During a blackout, after the post-disaster collapse of an electric power system
(EPS), units of thermal power plants should switch-over to the house load operation mode
(PPW). However, regarding the dynamics of a post-disaster blackout process, many units can
be in forced outage Therefore, restart of these units from the start-up sources with a self-start
capability is necessary. The Transmission Network Code in force imposes periodic tests and
system tests for such sources. Any system test must be preceded and followed by simulation
investigations in which the possibilities: (1) to bring voltage to the started-up power plant
by a starting path and (2) to activate the highest-power auxiliaries (PW) of the unit being
started-up are evaluated. In the paper, chosen results of simulative investigations of the
transient phenomena in the starting path from the hydroelectric power plant of Włocławek
(HPP Włocławek) to the thermal power plant of Pątnów (w (TPP Pątnów), related to the system
test conducted in September 2017 have been presented.
Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies
Informacja
SZANOWNI CZYTELNICY!
UPRZEJMIE INFORMUJEMY, ŻE BIBLIOTEKA FUNKCJONUJE W NASTĘPUJĄCYCH GODZINACH:
Wypożyczalnia i Czytelnia Główna: poniedziałek – piątek od 9.00 do 19.00