Tytuł:
Application of the work breakdown structure in determining cost buffers in construction schedules
Autorzy:
Połoński, M.
Powiązania:
https://bibliotekanauki.pl/articles/231132.pdf
Data publikacji:
2015
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
szacowanie kosztów
niepewność
koszt nieprzewidziany
bufor kosztu
struktura podziału pracy
projekt budowlany
cost estimating
uncertainty
contingent cost
cost buffer
work breakdown structure
construction project
Opis:
The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB) as separate tasks have been combined with relevant summary tasks by the starttostart (SS) relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB) has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS). The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.
Źródło:
Archives of Civil Engineering; 2015, 61, 1; 147-161
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Original model for estimating the whole life costs of buildings and its verification
Autorski model szacowania całości kosztów życia budynków i jego weryfikacja
Autorzy:
Plebankiewicz, E.
Zima, K.
Wieczorek, D.
Powiązania:
https://bibliotekanauki.pl/articles/230747.pdf
Data publikacji:
2019
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
cykl życia
całość kosztów życia
koszt cyklu życia
ryzyko
dodatek kosztowy
budynek
life cycle cost
whole life costs
annual cost equivalent
cost addition
risk
building
Opis:
The model for estimating the whole life costs of the building life cycle that allows the quantification of the risk addition lets the investor to compare buildings at the initial stage of planning a construction project in terms of the following economic criteria: life cycle costs (LCC), whole life costs (WLC), life cycle equivalent annual costs (LCEAC) and cost addition for risk (ΔRLCC). The subsequent stages of the model development have been described in numerous publications of the authors, while the aim of this paper is to check the accuracy of the model in the case of changing the parameters that may affect the results of calculations. The scope of the study includes: comparison of the results generated by the model with the solutions obtained in the life cycle net present value method (LCNPV) for time and financial input data, not burdened with the risk effect; the analysis of the variability of results due to changes in input data; analysis of the variability of results as a consequence of changing the sets of membership functions for input data and methods for defuzzification the result.
Model szacowania całości kosztów życia budynków umożliwiający kwantyfikację dodatku kosztowego za ryzyko, pozwala inwestorowi porównać budynki na wstępnym etapie planowania przedsięwzięcia budowlanego pod względem następujących kryteriów ekonomicznych: kosztów cyklu życia budynku (LCC – gdy inwestor nie będzie mógł notować przychodów); całości kosztów życia budynku (WLC – gdy oprócz ponoszenia kosztów w fazach cyklu życia budynku, inwestor będzie mógł notować również przychody); ekwiwalentu rocznych kosztów cyklu życia budynku (LCEAC – gdy długości trwania fazy eksploatacji będą różne); dodatku kosztowego za ryzyko w cyklu życia budynku (ΔRLCC – wyrażonego jako różnica w jednostkach walutowych pomiędzy wielkością kosztu cyklu życia budynku, która uwzględnia wpływ ryzyka, a wielkością kosztu cyklu życia budynku, która nie uwzględnia tego wpływu). W modelu, teoria zbiorów rozmytych łączona jest z najbardziej powszechną, dynamiczną metodą służącą do analizy efektywności ekonomicznej przedsięwzięć budowlanych na podstawie zdyskontowanych przepływów pieniężnych. Jest to metoda wartości bieżącej netto, zwana pod akronimami NPW (ang. net present worth) lub NPV (ang. net present value), która w modelu ma zastosowanie w wersji rozmytej (ang. fuzzy NPW lub fuzzy NPV). Dane wejściowe do modelu dzielą się na następujące parametry: czasowe CG (o charakterze globalnym), tj. czas trwania cyklu życia budynku Ti, przy czym Ti równy jest szacowanemu okresowi użytkowania budynku (ESLB – ang. estimated service life of a building); czasowe CL (o charakterze lokalnym), czyli czasy tik, tim, po których naliczane zostają odpowiednio k-ty okresowy koszt operacyjny lub m-ty okresowy przychód; finansowe FG (o charakterze globalnym), w postaci stopy dyskonta (r), która jest niezbędna do obliczenia wartości bieżącej netto danej kwoty pieniężnej w oparciu o jej wartość określoną w czasie przyszłym; finansowe FK (rozumiane jako koszty mogące zaistnieć w cyklu życia budynku), wśród których wyróżnia się koszty o charakterze rocznym – roczne koszty operacyjne (CopA,ij) oraz okresowym – kolejno koszty początkowe (Cin,i), okresowe koszty operacyjne (CopNA,ik) i koszty wycofania (Cwd,i); finansowe FP (rozumiane jako przychody mogące zaistnieć w cyklu życia budynku), czyli przychody o charakterze rocznym – roczne (IopA,il) oraz okresowym – kolejno okresowe przychody uzyskiwane w fazie eksploatacji budynku (IopNA,im) i przychody osiągnięte w fazie wycofania (Iwd,i). Do parametryzacji wymienionych powyżej danych wejściowych w modelu użyto wypukłych i normalnych liczb rozmytych. Celem niniejszego artykułu jest natomiast sprawdzenie poprawności działania modelu szacowania całości kosztów życia budynków umożliwiającego kwantyfikację dodatku kosztowego za ryzyko na ewentualność zmiany parametrów mogących wpływać na wyniki obliczeń.
Źródło:
Archives of Civil Engineering; 2019, 65, 2; 163-179
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Analysis of direct rework costs in Ukrainian construction
Analiza kosztów bezpośrednich robót naprawczych w projektach budowlanych na Ukrainie
Autorzy:
Trach, Roman
Lendo-Siwicka, Marzena
Pawluk, Katarzyna
Połoński, Mieczysław
Powiązania:
https://bibliotekanauki.pl/articles/1852547.pdf
Data publikacji:
2021
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
roboty naprawcze
czynnik
przyczyna
koszt
koszt bezpośredni
projekt budowlany
rework
factor
cause
cost
direct cost
construction
Opis:
The construction industry of Ukraine has a number of problems and barriers that hinder its development. The main problems affecting Ukraine are corruption, high level of opacity, inefficient use of resources and inefficient process management. Moreover, ineffective design and construction management reduce labor productivity and leads to reworks. Unfortunately, in Ukrainian construction industry most cases of rework have been accepted as a part of construction activities. Rework is one of the main factors in the growth of total costs and the excess of the schedule for the construction project. The problem of rework costs is important and needs to be studied more to alleviate these overruns in the future. However, rework data are usually quite difficult to obtain and most studies have been conducted in developed countries. It can be assumed that there is a greater probability of reworks and rework costs in developing countries than in the developed ones. Thus, the purpose of this article was to determine and systematize reworks factors, quantify amount of direct rework costs, determine the relationship between actual project costs, project duration variation and rework costs.
Przemysł budowlany Ukrainy ma wiele problemów i barier, które utrudniają jego rozwój. Główne problemy dotykające Ukrainę to korupcja, nieefektywne wykorzystanie zasobów i zarządzanie procesami, które również przyczyniają się do zmniejszenia wydajności pracy i potrzeby prowadzenia robot naprawczych. Niestety, w Ukrainie na rynku budowlanym istnieje przyzwolenie na powstawanie dodatkowych prac w trakcie lub po zakończeniu prac nad danym przedsięwzięciem. Roboty naprawcze są jednym z głównych czynników wzrostu całkowitych kosztów i przekroczeń harmonogramów projektów budowlanych. Problem kosztów robót naprawczych jest bardzo istotny i należy go bardziej zbadać, aby móc zapanować nad tymi kosztami w przyszłości. Na podstawie publikowanych danych przyjmuje się, że średnia wartość kosztów tych robót wynoszą ok. 11 % pierwotnej wartości zamówienia. Jednakże, dostęp do danych dotyczących prac naprawczych jest ograniczony, a większość badań na ten temat przeprowadzono w krajach rozwiniętych. Można założyć, że istnieje większe prawdopodobieństwo przeróbek i kosztów przeróbek w krajach rozwijających się niż w krajach rozwiniętych ze względu na braki regulacji lub respektowania przepisów. W związku z powyższym, celem niniejszego artykułu było określenie i usystematyzowanie czynników związanych z robotami naprawczymi, ilościowe określenie bezpośrednich kosztów tych robot, określenie związku między rzeczywistymi kosztami projektu, zmiennością czasu trwania projektu i kosztami robot naprawczych. W badaniu przeanalizowano osiem projektów budowlanych zrealizowanych w okresie od 2012 do 2017 roku na Ukrainie. Czynniki robot naprawczych zostały podzielone na cztery następujące grupy: rozbieżność w dokumentach prowadząca do bezpośrednich kolizji; błędy i pominięcia na etapie projektowania; błędy i pominięcia na etapie budowy; słaba / niewystarczająca współpraca między uczestnikami projektu. Następnie, Autorzy obliczyli wartości czynników kosztów robot naprawczych w każdym z ośmiu projektów i ich średnią wartość. Najwyższą średnią wartością wynoszącą 46% charakteryzował się czynnik „Rozbieżność w dokumentach prowadzących do bezpośrednich kolizji”. Ponadto, był on na pierwszym miejscu w rankingu dla sześciu z ośmiu analizowanych projektów. Drugim najważniejszym czynnikiem był „Błędy i pominięcia na etapie projektowania”, którego wartość była na poziomie 22%. Na trzecim miejscu przy osiągnieciu 17% znalazł się czynnik „Słaba / niewystarczająca współpraca między uczestnikami projektu”. W większości inwestycji, czynniki te były bardzo ważne i miały zasadnicze znaczenie dla generowania kosztów robót naprawczych. Natomiast, czynnik „Błędy i pominięcia na etapie budowy” miał średnią wartość 15%. Ponadto, w celu sprawdzenia istnienia powiazań między czynnikami, obliczono współczynnik korelacji Pearsona R dla par „Koszty robót naprawczych -> Rzeczywiste koszty projektu” oraz „Koszty robót naprawczych -> Zmienność czasu trwania projektu”, który wyniósł odpowiednio 0,86 i 0,90. Wartości współczynników wskazują, że siła związku między czynnikami jest wysoka zgodnie ze skalą Chaddocka. Można zatem stwierdzić, że w przedsięwzięciach budowlanych w Ukrainie istnieje wpływ kosztów robót naprawczych na zmianę kosztów projektu i czas jego trwania. Obliczona przez nas średnia wartość kosztów robót naprawczych jest ogólnym wskaźnikiem, który wskazuje na poziom tych kosztów dla konkretnego zestawu projektów i nie może być wskaźnikiem dla całej branży. Jednak na podstawie tego wskaźnika można ocenić ewentualny poziom negatywnego wpływu zmian na wyniki projektu budowlanego i prognozować działania mające na celu jego zmniejszenie.
Źródło:
Archives of Civil Engineering; 2021, 67, 2; 397-411
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Life cycle cost modelling of buildings with consideration of the risk
Modelowanie kosztów cyklu życia obiektów budowlanych z uwzględnieniem ryzyka
Autorzy:
Plebankiewicz, E.
Zima, K.
Wieczorek, D.
Powiązania:
https://bibliotekanauki.pl/articles/230280.pdf
Data publikacji:
2016
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
ocena cyklu życia
koszt cyklu życia
zbiór rozmyty
koszt inwestycyjny
obiekt budowlany
ryzyko
life cycle assessment (LCA)
life cycle cost (LCC)
fuzzy set
investment cost
building object
risk
Opis:
The paper presents an approach to evaluating a building throughout its whole life cycle in relation to its sustainable development. It describes basic tools and techniques of evaluating and analysing the costs in the whole life cycle of the building, such as Life Cycle Assessment, Life Cycle Management, Life Cycle Cost and Social Life Cycle Assessment. The aim of the paper is to propose a model of cost evaluation throughout the building life cycle. The model is based on the fuzzy sets theory which allows the calculations to include the risks associated with the sustainable development, with the management of the investment and with social costs. Costs incurred in the subsequent phases of the building life cycle are analysed and modelled separately by means of a membership function. However, the effect of the analysis is a global cost evaluation for the whole life cycle of the building.
W artykule scharakteryzowano tematykę związaną z cyklem życia obiektów budowlanych. Szczególną uwagę zwrócono na zagadnienia ryzyka związanego z kosztami w cyklu życia. W artykule przedstawiono metodę oceny obiektu budowlanego w cyklu życia, biorącą pod uwagę aspekt jego zrównoważonego rozwoju. Zaprezentowany został model oceny kosztów cyklu życia obiektu budowlanego, który oparty jest na teorii zbiorów rozmytych, co pozwala na uwzględnienie w obliczeniach czynników ryzyka związanych np. ze zrównoważonym rozwojem, prowadzeniem inwestycji czy poszczególnymi rodzajami kosztów. Koszty ponoszone w kolejnych fazach cyklu życia budynku rozpatrywano i modelowano oddzielnie za pomocą funkcji przynależności. Efektem analizy jest globalna ocena kosztów w ujęciu całego cyklu życia budynku.
Źródło:
Archives of Civil Engineering; 2016, 62, 2; 149-166
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Integrated analysis of costs and amount of greenhouse gases emissions during the building lifecycle
Zintegrowana analiza kosztów i wielkości emisji gazów cieplarnianych w czasie życia budynku
Autorzy:
Zima, Krzysztof
Powiązania:
https://bibliotekanauki.pl/articles/1852546.pdf
Data publikacji:
2021
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
kosztorysowanie
ślad węglowy
budownictwo
cykl życia budynku
cost estimation
carbon footprint
construction
building life cycle
Opis:
More than 6 billion square metres of new buildings are built each year. This is about 1.2 million buildings. If we translate these figures into carbon footprint (CF) generated during the construction, it will be approximately 3.7 billion tons of carbon dioxide. The contractors all over the world – also in Poland - decide to calculate the carbon footprint for various reasons, but mostly they are compelled to do so by the market. The analysis of costs and emissions of greenhouse gases for individual phases of the construction system allows implementing solutions and preventing a negative impact on the environment without increasing the construction costs. The share of each phase in the amount of produced carbon for construction and use of the building depends mainly on the used materials and applied design solutions. Hence, the materials and solutions with lesser carbon footprint should be used. It can be achieved by using natural materials or materials which do not need much energy to be produced. The author will attempt to outline this idea and present examples of integrated analysis of costs and amount of carbon footprint during the building lifecycle.
Analiza kosztów i wielkości emisji gazów cieplarnianych dla poszczególnych faz procesu budowlanego pozwala wdrażać rozwiązania i przeciwdziałać negatywnemu wpływowi na środowisko, bez zwiększania kosztów budowy. Udział w każdej z faz ilości wyprodukowanego węgla na potrzeby wybudowania i użytkowania budynku zależy przede wszystkim od wykorzystanych w nim materiałów oraz przyjętych rozwiązań projektowych. Należy więc stosować materiały i rozwiązania o mniejszym śladzie węglowym. Ślad węglowy zdefiniowany przez normę ISO 14067 [6] to suma emisji i pochłaniania gazów cieplarnianych, wyrażona jako ekwiwalent CO2 i oparta na ocenie cyklu życia z uwzględnieniem ich wpływu zmiany klimatu. Spośród gazów cieplarnianych emisja dwutlenku węgla jest największa i stanowi ponad 80% całkowitej emisji gazów cieplarnianych. Można to osiągnąć przez wykorzystywanie materiałów pochodzenia naturalnego lub tych, których produkcja nie pochłania dużo energii. W artykule autor chciał przybliżyć ideę oraz pokazać na przykładach zintegrowaną analizę kosztów i wielkości śladu węglowego w cyklu życia budynku. Kalkulację śladu węglowego, ale i kalkulację kosztów mozna rozpatrywać na dowolnym poziomie szczegółowości. W artykule autor przedstawił kalkulacje na przykładzie wybranego materiału, ale i przykładowych budynów analizując ślad węglowy w fazie produkcji i w fazie budowy oraz koszty zakupu materiałów i koszty budowy obiektu budowlanego. Prezentowane podejście porównawcze polegające na zintegrowanych obliczeniach emisji CO2 i kosztów przedstawione w artykule może być wykorzystane przez decydentów, do podejmowania wczesnych decyzji projektowych. Rozwiązania projektowe, technologia wykonania i użyte materiały odgrywają znaczącą rolę w ogólnym koszcie i charakterystyce węglowej konstrukcji Decyzje wpływające na równowagę między kosztem, a wydajnością węglową składowych elementów konstrukcyjnych powinny być podejmowane wcześnie. Ustalenia te są znaczące, ponieważ ostateczne decyzje projektowe muszą być skutecznie koordynowane z szerszym zespołem projektowym. Pokazane w artykule przykłady udowadniają, że można zmniejszyć ślad węglowy realizowanych robót budowlanych, bez konieczności zwiększania kosztów robót budowlanych. Kalkulację śladu węglowego wraz z kalkulacjami kosztów mozna rozpatrywać na dowolnym poziomie szczegółowości. Efektem obliczeń może być znaczne zmniejszenie emisji gazów cieplarnianych, co jest obecnie istotnym celem UE zgodnie z postanowieniami porozumienia klimatycznego z Paryża.
Źródło:
Archives of Civil Engineering; 2021, 67, 2; 413-423
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Analysis of the selection of materials for road construction taking into account the carbon footprint and construction costs
Koszty materiałów drogowych w ujęciu kryterium minimalizacji wartości miary śladu węglowego
Autorzy:
Wieczorek, Damian
Zima, Krzysztof
Powiązania:
https://bibliotekanauki.pl/articles/2174018.pdf
Data publikacji:
2022
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
kosztorysowanie
materiał budowlany
materiał drogowy
ślad węglowy
carbon footprint
cost estimation
construction material
road material
Opis:
The analysis of the costs and emissions of greenhouse gases for individual phases of construction investments allows for the implementation of solutions and the prevention of negative environmental impacts without significantly increasing construction costs. The share of individual investment phases in the amount of carbon dioxide (CO2) produced for the construction and use of buildings depends mainly on the materials used and the implemented design solutions. In accordance with the idea of sustainable construction, materials and design solutions with the lowest possible carbon footprint should be used. This can be achieved by using natural building materials, materials subjected to appropriate chemical composition modifications, or materials in which their production does not require large amounts of energy. The aim of the article is to determine the value of the purchase costs of selected road materials (concrete paving blocks, cement-sand bedding, concrete curbs, semi-dry concrete and concrete underlay, washed sand, and crushed aggregate with a fraction of 0-31.5 mm) for the implementation of a road investment. In addition, the authors focused on determining the size of the embodied carbon footprint due to GHG (greenhouse gas) emissions and GHG removals in a product system, expressed as CO2 equivalents for the same materials that were subjected to cost analyzes. The article presents the results of original analyzes, and indicates the optimal solutions in terms of minimizing the cost of purchasing road materials and minimizing the carbon footprint. The discussion also covers the issue of changing the chemical composition in the context of the potential impact on the reduction of material costs and CO2 equivalent emissions.
Analiza kosztów i emisji gazów cieplarnianych dla poszczególnych faz inwestycji budowlanych pozwala na wdrożenie rozwiązań i zapobieganie negatywnemu wpływowi na środowisko bez znaczącego zwiększania kosztów budowy. Udział poszczególnych faz inwestycji w ilości wytworzonego dwutlenku węgla (CO2) do budowy i użytkowania obiektów budowlanych zależy głownie od zastosowanych materiałów i wdrożonych rozwiązań projektowych. Zgodnie z ideą budownictwa zrównoważonego, winno się stosować materiały i rozwiązania projektowe o możliwie najmniejszym śladzie węglowym. Celem artykułu jest określenie wielkości kosztów nabycia wybranych materiałów drogowych na wykonanie inwestycji drogowej. Dodatkowo autorzy skupili się na określeniu wartości wbudowanego śladu węglowego w procesie produkcji budowlanej, który wyrażany jest w postaci ekwiwalentu CO2 dla tych samych materiałów, które poddano analizom kosztowym. W artykule przedstawiono wyniki autorskich analiz, wskazano rozwiązania optymalne z uwagi na minimalizacje kosztów nabycia materiałów drogowych i minimalizację śladu węglowego.
Źródło:
Archives of Civil Engineering; 2022, 68, 3; 199--219
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Risk of alterations to project documentation on an example of environmental engineering construction
Autorzy:
Rybka, I.
Bondar-Nowakowska, E.
Powiązania:
https://bibliotekanauki.pl/articles/231510.pdf
Data publikacji:
2013
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
projekt budowlany
dokumentacja projektowa
zmiana
koszt
harmonogram
ryzyko
construction project
project documentation
alteration
cost
schedule
risk
Opis:
Investor bears responsibility for proper preparation of the investment process. One of his tasks is to prepare the project documentation and obtaina building permit. Frequently, during his work, there are situations and events whose impact interferes with the design solutions. Regardless of reasons, alterations to a project constitute a source of cost risk. In each case, the Investor should be prepared for this type of a risk. Exposure to risk should be taken into account in the planning stage of the investment. Also, a model of investment execution should be chosen at this stage. The type of model is associated with the distribution of risk throughout the project. The aim of this paper is to identify events that generate risk related to alterations to Project Documentation in the context of the selection of the investment execution model.
Źródło:
Archives of Civil Engineering; 2013, 59, 4; 499-508
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Quantitative assessment of construction risk
Kwantytatywna ocena ryzyka budowy
Autorzy:
Kasprowicz, T.
Powiązania:
https://bibliotekanauki.pl/articles/231169.pdf
Data publikacji:
2017
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
warunki ryzyka
harmonogramowanie
kosztorysowanie
ocena ryzyka
wykresy ryzyka
risk conditions
scheduling
cost estimating
risk assessment
risk charts
Opis:
Construction risk assessment is the final and decisive stage of risk analysis. When highly changeable conditions of works execution are predicted, risk should be evaluated in the favorable, moderate, and difficult random conditions of construction. Given the random conditions, the schedule and cost estimate of the construction are developed. Based on these values, the risk of final deadline delay and the risk of total cost increase of construction completion are calculated. Next, the charts of the risks are elaborated. Risk changes are shown in the charts and are analyzed in the range [1, 0].
Realizacja robót budowlanych na placu budowy jest podstawowym etapem przedsięwzięcia budowlanego. W praktyce, z punktu widzenia realizacji robót na placu budowy lub przebudowy, montażu, remontu lub rozbiórki obiektu budowlanego, ryzyko czasu i kosztów często powinno być dokładnie badane ze względu na wpływ zdarzeń losowych na przebieg i wyniki wykonania robót. Jest wiele publikacji na temat metod identyfikacji i oceny ryzyka. Jednak opublikowane metody nie rozwiązują problemów oceny ryzyka, które generowane jest przez proces realizacji robót na placu budowy i jego otoczenie. Proponowana metoda jest koncepcją ilościowej oceny ryzyka robót budowlanych na placu budowy. Jest to końcowy etap analizy ryzyka. Poprzedza go identyfikacja uwarunkowań ryzyka, które zależą od losowej technologicznej charakterystyki konstrukcji, losowej charakterystyki dostępnych zasobów oraz losowych warunków realizacji robót.
Źródło:
Archives of Civil Engineering; 2017, 63, 2; 55-66
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Pre-design cost modeling of facade systems using the GAM method
Przedprojektowe modelowanie kosztów systemów elewacyjnych z wykorzystaniem modeli GAM
Autorzy:
Leśniak, Agnieszka
Górka, Monika
Powiązania:
https://bibliotekanauki.pl/articles/1852385.pdf
Data publikacji:
2021
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
system elewacyjny
budynek użyteczności publicznej
szacowanie kosztów
model addytywny
facade system
public building
cost estimate
generalized additive model
Opis:
The cost estimation at the pre-project stage provides an important decision-making indicator for the future of the project. With a preliminary cost estimation, project participants can make financial decisions and cost control. The aim of this paper is to propose a model for estimating the costs of facade systems before the pre-design stage, using the GAM (Generalized Additive Model) method. The commonly used method for the valuation of facade systems is based on individual calculation. Such valuation process is complicated and time consuming. For this reason the search for a new forecasting method is justified. The database developed for modelling purposes includes 61 cases of real costs of system façade execution for public buildings. Each case is described by 16 parameters (namely, input variables). The average absolute percentage error (MAPE) was used to assess the model, which takes the value of 14,26% for the generalized model with a logarithmic binding function and 11.77% for the model with an identity binding function. On the basis of the studies and the results obtained, it can be concluded that the constructed model is useful and can improve the process of forecasting system façade costs at the pre-projection stage.
Prawidłowe realizowanie danego przedsięwzięcia budowlanego to połączenie wielu współzależnych działań, którego celem jest zaspokojenie potrzeb budowlanych zarówno inwestora jak i użytkownika obiektu budowlanego. Należy nie tylko zwracać uwagę na materiał użyty do budowy, nadbudowy czy remontu budynku zgodny z ideą zrównoważonego budownictwa, ale także na metodę i sposób realizacji. Każda realizacja powinna być dokładnie zaplanowana w czasie, przy założonym koszcie i jakości. Dlatego te trzy parametry są częstym tematem publikacji. Poszukiwane są metody optymalizacji harmonogramów oraz kosztów przedsięwzięcia budowlanego, wykorzystujące narzędzia matematyczne, jak regresja, sztuczne sieci neuronowe, wnioskowanie z przypadku, dodatkowo szacowane jest ryzyko poszczególnych etapów procesu budowlanego, aby zminimalizować niepewność i poziom niepowodzenia inwestycji. Prawidłowe i zrównoważone połączenie wszystkich aspektów decyduje o sukcesie inwestora oraz wykonawcy. Zarówno dla inwestora jak i wykonawcy oszacowanie kosztów realizacji jest istotnym elementem planowania każdego przedsięwzięcia budowlanego. Bardzo często już w fazie przedprojektowej uczestnicy przedsięwzięcia podejmują działania zmierzające do oszacowania kosztów planowanych do wykonania robót budowlanych. Wczesne oszacowania kosztów robót umożliwia podjęcie decyzji o realizacji przedsięwzięcia i zaplanowanie budżetu. Podstawą prognozy kosztów jest analiza projektu, koncepcyjnego a dokładność opracowań graficznych i opisowych wpływa na stopień szczegółowości kalkulacji kosztowych na etapie poprzedzającym podstawowe prace projektowe. Dopuszczalne jest, że w przyszłości koszty te mogą ulec zmianie z powodu przyjęcia innych szczegółowych rozwiązań projektowych, podniesienia jakości wykonania, czy nieprzewidywalnych warunków, które wykonawca może napotkać na budowie. W publikacji podjęto problem kalkulacji kosztów wykonania systemów elewacyjnych stosowanych w obiektach użyteczności publicznej. Wykonanie kalkulacji kosztów realizacji systemów fasadowych oraz elewacji wentylowanych jest zadaniem skomplikowanym i czasochłonnym. Autorzy podjęli próbę prognozowania kosztów realizacji systemów elewacyjnych z wykorzystaniem metody uogólnionych modeli addytywnych. Zadaniem uogólnionego modelu addytywnego jest maksymalizacja jakości przewidywań zmiennej zależnej Y z różnych dystrybucji, poprzez nieparametryczne funkcje zmiennych niezależnych. Do budowy modelu wykorzystano opracowaną bazę danych zawierającą wartości zidentyfikowanych przez autorów czynników (zmiennych niezależnych) wpływających na kształtowanie się kosztów wykonania systemów elewacyjnych (zmiennej zależnej).
Źródło:
Archives of Civil Engineering; 2021, 67, 3; 123-138
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Forecasting the course of construction project management in conditions of uncertainty
Prognozowanie przebiegu przedsięwzięć budowlanych w warunkach niepewności
Autorzy:
Konior, Jarosław
Powiązania:
https://bibliotekanauki.pl/articles/27312156.pdf
Data publikacji:
2023
Wydawca:
Polska Akademia Nauk. Czasopisma i Monografie PAN
Tematy:
zarządzanie przedsięwzięciem
przedsięwzięcie budowlane
koszt
przypadkowość
rozmytość
niepewność
ryzyko
czas
construction project management
cost
fuzziness
time
randomness
risk
uncertainty
Opis:
The methodology and research results presented in the article indicate the practical possibility of conducting optimization of construction project management course. The goal of the achievement leads to the rationalization of the management of investment tasks, in which there are a series of uncertain parameterized events. The goal was achieved through many years of the author’s own research, which was personally carried out on several hundred construction projects according to original methodology for assessing and forecasting the characteristic parameters of construction investments (cost and time) in conditions of uncertainty: from determinism, through probability and randomness, to fuzziness. The presented and documented achievement stands for accomplishment in project management of construction projects, where decision-making with an increasing degree of uncertainty takes place and requires the course of investment tasks that will be implemented in the future to be forecasted. In the conducted research and conclusions it was proven that construction processes should be considered as phenomena with random events and various degrees of uncertainty, to which methodology with developed modelling parameters should be used.
Metodyka i wyniki badań zaprezentowane w artykule wskazują na praktyczną możliwość optymalizacji kosztowej przebiegu przedsięwzięć budowlanych. Cel osiągnięcia prowadzi do racjonalizacji zarządzania zadań inwestycyjnych, w których występują sparametryzowane przeze mnie serie zdarzeń niepewnych. Cel został osiągnięty na drodze kilkunastoletnich badań własnych, które są prowadzone na kilkuset obiektach i budowach według autorskiej metodyki oceny i prognozy ich charakterystycznych parametrów (koszt i czas) w warunkach niepewności: od determinizmu, poprzez probabilistykę i przypadkowość, aż do rozmytości. Zarządzanie przedsięwzięciami budowlanymi i podejmowanie decyzji zarządczych następuje w rosnącym stopniu niepewności i wymaga prognozowania przebiegu zadań inwestycyjnych, które zostaną zrealizowane w przyszłości. W prezentowanych badaniach udowodniono, że procesy budowalne powinny być rozważane jako zjawiska ze zdarzeniami losowymi o różnym stopniu niepewności, do których stosować metodykę o zbliżonych parametrach modelowania.
Źródło:
Archives of Civil Engineering; 2023, 69, 3; 557--572
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Flexible adjustment of hotel facilities to market demand
Elastyczne dostosowanie obiektów hotelowych do wymagań rynkowych
Autorzy:
Milwicz, R.
Nowotarski, P.
Powiązania:
https://bibliotekanauki.pl/articles/230370.pdf
Data publikacji:
2016
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
LCC
koszt cyklu życia
elastyczność
próg rentowności
termomodernizacja
domek letniskowy
life cycle cost (LCC)
flexibility
breakeven point
thermomodernization
summer house
Opis:
Accommodation tourist industry is characterized by high variability. For this category of services not only the location is crucial- that does not change, but also the standard, prices and seasonality of services. In the recent years, leisure centers performing functions only during the summer time have seen the possibility to extend their activities beyond the summer months. The reasons for this are the local investments requiring qualified staff which comes from different parts of the country, Europe and the world while creating dernand for accommodations. To meet the possible demand needs and to adapt to cold season, performing thermo-modernization works is necessary. In order to find the best solution and answer those needs, analysis of the profitability of the investrnents in a chosen holiday resort was carried out. The article presents the results of the analysis based on the payback period, LCC analysis and assessment of the investments risk.
Branża turystyczno-noclegowa charakteryzuje się dużą zmiennością. Na zainteresowanie klientów ma wpływ nie tylko lokalizacja- która nie ulega zmianie, ale także standard, ceny oraz sezonowość usług. W ostatnich latach ośrodki pełniące funkcje jedynie letniskowe dostrzegają możliwość poszerzenia swojej działalności w miesiącach zimowych. Powodem tego stanu rzeczy są m.in. lokalne inwestycje wymagające wykwalifikowanej kadry, która to przyjeżdża z różnych rejonów kraju, Europy czy świata stwarzając popyt na miejsca noclegowe oraz gastronomiczne. Dodatkowo obserwuje się wzrost zainteresowania turystów wynajmem małych domków drewnianych w ostatnich latach na terenie Polski. Dostosowanie się do zaistniałych potrzeb wymaga adaptacji ośrodka do tzw. chłodnego sezonu. W celu znalezienia najodpowiedniejszego rozwiązania, w jednym z takich ośrodków, została przeprowadzona analiza opłacalności inwestycji termo-modernizacji obiektu. Autorzy niniejszego opracowania przeprowadzili analizę przypadku przy użyciu elastycznych narzędzi do planowania i zarządzania budową oraz za pomocą metody LCC. Użyto przy tym danych historycznych uzyskanych od właściciela, oraz przewidywanego zainteresowania zarówno krótko- jak długoterminowego wynajmu obiektu w kolejnych latach. W celu porównania kilku możliwych opcji rozwiązań, zgodnie z metodologią LCC, należy działać według przyjętego algorytmu. Wymienione poniżej kroki stanowią podstawę podejmowania decyzji dotyczących inwestycji.
Źródło:
Archives of Civil Engineering; 2016, 62, 2; 135-147
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Costs of facade systems execution
Koszty wykonania systemów elewacyjnych
Autorzy:
Leśniak, Agnieszka
Wieczorek, Damian
Górka, Monika
Powiązania:
https://bibliotekanauki.pl/articles/230531.pdf
Data publikacji:
2020
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
system elewacyjny
szacowanie kosztów
model statystyczny
regresja wielokrotna
regresja krokowa
facade system
cost estimation
statistical model
multiple regression
stepwise regression
Opis:
Cost estimation in the pre-design phase both for the contractor as well as the investor is an important aspect from the point of view of budget planning for a construction project. Constantly growing commercial market, especially the one of public utility constructions, makes the contractor, at the stage of development the design concept, initially estimate the cost of the facade, e.g. office buildings, commercial buildings, etc., which are most often implemented in the form of aluminum-glass facades or ventilated elevations. The valuation of facade systems is of an individual calculation nature, which makes the process complicated, time-consuming, and requiring a high cost estimation work. The authors suggest using a model for estimating the cost of facade systems with the use of statistical methods based on multiple and stepwise regression. The data base used to form statistical models is the result of quantitative-qualitative research of the design and cost documentation of completed public facilities. Basing on the obtained information, the factors that shape the costs of construction façade systems were identified; which then constitute the input variables to the suggested cost estimation models.
Celem artykułu jest próba oszacowania kosztów wykonania systemów elewacyjnych obiektów użyteczności publicznej z wykorzystaniem modeli matematycznych, a w szczególności regresji wielorakiej oraz regresji krokowej postępującej. Dane użyte do budowy funkcji regresji zostały opracowane przez autorów na podstawie analizy dokumentacji projektowych, wykonawczych i kosztorysowych obiektów użyteczności publicznej. Opracowano bazę danych zawierającą główne czynniki wpływające na kształtowanie się kosztów wykonania systemów elewacyjnych obiektów użyteczności publicznej. Systemy elewacyjne realizowane były w formie fasad aluminiowo-szklanych oraz elewacji wentylowanych.
Źródło:
Archives of Civil Engineering; 2020, 66, 1; 81-95
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Effect of nano silica on mechanical properties and durability of normal strength concrete
Autorzy:
Gopinath, S.
Mouli, P.C.
Murthy, A.R.
Iyer, N.R.
Maheswaran, S.
Powiązania:
https://bibliotekanauki.pl/articles/230583.pdf
Data publikacji:
2012
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
nanokrzemionka
nanobeton
wytrzymałość na ściskanie
wytrzymałość na zginanie
RCPT
analiza kosztów
nano-silica
nanoconcrete
compressive strength
flexural strength
cost analysis
Opis:
Nano technology is an emerging field of interest for civil engineering application. Among the nano materials presently used in concrete, nano-silica possess more pozzolanic nature. It has the capability to react with the free lime during the cement hydration and forms additional C-S-H gel giving strength, impermeability and durability to concrete. Present paper investigates the effects of addition of nano silica in normal strength concrete. Three types of nano-silica in the form of nano suspension having different amount of silica content have been investigated. Mix design has been carried out by using particle packing method. X-Ray diffraction (XRD) analysis has been carried out to find the chemical composition of control concrete and nano modified concrete. Further, experimental investigations have been carried out to characterize the mechanical behaviour in compression, tension and flexure. It has been observed that the addition of nano-silica in normal strength concrete increased the compressive strength and decreased the spilt tensile strength and flexural strength. Also, Rapid chloride permeability test (RCPT) has been conducted to know the chloride permeability of control concrete, nano modified concrete, and nano coated concrete. It has been observed that the chloride permeability is less for nano coated concrete.
Źródło:
Archives of Civil Engineering; 2012, 58, 4; 433-444
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
The profitability analysis of enhancement of parameters of the thermal insulation of building partitions
Autorzy:
Życzyńska, A.
Cholewa, T.
Powiązania:
https://bibliotekanauki.pl/articles/230685.pdf
Data publikacji:
2014
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
efektywność energetyczna
energia końcowa
współczynnik przenikania ciepła
energia użyteczna
koszt ogrzewania
energy efficiency
final energy
heat transfer coefficient
useful energy
heating cost
Opis:
The energy saving tendencies, in reference to residential buildings, can be recently seen in Europe and in the world. Therefore, there are a lot of studies being conducted aiming to find technical solutions in order to improve the energy efficiency of existing, modernized, and also new buildings. However, there are obligatory solutions and requirements, which must be implemented during designing stage of the building envelope and its heating/cooling system. They are gathered in the national regulations. The paper describes the process of raising the energy standard of buildings between 1974–2021 in Poland. Therefore, the objective of this study is to show energy savings, which can be generated by modernization of thermal insulation of partitions of existing buildings and by the use of different ways of heat supply. The calculations are made on the selected multi-family buildings located in Poland, with the assumption of a 15 years payback time. It is shown that it is not possible to cover the costs of the modernization works by the projected savings with the compliance to the assumption of 15 years payback time.
Źródło:
Archives of Civil Engineering; 2014, 60, 3; 335-347
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł
Tytuł:
Model of construction subcontractors selection with time windows for their availability
Model decyzyjny wyboru podwykonawców budowlanych przy uwzględnieniu ich ograniczonej dostępności w czasie
Autorzy:
Biruk, S.
Jaskowski, P.
Krzemiński, M.
Powiązania:
https://bibliotekanauki.pl/articles/230854.pdf
Data publikacji:
2019
Wydawca:
Polska Akademia Nauk. Czytelnia Czasopism PAN
Tematy:
przedsięwzięcie budowlane
harmonogramowanie
wybór podwykonawcy
problem dyskretny
optymalizacja czasowo-kosztowa
construction project
scheduling
subcontractor selection
discrete problem
time-cost trade-off analysis
Opis:
Most construction projects involve subcontracting some work packages. A subcontractor is employed on the basis of their bid as well as according to their availability. A viable schedule must account for resource availability constraints. These resources (e.g. crews, subcontractors) engage in many projects, so they become at the disposal for a new project only in certain periods. One of the key tasks of a planner is thus synchronizing the work of resources between concurrent projects. The paper presents a mathematical model of the problem of selecting subcontractors or general contractor’s crews for a time-constrained project that accounts for the availability of contractors, as well as for the cost of subcontracting works. The proposed mixed integer-binary linear programming model enables the user to perform the time/cost trade-off analysis.
W artykule przedstawiono model matematyczny problemu wyboru podwykonawców lub brygad roboczych generalnego wykonawcy przy założeniu ograniczonej w czasie (poprzez okna czasowe) dostępności wykonawców robót budowlanych. Proponowany model matematyczny (mieszany, binarny model programowania liniowego) umożliwia przeprowadzenie analizy czasowo-kosztowej przedsięwzięcia budowlanego. Uwzględnienie na etapie planowania rzeczywistych terminów dostępności zasobów podwykonawców oraz ich ofert cenowych, które mają wpływ na koszt i czas trwania przedsięwzięcia, może dać wykonawcy przewagę konkurencyjną na rynku usług budowlanych. Dalsze badania autorów będą się koncentrowały na opracowaniu algorytmu opartego na metodzie podziału i ograniczeń dedykowanego do rozwiązywania prezentowanego problemu harmonogramowania przedsięwzięć budowlanych i oceny jego efektywności oraz złożoności obliczeniowej.
Źródło:
Archives of Civil Engineering; 2019, 65, 4; 295-307
1230-2945
Pojawia się w:
Archives of Civil Engineering
Dostawca treści:
Biblioteka Nauki
Artykuł

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies