The article presents the use of BIM design method in geotechnical issues. BIM was used in the
modeling of high building “Mogilska Tower” in Cracow. The object, as one of the few in Cracow, will
have three underground storeys. High building with underground levels requires checking the impact
of the implementation of a deep excavation on existing buildings. Analysis of settlement impact
caused by deep excavation and the planned load of the building is based on the guidelines contained in
the ITB (KOTLICKI, WYSOKIŃSKI 2002) standards by the simplified method and detailed method
determined on the basis of numerical analysis. The article presents the results of the vertical
deformation of ground adjacent to the existing object. The results of the calculations were compared
with the limit values shown in ITB and PN-81/B-03020 (1985). Numerical analysis was performed in
the spatial state of stress and strain model. It takes into account the spatial layout of the geotechnical
subgrade and the terrain shape obtained by the measurement of terrestrial laser scanner. Subgrade
was modeled elastic-plastic model of Mohr-Coulomb with linear condition of plasticity. Identified the
influence and range of deep excavation and loads of the planned high building on existing
development.
Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies
Informacja
SZANOWNI CZYTELNICY!
UPRZEJMIE INFORMUJEMY, ŻE BIBLIOTEKA FUNKCJONUJE W NASTĘPUJĄCYCH GODZINACH:
Wypożyczalnia i Czytelnia Główna: poniedziałek – piątek od 9.00 do 19.00