A feeder automation (FA) system is usually used by electricity utilities to improve
power supply reliability. The FA system was realized by the coordinated control of feeder
terminal units (FTUs) in the electrical power distribution network. Existing FA testing
technologies can only test basic functions of FTUs, while the coordinated control function
among several FTUs during the self-healing process cannot be tested and evaluated. In this
paper, a novel cloud-based digital-physical testing method is proposed and discussed for
coordinated control capacity test of the FTUs in the distribution network. The coordinated
control principle of the FTUs in the local-reclosing FA system is introduced firstly and then,
the scheme of the proposed cloud-based digital-physical FA testing method is proposed and
discussed. The theoretical action sequences of the FTUs consisting of the FTU under test
and the FTUs installed in the same feeder are analyzed and illustrated. The theoretical action
sequences are compared with the test results obtained by the realized cloud-based simulation platform and the digital-physical hybrid communication interaction. The coordinated
control capacity of the FTUs can be evaluated by the comparative result. Experimental
verification shows that the FA function can be tested efficiently and accurately based on our
proposed method in the power distribution system inspection.
Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies
Informacja
SZANOWNI CZYTELNICY!
UPRZEJMIE INFORMUJEMY, ŻE BIBLIOTEKA FUNKCJONUJE W NASTĘPUJĄCYCH GODZINACH:
Wypożyczalnia i Czytelnia Główna: poniedziałek – piątek od 9.00 do 19.00