50
2080-8208
2082-1344
Pojawia się w:
Management and Production Engineering Review
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-5 z 5

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies