The paper covers the theoretical background and tests of two asynchronous squirrel cage generators connected
to voltage source inverters working in parallel. Inverters were connected in parallel by their intermediate direct
current circuits by means of auctioneering diodes, and then to a DC power network. The real-time control algorithm
of digital signal processor DSP and field-programmable gate array FPGA was used to achieve proper
excitation of two different power machines, and to maintain high enough levels of direct current link voltage.
Windings of both generators are fed by use of so-called machine side inverters. The asynchronous generator is
a voltage source inverter controlled by a field-oriented control algorithm based on the current machine model.
To prove robustness of the chosen algorithm, different types of load were applied while generators and inverters
worked in parallel.
Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies
Informacja
SZANOWNI CZYTELNICY!
UPRZEJMIE INFORMUJEMY, ŻE BIBLIOTEKA FUNKCJONUJE W NASTĘPUJĄCYCH GODZINACH:
Wypożyczalnia i Czytelnia Główna: poniedziałek – piątek od 9.00 do 19.00