Tytuł:
Reinforcement of cracked hollow-core slabs during the construction of the building
Autorzy:
Szeląg, Romuald
Powiązania:
https://bibliotekanauki.pl/articles/2172410.pdf
Data publikacji:
2022
Wydawca:
Centrum Rzeczoznawstwa Budowlanego Sp. z o.o.
Tematy:
hollow-core slabs
scratches
cracks
damage
reinforcements
płyta kanałowa
zadrapanie
pęknięcie
szkoda
wzmocnienie
Opis:
During the implementation of investment processes with the use of ready-made prefabricated elements, undesirable situations may occur that cause scratches, excessive deflections or damage. This is due to the fact that defects occur during transport, storage or incorrect loading of the elements. The conducted tests and technical assessments often allow the use of built-in elements, however, under the conditions of the need to make their reinforcements. This may be due to the scale of damage or defects made during molding and, as a consequence, the implementation of prefabricated elements with too low load capacity. Taking action each time should allow for the implementation of reinforcements of the elements, limiting the need to dismantle them, which would result in their irretrievable destruction. The implementation of reinforcements allows to reduce the generation of waste from new elements and allows for the proper management of already produced prefabricated elements. Used elements with reinforcements should be subject to technical inspection in the same periods as other structural elements. Proper implementation of repairs allows for the final effect to be similar to the parameters of elements free of technical defects. Due to the existing problem of damage to new elements of prefabricated channel ceilings, solutions have been developed that can be used to reinforce the elements without the need to dismantle them from the places of installation, while reducing the time spent on the process.
Źródło:
Inżynieria Bezpieczeństwa Obiektów Antropogenicznych; 2022, 4; 54--62
2450-1859
2450-8721
Pojawia się w:
Inżynieria Bezpieczeństwa Obiektów Antropogenicznych
Dostawca treści:
Biblioteka Nauki
Artykuł
    Wyświetlanie 1-1 z 1

    Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies