Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Wyszukujesz frazę "impact method" wg kryterium: Temat


Wyświetlanie 1-2 z 2
Tytuł:
Dynamic performance of bridge piers impacted by heavy trucks
Autorzy:
Huang, Yao
Powiązania:
https://bibliotekanauki.pl/articles/27312166.pdf
Data publikacji:
2023
Wydawca:
Polska Akademia Nauk. Czasopisma i Monografie PAN
Tematy:
ciężarówka
uderzenie pojazdu
most
metoda elementów skończonych
zabezpieczenie
wydajność dynamiczna
heavy truck
vehicle impact
bridge
finite element method
anti-impact protection
dynamic performance
Opis:
Vehicle-bridge collision accidents often result in significant economic losses and negative social effects, with heavy trucks being the most destructive to bridge structures. Therefore, this study uses a high-precision finite element method to investigate the impact resistance of concrete bridge piers when subjected to heavy truck impact. The main conclusions of this paper are as follows: (1) When heavy trucks collide with bridge piers, two peak impact forces are generated due to engine and cargo collisions. The peak collision force generated by engine impact is 17.7% greater than that generated by cargo impact. (2) The damage to the bridge, when impacted by heavy trucks, is mainly concentrated on the affected pier. The primary damage characteristics of the bridge piers include punching shear damage at the impact point, tensile damage at the backside, and shear damage at the pier top. (3) The peak values of shear force and bending moment both appear at the bottom of the pier, and the combination of the two causes serious flexural-shear failure damage at the bottom of the pier. (4) The axial force is fluted along the pier height, and the axial force at the top and bottom of the pier is the largest, while the axial force at the middle section is relatively small. The instantaneous axial force of bridge pier will reach more than 2 times the axial force during operational period, seriously threatening the safety of bridge. Overall, this study provides valuable insights into the impact resistance of concrete bridge piers when subjected to heavy truck impact, which can help engineers and policymakers in designing more robust and safer bridges.
Źródło:
Archives of Civil Engineering; 2023, 69, 3; 173--185
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Risk assessment in railway rolling stock planning
Autorzy:
Gołębiowski, Piotr
Góra, Ignacy
Bolzhelarskyi, Yaroslav
Powiązania:
https://bibliotekanauki.pl/articles/27311787.pdf
Data publikacji:
2023
Wydawca:
Polska Akademia Nauk. Czasopisma i Monografie PAN
Tematy:
railway rolling stock
transportation planning
risk assessment
risk impact estimation
Monte Carlo method
efficiency
tabor kolejowy
planowanie przewozów
ocena ryzyka
ocena wpływu
metoda Monte Carlo
efektywność
Opis:
Rolling stock planning is one of the steps in the traffic planning process considered from the railway undertaking's point of view. It is directly related to the efficiency of rolling stock utilisation, which should be ensured at the highest possible level in the case of rail transport. The planning work stage is subject to certain risks (threats and opportunities), which, if they materialise, will impact it. It, therefore, makes sense to carry out analyses that can anticipate specific events in good time and introduce appropriate countermeasures in advance. This article aims to conduct a risk assessment process concerning rolling stock planning. It was assumed that the considerations were carried out based on the M_o_R (Management of Risk) methodology. Based on this methodology, risk identification and risk analysis (estimation of risk impact) were carried out. Risk assessment was carried out using the Monte Carlo simulation method. The work identified sixteen risks that represent threats. The principle of risk description was used to identify risks. It requires indicating for each risk the reason for its occurrence and the effect it may have. As a part of risk estimation, variables were selected to assess each risk's impact on the objectives of the stage. Publicly available statistical data were used to define the variables. The variables were expressed in monetary units. The work identified five variables describing impact, which were assigned to the individual risks. As a triangular probability distribution was used for the variability of impact description, the variable's minimum, most likely, and maximum value was identified. A risk assessment was carried out for only two impact description variables (for those variables used to describe the impact of the most significant number of risks). For each variable, statistical parameters were indicated and analysed. The resulting value of the variable describing the impact was then read out for each percentile, and the expected value of the risk was calculated. A detailed risk assessment was made for the lower, middle and upper quartiles. A histogram of the incidence of each variable value was presented, and an assessment was made.
Źródło:
Archives of Transport; 2023, 65, 1; 137--154
0866-9546
2300-8830
Pojawia się w:
Archives of Transport
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-2 z 2

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies