Approach to Impact Assessment of the Rated Power Uprate of NPP Unit on the Service Life of the Turbine Critical Elements

Tytuł:
Approach to Impact Assessment of the Rated Power Uprate of NPP Unit on the Service Life of the Turbine Critical Elements
Autorzy:
Chernousenko, Olga
Nikulenkova, Tetyana
Peshko, Vitaliy
Nikulenkov, Anatolii
Powiązania:
https://bibliotekanauki.pl/articles/1811575.pdf
Data publikacji:
2020
Wydawca:
Politechnika Koszalińska. Wydawnictwo Uczelniane
Tematy:
nuclear power plant
reliability
turbine
steam flow
computational fluid dynamics
high pressure rotor
service life
long-term strength
low cycle fatigue
Źródło:
Rocznik Ochrona Środowiska; 2020, Tom 22, cz. 1; 105-116
1506-218X
Język:
angielski
Prawa:
CC BY-SA: Creative Commons Uznanie autorstwa - Na tych samych warunkach 4.0
Dostawca treści:
Biblioteka Nauki
Artykuł
  Przejdź do źródła  Link otwiera się w nowym oknie
Nuclear power plants play an important role in power systems of many countries. Ability to reasonable increase installed capacity of nuclear power units allow to reduce the cost for building of new power plants. When increasing NPP capacity to 104% there is a need to estimate the residual life of plant’s typical elements and continue their operation. The mathematical model of estimation of service life indicators of steam turbine K-1000-60/3000 is developed. The effect of increasing the capacity of a nuclear reactor on the heat transfer coefficients of a steam in the nozzle segments of high-pressure cylinder was established by using CFD modeling. The thermal and stress-strain state of the high-pressure rotor for the most typical operating modes are calculated. Using the correlation dependences of low-cycle fatigue, the rate of accumulation of cyclic damage of the base metal is established. The resistance of the metal to the exhaustion of long-term strength is also determined. On the example of the high pressure rotor of the 3rd power unit of Rivne NPP the service life indicators are calculated. The validity of increasing the installed capacity of the power unit was also confirmed.

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies