Sections of the superconducting magnets of the SIS100 particle accelerator,
under construction at the Facility for Antiproton and Ion Research (FAIR), the Society for
Heavy Ion Research (GSI), Darmstadt, are going to be connected with the by-pass lines.
Each line will be used to transfer a two-phase helium flow and an electric current. The
electric current will be carried by four pairs of superconducting Nuclotron-type cables.
Fast-ramping currents are expected to cause the generation of heat within the cables. In this
work the results of a numerical thermal analysis of a bus-bar are presented. The amount
of heat transferred from the environment was found based on geometric dimensions of the
line and applied insulation. The amount of hysteresis loss, generated in the cable during the
operation under most demanding regime of the operation of the accelerator, was calculated.
According to the amount of the generated heat, the amount of the hysteresis loss is low in
relation to the heat generated in the superconducting magnets. Also it was found that the
cable used in the line still retains a large margin of current-carrying capacity.
Ta witryna wykorzystuje pliki cookies do przechowywania informacji na Twoim komputerze. Pliki cookies stosujemy w celu świadczenia usług na najwyższym poziomie, w tym w sposób dostosowany do indywidualnych potrzeb. Korzystanie z witryny bez zmiany ustawień dotyczących cookies oznacza, że będą one zamieszczane w Twoim komputerze. W każdym momencie możesz dokonać zmiany ustawień dotyczących cookies
Informacja
SZANOWNI CZYTELNICY!
UPRZEJMIE INFORMUJEMY, ŻE BIBLIOTEKA FUNKCJONUJE W NASTĘPUJĄCYCH GODZINACH:
Wypożyczalnia i Czytelnia Główna: poniedziałek – piątek od 9.00 do 19.00