Problemy konserwatorskie odbudowy i adaptacji zamku w Rydzynie CONSERVATION PROBLEMS INVOLVED IN REBUILDING AND REHABILITATION OF THE CASTLE AT RYDZYNA
The Castle at Rydzyna that was burnt out at the end
of hostilities in 1945 has, after many years, found
its new owner. The main parts of its shell are dating
as far back as to the eighties of the 17th century
when it has been built for the Voivode Raphael
Leszczyński With a simultaneous adaptation of me dieval
layout coming from the early years of the 15th
century. The modern castle erected prior to 1965 basing
on architectural design prepared by the royal
architect Giuseppe Simone Belotti as a four-wing
building with an internal court and four corner towers
formed probably the last in Poland link in the evolution
chain of the Pcggio Reale version of Serliani.
About 1700 the architect Pompeo Ferrari of Rome
reconstructed the northern wing providing it with an
oval-shaped vestibule; at the same time he rearranged
the Ball Room situated in the first floor just above
the vestibule.
After the fire in 1707 and the abdication of the King
Stanisław Leszczyński his land estates were, in 1738,
purchased by Aleksander Józef Sułkowski. It was
namely at that time that an architect invited from
Silesia has rebuilt the burnt out western and southern
portions of Castle, added the northern wall break
with a stair case, shaped the roofs and partly also
the facades. More representative and monumental as
to their character forms to the outhouses designed by
that Silesian architect were given in the 1780’s by the
royal architect Ignatius Graff.
In the great fire in 1945 totally demolished were the
roofs and nearly all the ceilings with their most rich
within the area of Great Poland seventeenth-century
decorations executed by artists formerly working for
the King John IHwhile adorning his summer residence
at Wilanów near Warsaw.
As a result of restoration the castle shell has been
brought to the raw building condition in the 1950’s
whereas the floors, windows and doors were provided
a few years later. For many years no user could be
found for the Castle as its adaptation to modern
uses, in view of its enormous volume, was both too
expensive and difficult. In 1969 the Association of
Polish Mechanical Engineers declared their readiness
to organize here a training centre and a home for
the Association members devoting themselves to creative
work. The basic design which was prepared by
„Miastoprojekt” Designing Office, Poznań has been
approved by all instances of the state conservation
service and also by a commission assessing inv e stment
projects. In the further phases, however, quite
considerable changes were introduced to design, aimed
at safeguarding of relics preserved from the medieval
castle and at preparing of such an architectural
solution of interiors that it could be possible, with
more favourable conditions prevailing in the future,
to carry out the full reconstruction of their decorations.
The author of the present report has prepared a set
of conservator’s outlines that in the form of architectural
drawings were elaborated by the architect Witold
Milewski.
The new user has gradually approved the proposals
presented to him and by his resigning of many
modern audio-visual installations and equipment
planned for the main representative rooms he provided
the possibility of their full reconstruction according
to 1:25 scale drawings which were prepared by
the architect J. Filipiak.
As a basis for that reconstruction served the pre-war
photographs of interiors of the Castle and greatly
helpful, too, proved the preserved drawing by J. Le
Pautre of whose decorative motifs and patterns a
broad use was made by the seventeenth-century designer
of decorations in the Rydzyna Castle; to some
extent as auxiliary and comparative materials were
used also the photographs and drawings of architectural
and decorative details to be found in the royal
residence at Wilanów. However, it has been resigned
of restoring of the eighteenth-century additions made
by I. Graff who in place of paintings by Palloni
has introduced the stucco and plaster of Paris
adornments.
The walls in the castle rooms w ill be covered with
decorative style-patterned tapestries. Only in the so
called Crystal Study the walls w ill be covered with
wainscots and mirrors in accordance with old descriptions
of that Castle. In Ball Room the ancient wooden
colonnade, will be rebuilt however, with the use of
new materials and techniques.
The new user has also decided that the ancient park
layout is to be recovered within the first, nearer to
the Castle, part of devasted and deserted park; the
other part, i.e. that on the other side of the transversally
running fosse will be maintained in the form
of a landscape park with its rich tree groupings that
were formed here during the first half of the 19th
century.
While preparing the reconstruction of the park it was
decided to adopt general forms created in the 18th
century; the bastion-like outline w ill be restored to
the island on which the Casttle is situated and on
its western side it will be connected with the town
of Rydzyna by means of a new, simple in its shape
bridge which the connection w ill be in full accordance
with an old townplanning concept of the King Stanisław
Leszczyński. The reconstruction of park has been
designed by the architect J. Szymański who prepared
its outlines in a specialized division of the Ateliers
for Conservation of Cultural Property, Wroclaw. All
the historical surveys and studies serving as the
basis for designing were prepared to order of J. Pic,
the voivodship conservator, Poznań who approved
all the until now prepared stages of design.
Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies
Informacja
SZANOWNI CZYTELNICY!
UPRZEJMIE INFORMUJEMY, ŻE BIBLIOTEKA FUNKCJONUJE W NASTĘPUJĄCYCH GODZINACH:
Wypożyczalnia i Czytelnia Główna: poniedziałek – piątek od 9.00 do 19.00