Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Tytuł pozycji:

Operational verification of a ship main power system element choice : case study

Tytuł:
Operational verification of a ship main power system element choice : case study
Autorzy:
Adamkiewicz, Andrzej
Powiązania:
https://bibliotekanauki.pl/articles/245251.pdf
Data publikacji:
2019
Wydawca:
Instytut Techniczny Wojsk Lotniczych
Tematy:
ship main power system
turbo-charging system
operational parameters
main engine
ship propeller
Źródło:
Journal of KONES; 2019, 26, 4; 7-14
1231-4005
2354-0133
Język:
angielski
Prawa:
CC BY: Creative Commons Uznanie autorstwa 4.0
Dostawca treści:
Biblioteka Nauki
Artykuł
  Przejdź do źródła  Link otwiera się w nowym oknie
The article refers to results and conclusions on post-emergency repairs of a turbo-charging system of a DEUTZ engine of the SBV 8M 628 type of 1715 kW – the main power unit of a cement carrier. The failure of the turbocharger led to severing of a part of the exhaust outlet valve head. In order to determine the cause of the turbocharger fault, parametric identification of the reference state of the turbocharging system interacting with the ship main power engine has been carried out. The post-emergency servicing of the turbocharger comprised mounting a new blade rim of expansive instruments of smaller capacity than the so far used. Control measurement results of the power system after the replacement of the turbocharger turbine nozzle have been presented. Limitations of correct engine operation have been noted in the range of maximum load with continuous power (MCR). A range of corrective maintenance servicing of fuel equipment has been presented. Using the values of measured torque at the propeller shaft, incorrect interaction between the shaft and the main engine has been noted. A new propeller, adequate to the design operational parameters of the engine characteristics, has been chosen and mounted. The correctness of turbine expansive instrument replacement has been verified by correct interaction between the elements of the power system: propeller – main engine – turbocharging system. Thus, a wider range of economically acceptable ship operation has been obtained.

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies