Informacja

Drogi użytkowniku, aplikacja do prawidłowego działania wymaga obsługi JavaScript. Proszę włącz obsługę JavaScript w Twojej przeglądarce.

Tytuł pozycji:

Construction deviation control method of transverse super large inclined asphalt pavement

Tytuł:
Construction deviation control method of transverse super large inclined asphalt pavement
Autorzy:
Qi, Yongzheng
Ma, Wengang
Zhang, Jiesheng
Powiązania:
https://bibliotekanauki.pl/articles/27312134.pdf
Data publikacji:
2023
Wydawca:
Polska Akademia Nauk. Czasopisma i Monografie PAN
Tematy:
poligon samochodowy
pętla szybkich prędkości
powierzchnia bardzo duża
powierzchnia nachylona
nawierzchnia drogi
nawierzchnia asfaltowa
odchylenie konstrukcji
metoda kontroli
automobile testing ground
high speed loop
super large surface
inclined surface
road surface
asphalt pavement
construction deviation
control method
Źródło:
Archives of Civil Engineering; 2023, 69, 2; 165--176
1230-2945
Język:
angielski
Prawa:
CC BY-NC-ND: Creative Commons Uznanie autorstwa - Użycie niekomercyjne - Bez utworów zależnych 3.0 PL
Dostawca treści:
Biblioteka Nauki
Artykuł
  Przejdź do źródła  Link otwiera się w nowym oknie
The speed of test vehicles on the high-speed car track of the automobile test field is very high. Reducing the construction error of asphalt pavement is very important to ensure the safety of the test vehicle. In order to realize the paving of asphalt concrete pavement with super-large lateral inclination in the curve section of the high-speed car track in the automobile test field, a special paving control device and control method for the construction on the curve section with super-large lateral inclination were developed. Use the direction of the hanging hammer under the GPS device of paver to adjust the position of GPS device in real time, so that the geometric centre line of GPS device is always perpendicular to the horizontal plane. The reference control line is preset in the paver operation control device, and the lateral displacement deviation of the paver is adjusted to synchronize the data of the paver control device with the travel route. The precise control of the paver’s forward route is realized, the construction precision of the super-large inclined asphalt pavement on the high-speed car track of the automobile test field is achieved, and the construction efficiency is greatly improved. It has important reference value for similar projects such as automobile testing field and racing track.

Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies